§ 23-156 — Permitting procedures and requirements
Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-156
Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/76334d3f-ce95-437e-895d-f64be4a50bea
Sec. 23-156. - Permitting procedures and requirements.
(a) General. Projects requiring a Stormwater Management Permit and Land Disturbance Permit shall be required to submit the materials as specified in this section, and are required to meet the criteria as specified in this Manual. (b) Permit required. (1) No land owner or land operator shall receive any of the building, grading or other land development permits required for land disturbance activities without first meeting the requirements of this Manual prior to commencing the proposed activity. (2) Should a land-disturbing activity associated with an approved plan in accordance with this section not begin during the 365-day period following permit issuance, the approved plan shall be resubmitted to the stormwater authority to reevaluate the existing and proposed stormwater management plan to determine whether the plan still satisfies local program requirements and to verify that all design factors are still valid. If the authority finds the previously filed plan to be inadequate, a modified plan shall be submitted and approved prior to the commencement of land-disturbing activities. (c) Entry. Filing an application for a permit grants the Stormwater Authority, or its agent, permission to enter the site to verify the information in the application and to inspect for compliance with the resulting permit. (d) Fees. The stormwater authority shall obtain with each submission an application fee established by the stormwater authority to cover expenses connected with the review of the Stormwater Management Permit, the Land Disturbance Permit and a technical review fee sufficient to cover professional review services for the project. The stormwater authority is authorized to retain a registered professional engineer and other professional consultant to advise the stormwater authority on any or all aspects of these plans. Applicants shall pay review fees before the review process may begin. (1) Rules. a. Application fees are payable at the time of application and are non-refundable. b. Application fees shall be calculated by the stormwater authority in accordance with the permit application fee assessment and as discussed in this section of this Manual. c. These fees are in addition to any other local or state fees that may be charged under any other law, ordinance, or local ordinance. d. The fee schedule may be reduced or increased by the stormwater authority. Any such change shall be made at a posted public hearing of the stormwater authority not less than ninety (90) days prior to the date upon which the change is to be effective. (2) Application fees. a. A non-refundable application fee of the amount specified on the permit applications shall be due payable to the City of Brockton at the time an application is filed. Except that application fee is not required for administrative land review. (3) Engineering and consultant reviews and fees. a. The stormwater authority is authorized to require an applicant to pay a fee for the reasonable costs and expenses for specific expert engineering and other consultant services deemed necessary by the stormwater authority to come to a final decision on the application. This fee is called the "Engineering and Consultant Review Fee." b. Payment may be required at any point in the deliberations prior to a final decision. c. Consultant fees shall be determined at the time of project review based on a specific scope of work, and shall be calculated by the stormwater authority. d. The services for which a fee may be utilized include, but are not limited to, engineering design review, wetland survey and delineation review, hydrologic and drainage analysis review, wildlife evaluation review, stormwater quality analysis review, site inspections, as-built plan review, and analysis of legal issues. e. The stormwater authority is authorized to require an applicant to pay reasonable costs and expenses for certain activities which utilize the services of city staff. This includes such activities as inquiries concerning potential projects as well as site inspections not associated with a pending permit application; work that is required for the applicant's convenience, to be performed outside normal 8:00 a.m. to 4:30 p.m., City of Brockton working hours. f. The stormwater authority may require any applicant to pay an additional long term inspection fee for future inspections to be performed by city staff after a certificate of completion has been issued. g. The stormwater authority may require any applicant to pay an additional fee of forty dollars ($40.00) per hour for review, inspection and monitoring services for any project filing that requires an excess of four (4) hours of review, inspection, and monitoring time by a city staff member. h. Subject to applicable law, any unused portion of any fees collected shall be returned by the stormwater authority to the applicant within forty-five (45) calendar days of a written request by the applicant, unless the Stormwater authority decides in a public meeting that the remaining funds will be applied to necessary, but pending review/inspection action on the same project. i. The engineering and consultant review fees collected under this section shall be deposited in a revolving account. The stormwater authority shall include a full accounting of the revolving account as part of its annual report to the city. (4) Revision of fee schedules. The stormwater authority may revise its fee schedules periodically as to cover the cost of its permitting work and with approval, where required, by the city council. a. A copy of the written decision will be filed with the city clerk within ten (10) business days after final action is taken. (e) Other boards. The city clerk shall notify the stormwater authority of receipt of permit applications, and shall give copies of the application package to the relevant boards and departments. (f) Public hearings. The stormwater authority need not hold a public hearing for projects or activities outside their currently regulated jurisdiction. For example, projects or activities concurrently within the jurisdiction of the planning board, a public hearing shall be held in accordance with existing relevant ordinances and procedures as they relate to public hearings. If it is required that the stormwater agency hold a public hearing, they will do so through the procedures as set forth in the public hearings section of the City of Brockton rules and regulations of the planning board. (g) Public inclusion activities. All projects covered under this manual must allow a fourteen (14) day public review and comment period on any Stormwater Management Plan and Erosion and Sedimentation Control Plan. An applicant-paid notice will be placed in a local newspaper notifying the public about the review time period and where the review documents can be found. Abutters of any construction activity that requires compliance with this Manual will be notified by certified mail unless abutters have already been notified of the project under other city review processes. The mailings are to be paid for by the applicant with proof provided to the authority. The concerns raised from the public review period are to be considered during the stormwater authority review of the project. During construction activities, a sign with a "public concerns" phone number must be placed at the site to allow the public to voice concerns of construction activities to the stormwater authority. (h) Actions. The stormwater authority's action, rendered in writing, shall consist of either: (1) Approval of the Stormwater Management Permit Application based upon determination that the proposed plan meets the standards in Section 23-157 and will adequately protect the water resources of the community and is in compliance with the requirements set forth in this Manual; (2) Approval of the Land Disturbance Permit Application based upon determination that the proposed plan meets the standards in section 23-158 and will adequately protect the erosion and sedimentation controls of the community and is in compliance with the requirements set forth in this Manual; (3) Approval of the Stormwater Management Permit Application and the Land Disturbance Permit Application subject to any conditions, modifications or restrictions required by the stormwater authority which will ensure that the project meets the standards in sections 23-157—23-160 and adequately protects water resources, erosion and sedimentation controls, and municipal drainage connections as set forth in this Manual; (4) Disapproval of the Stormwater Management Permit Application and the Land Disturbance Permit Application based upon a determination that the proposed plans, as submitted, do not meet the standards in sections 23-157—23-160 to adequately protect water resources, erosion and sedimentation controls, and municipal drainage connections as set forth in this Manual. (5) The stormwater authority may disapprove applications "information deficient" where an applicant fails to provide requested additional information that in the stormwater authority's opinion is needed to adequately describe the proposed project. Information shall generally be limited to those applicable items listed in sections 23-157—23-160 of this Manual. (i) Lack of stormwater authority response. (1) Failure of the stormwater authority to take final action upon an application within eighty (80) calendar days of receipt of a complete application and complete review fees, shall be deemed to be approval of said application. Upon certification by the city clerk that the allowed time has passed without stormwater authority action, the stormwater authority must issue the permit unless more time has been granted based on the public hearing process mentioned in section 23-155(b). (j) Plan changes. The permittee, shall notify the stormwater authority in writing of any drainage change or alteration in the system authorized in a Stormwater Management Permit and a Land Disturbance Permit before any change or alteration is made. If the stormwater authority determines that the change or alteration is significant, based on the Stormwater Management Standards or Erosion and Sediment Control Standards in sections 23-157 and 23-158 and accepted construction practices, the stormwater authority may require that an amended application be filed. (k) Appeal of actions. A decision of the stormwater authority shall be final. Further relief of a decision by the stormwater authority made under this Manual shall be reviewable in the Superior Court in an action filed within sixty (60) days thereof, in accordance with M.G.L. Ch 249. § 4. An appeal of an action by a board, commission or department that has current regulatory authority for a project and/or activity shall be conducted under the applicable appeal provisions of said board, commission and/or department of the City of Brockton. Such an appeal shall result in a stay of the said written approval as described under section 23-155 of this Manual, until such time as the appeal process of the applicable board, commission and/or department has been resolved. (l) Project completion. At completion of the project the permittee shall submit as-built record drawings; as-built drawing of all structural stormwater controls and treatment best management practices required for the site as required in sections 23-157—23-159; the operation and maintenance manual(s). The as-built drawings and manuals shall show deviations from the approved plans, if any, and be certified by a registered professional engineer.
(Ord. No. K34, § 5.0, 12-22-19)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.