For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-163 — Construction inspections

Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-163

Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/1800edb9-6885-489e-93fe-c73ad143ac3b

Sec. 23-163. - Construction inspections.

(a) Notice of construction commencement. The applicant must notify the stormwater authority in advance before the commencement of construction. In addition, the applicant must notify the stormwater authority in advance of construction of critical components of the Stormwater Management Plan and Erosion and Sediment Control Plan. (b) At the discretion of the stormwater authority, periodic inspections of the stormwater management system and Erosion and Sedimentation Control system construction shall be conducted by the city officer or a professional engineer or their designee who has been approved by the stormwater authority. All inspections shall be documented and written reports prepared that contain the following information: (1) The date and location of the inspection; (2) Whether construction is being conducted in compliance with the approved stormwater management plan; (3) Variations from the approved construction specifications; and (4) Any other variations or violations of the conditions of the approved stormwater management plan and the erosion and sedimentation control plan. (c) The stormwater authority or its designee shall inspect the project site at the following stages, at a minimum: (1) Initial site inspection: Prior to approval of any plan; (2) Erosion control inspection: To ensure erosion control practices are in accord with the filed plan; a. Prior to starting clearing, excavation, construction, or land disturbing activity the applicant, the applicant's technical representative, the general contractor or any other person with authority to make changes to the project, shall meet with stormwater authority to review the permitted plans and their implementation plan and schedule. b. Board inspection. Stormwater authority or its designated agent shall make inspections as hereinafter required and shall either approve that portion of the work completed or shall notify the permittee wherein the work fails to comply with the land disturbance permit as approved. The Permit and associated plans for grading, stripping, excavating, and filling work, bearing the signature of approval of stormwater authority shall be maintained at the site during the progress of the work. In order to obtain inspections, the permittee shall notify stormwater authority at least two (2) working days before each of the following events: 1. Erosion and sediment control measures are in place and stabilized; 2. Site clearing has been substantially completed; 3. Rough Grading has been substantially completed; 4. Final Grading has been substantially completed; 5. Close of the construction season; and 6. Final landscaping (permanent stabilization) and project final completion. (3) Permittee inspections. The permittee or his/her agent shall conduct and document inspections of all control measures) no less than weekly or as specified in the permit, and prior to and following anticipated storm events. The purpose of such inspections will be to determine the overall effectiveness of the control plan, and the need for maintenance or additional control measures. The permittee or his/her agent shall submit monthly reports to stormwater authority or designated agent in a format approved by stormwater authority. (d) Stormwater management system inspection: An inspection will be made of the completed stormwater management system, prior to backfilling of any underground stormwater treatment, storage or stormwater conveyance system. (e) Final inspection. (1) After the permanent erosion and sedimentation control measures have been constructed, the stormwater management system is in place, and before the surety has been released, all applicants are required to submit actual "as built" plans and a softcopy of the operation and maintenance manual, for any stormwater management facilities or practices after final construction is completed and must be certified by a professional engineer. (2) The stormwater authority shall inspect the system to confirm its "as-built" features. This inspector shall also evaluate the effectiveness of the system in an actual storm. If the inspector finds the system to be adequate he shall so report to the stormwater authority which will issue a Certificate of Completion. As built plans shall be full size plans which reflect the "as built" conditions, including all final grades, developed by a land survey and/or professional engineer. All changes to project design should be recorded in red ink on plans to define changes made. All work deleted, corrections in elevations, and changes in materials, should be shown on the as built drawings. (f) Inadequacy of system. (1) If the system is found to be inadequate by virtue of physical evidence of operational failure, even though it was built as called for in the Stormwater Management Plan and the Erosion and Sedimentation Control Plan, it shall be corrected by the applicant before the Certificate of Completion is released. If the applicant fails to act the stormwater authority may use the surety bond to complete the work. (2) If the stormwater authority determines that there is a failure to comply with the plan, the property owner shall be notified in writing of the nature of the violation and the required corrective actions. A Stop Work Order shall be issued until any violations are corrected and all work previously completed has received approval by the stormwater authority.

(Ord. No. K34, § 5.0, 12-22-19)

Ask a question about Brockton law

Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.