§ 23-158 — Land disturbance permit
Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-158
Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/32b86a03-56e7-4a16-9cfb-c7dd06c1cd0a
Sec. 23-158. - Land disturbance permit
(a) General. A completed application for a Land Disturbance Permit shall be filed with stormwater authority. A permit must be obtained prior to the commencement of land disturbing activity that may result in the disturbance of an area of one-quarter acre or more or any other activity as described in section 23-134. (b) Filing application. (1) The applicant shall file with the stormwater authority, six (6) copies of a completed application package for a Land Disturbance Permit (LDP). The permit package can be delivered in person or by certified mail. Permit issuance is required prior to any site altering activity. While the applicant can be a representative, the permittee must be the owner of the site. The LDP Application package shall include: a. A completed application form with original signatures of all owners; b. A list of abutters, certified by the Assessor's Office; (abutters at their mailing addresses shown on the most recent applicable tax list of the assessors, including owners of land directly opposite on any public or private street or way, and abutters to the abutters within 300 feet of the property line of the applicant, including any in another municipality or across a body of water); c. Erosion and Sedimentation Control Plan and project description; d. Payment of the application and review fees; e. Surety bond. (2) In any instance where a disturbance that is covered under this Manual is performed but the disturbing agent does not file an application, the disturbing agent shall be deemed in violation of the requirements of this Manual. (c) Erosion and sediment control plan. (1) The Erosion and Sediment Control Plan shall contain sufficient information to describe the nature and purpose of the proposed development, pertinent conditions of the site and the adjacent areas, and proposed erosion and sedimentation controls. This plan shall be in accordance with the criteria established in this Manual and must be submitted with the stamp and signature of a competent professional engineer (PE) licensed in the Commonwealth of Massachusetts. The applicant shall submit such material as is necessary to show that the proposed development will comply with the design requirements listed below. (2) The performance principles of the Erosion and Sediment Control Plan are: a. Minimize total area of disturbance; b. Sequence activities to minimize simultaneous areas of disturbance; c. Minimize peak rate of runoff in accordance with the Massachusetts Stormwater Policy; d. Minimize soil erosion and control sedimentation during construction, provided that prevention of erosion is preferred over sedimentation control; e. Divert uncontaminated water around disturbed areas; f. Maximize groundwater recharge; g. Install and maintain all Erosion and Sediment Control measures in accordance with the manufacturers' specifications and good engineering practices; h. Prevent off-site transport of sediment; i. Protect and manage on and off-site material storage areas (overburden and stockpiles of dirt, borrow areas, or other areas used solely by the permitted project are considered a part of the project); j. Comply with applicable Federal, State and local laws and regulations including waste disposal, sanitary sewer or septic system regulations, and air quality requirements, including dust control; k. Prevent significant alteration of habitats mapped by the Massachusetts Natural Heritage & Endangered Species Program as Endangered, Threatened or Of Special Concern, Estimated Habitats of Rare Wildlife and Certified Vernal Pools, and Priority Habitats of Rare Species from the proposed activities; l. Institute interim and permanent stabilization measures, which shall be instituted on a disturbed area as soon as practicable but no more than fourteen (14) days after construction activity has temporarily or permanently ceased on that portion of the site; and m. Properly manage on-site construction and waste materials. (3) Erosion and Sedimentation Control Plan Content. The Plan shall contain the following information: a. Names, addresses, and telephone numbers of the owner, applicant, and person(s) or firm(s) preparing the plan; b. Title, date, north arrow, names of abutters, scale, legend, and locus map; c. Location and description of natural features including: 1. The location and names, if applicable, of any streams, wetlands, resource areas, water bodies, drainage swales, watercourses, including the 100-year flood elevation based upon the most recent Flood Insurance Rate Map, or as calculated by a professional engineer for areas not assessed on these maps, and areas subject to periodic flooding, both on and within one hundred (100) feet of the site on which the work is to be performed; 2. Existing vegetation including tree lines, canopy layer, shrub layer, and ground cover, and trees with a caliper twelve (12) inches or larger, noting specimen trees and forest communities; and 3. Habitats mapped by the Massachusetts Natural Heritage & Endangered Species Program as Endangered, Threatened or of Special Concern, Estimated Habitats of Rare Wildlife and Certified Vernal Pools, and Priority Habitats of Rare Species within five hundred (500) feet of any construction activity. d. Lines of existing abutting streets showing drainage and driveway locations and curb cuts; e. Existing soils, volume and nature of imported soil materials and the approximate total quantity of earthwork involved in the proposed work, with appropriate breakdown as to cut and fill; f. The location, extent, and type of all proposed work to be performed, including all existing and proposed buildings, structures, utilities, sewers, water mains, and storm drains on the site; g. Topographic mapping with elevations keyed to the City of Brockton base showing existing contours at intervals of not more than two (2) feet intervals of the finished grade of all disturbed land area(s) at the conclusion of the construction and/or land-disturbance activities; h. A description of the general topographic and soil conditions at the project site, including all significant limitations such as rock outcrops, existing alterations to natural drainage, and any other site characteristics pertinent to the work to be performed; i. Surveyed property lines showing distances and monument locations, all existing and proposed easements, rights-of-way, and other encumbrances, the size of the entire parcel, and the delineation and number of square feet of the land area to be disturbed; j. Drainage patterns and approximate slopes anticipated after major grading activities (Construction Phase Grading Plans); k. Location and details of erosion and sediment control measures with a narrative of the construction sequence/phasing of the project, including both operation and maintenance for structural and non-structural measures, interim grading, and material stockpiling areas; l. All drainage provisions shall be of such a design and capacity so as to adequately handle stormwater runoff, including runoff from tributary upstream areas which may be outside the locus of the project. m. Drainage facilities shall be installed as early as feasible during construction, prior to site clearance, if possible. n. Fill located adjacent to watercourses shall be suitable protected from erosion by means of rip rap, gabions, retaining walls, vegetative stabilization, or similar measures; o. Temporary vegetation and/or mulching shall be used to protect bare areas and stockpiles from erosion during construction; the smallest areas feasible shall be exposed at any one (1) time; disturbed areas shall be protected during the non-growing months, November through March; p. Permanent vegetation shall be placed immediately following fine grading; q. Trees and other existing vegetation shall be retained whenever feasible; the area beyond the drip line shall be fenced or roped off to protect trees from construction equipment; r. Areas damaged during construction shall be re-sodded, reseeded, or otherwise restored. Monitoring and maintenance schedules, where required, shall be predetermined; s. Location and details for the site entrance stabilization features; t. Location and details for storm drain inlet protection; u. A description of slope stabilization plans and procedures to limit the grade of slopes; v. Path and mechanism to divert uncontaminated water around disturbed areas, to the maximum extent practicable; w. Location and description of industrial discharges, including stormwater discharges from dedicated asphalt plants and dedicated concrete plants, which are covered by this permit; x. The location of all existing and proposed buildings or structures, utilities including drainage facilities, and all significant natural features within one hundred (100) feet of the proposed work to be performed; y. Stormwater runoff calculations in accordance with the Department of Environmental Protection's Stormwater Management Policy and this Manual; z. Location and description of and implementation schedule for temporary and permanent seeding, vegetative controls, and other stabilization measures; aa. A description of construction and waste materials expected to be stored and generated on-site. The Plan shall include a description of controls to reduce pollutants from these materials, including storage practices to minimize exposure of the materials to stormwater, spill prevention and response, and maintenance plan; bb. A description of the measures taken to store any on-site Deicing Chemicals; cc. A description of the procedures in place concerning on-site snow disposal; dd. A description of provisions for phasing the project where one (1) acre of area or greater is to be altered or disturbed; ee. Plans must be stamped and certified by a certified professional in erosion sediment control and/or a qualified professional engineer registered in Massachusetts; and ff. Such other information as is required by stormwater authority. (4) Access permission. To the extent permitted by state law, or if authorized by the owner or other party in control of the property, stormwater authority, its agents, officers, and employees may enter upon privately owned property for the purpose of performing their duties under this Manual and may make or cause to be made such examinations, surveys or sampling stormwater authority deems reasonably necessary to determine compliance with the permit.
(Ord. No. K34, § 5.0, 12-22-19)
Ask a question about Brockton law
Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
