For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-157 — Stormwater management permit

Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-157

Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/fdbc7003-5487-4789-81cc-c3135d3a745a

Sec. 23-157. - Stormwater management permit.

(a) General. A Stormwater Management Permit shall be obtained for all developments that fall under the applicability as defined in Section 4.0. The permit application shall be comprised of a Stormwater Management Plan and Operation and Maintenance manual. A completed application for a Stormwater Management Permit shall be filed with Stormwater Authority. The permit package can be delivered in person or by a certified mail. A permit must be obtained prior to the commencement of land disturbing activity that may result in the disturbance of an area or any other activity as described in section 23-154. (b) Filing application. (1) Permit Application (SMP): The applicant shall file with the stormwater authority, six (6) copies of a completed application package for a Stormwater Management Permit (SMP). Permit issuance is required prior to any site altering activity. While the applicant can be filled by a representative of the owner, the permittee must be the owner of the site. The SMP application package shall include: a. A completed application form with original signatures of all owners; b. A list of abutters, certified by the assessor's office; (abutters at their mailing addresses shown on the most recent applicable tax list of the assessors, including owners of land directly opposite on any public or private street or way, and to the abutters within three hundred (300) feet of the property line of the applicant, including any in another municipality or across a body of water); c. Stormwater Management Design Plan and project description; d. Operation and Maintenance Manual; e. Payment of the application and review fees; f. Inspection and Maintenance agreement; g. Design Analysis, input data, calculations and narrative report h. Surety bond. (2) Administrative Land Review (ALR): A completed application ALR form with original signatures of all owners; three (3) sets of copies of plan that include existing site features such as, structures, pavements, plantings, stormwater management systems, etc. The plan shall also show the proposed work including the proposed stormwater management system, limit of disturbance, erosion control, etc. (3) In any instance where a disturbance that is covered under this Manual is performed but the disturbing agent does not file an application, the disturbing agent shall be deemed in violation of the BSO and the requirements of this Manual. (c) Stormwater management plan. (1) The application for a stormwater management permit shall include the submittal of a Stormwater Management Plan to the stormwater authority. This Stormwater Management Plan shall contain sufficient information for the stormwater authority to evaluate the environmental impact, effectiveness, and acceptability of the measures proposed by the applicant for reducing adverse impacts from stormwater runoff. This plan shall be in accordance with the criteria established in this Manual and must be submitted with the stamp and signature of a professional engineer (PE) licensed in the Commonwealth of Massachusetts. (2) The Stormwater Management Plan shall fully describe the project in drawings, narrative, and calculations. It shall include: a. Contact Information. The name, address, and telephone number of all persons having a legal interest in the property and the tax reference number and parcel number of the property or properties affected; b. A locus map; c. The existing zoning, and land use at the site; d. The proposed land use; e. The location(s) of existing and proposed easements; f. The location of existing and proposed utilities; g. The site's existing and proposed topography with contours at a maximum of two (2) foot intervals, h. The existing site hydrology; i. A description and delineation of existing stormwater conveyances, impoundments, and wetlands on or adjacent to the site or into which stormwater flows; j. A delineation of 100-year flood plains, if applicable; k. Estimated seasonal high groundwater elevation in areas to be used for stormwater retention, detention, or infiltration; l. The existing and proposed vegetation and ground surfaces with runoff coefficients for each; m. A drainage area drawing showing pre and post construction watershed boundaries, drainage area and stormwater flow paths, including municipal drainage system flows; n. A description and drawings of all components of the proposed Stormwater management system including: 1. Any new BMP's including location, design and installation plans, vendor manufacturer, and maintenance requirements; 2. Any information requested by the stormwater authority regarding accepted existing BMP's; o. Plans with locations, cross sections, and profiles of all brooks, streams, drainage swales and their method of stabilization; p. Hydrologic and hydraulic design calculations for the pre-development and post-development conditions for the design storms specified in this Manual in sections 23-159(a), (b), (c). Such calculations shall include: 1. Description of the design storm frequency, intensity and duration; 2. Time of concentration; 3. Soil Runoff Curve Number (RCN) based on land use and soil hydrologic group; 4. Peak runoff rates and total runoff volumes for each watershed area; 5. Information on construction measures used to maintain the infiltration capacity of the soil where any kind of infiltration is proposed; 6. Infiltration rates, where applicable; 7. Culvert capacities; 8. Catch basin and other drainage inlet capacities. 9. Flow velocities; 10. Data on the increase in rate and volume of runoff for the specified design storms, and 11. Documentation of sources for all computation methods and field test results. q. Description of annual groundwater recharge methods to be utilized as mentioned in section 23-159(f) of this Manual; r. Post-development downstream analysis if deemed necessary by the stormwater authority; s. A detailed description of how the post-development stormwater management criteria in section 23-159 of this Manual are met; t. Soils information from test pits performed at the location of proposed stormwater management facilities, including but not limited to soil descriptions, depth to seasonal high groundwater, depth to bedrock, and percolation rates. Soils information will be based on site test pits logged by a Massachusetts Registered Soil Evaluator/Massachusetts Registered Professional Engineer; u. Landscaping plan describing the woody and herbaceous vegetative stabilization and management techniques to be used within and adjacent to the stormwater practice. v. Drawings and plans, not including the Locus Plan, shall be drawn to scale of either one (1) inch equal to forty (40) feet or one (1) inch equal to twenty (20) feet. (d) Operation and Maintenance Plan (MA DEP SMP Standard 9). An Operation and Maintenance plan (O&M Plan) is required at the time of application for all projects. The maintenance plan shall be designed to ensure compliance with the permit, this Manual and the Massachusetts Surface Water Quality Standards, 314, CMR 4.00 are met in all seasons and throughout the life of the system. The Operation and Maintenance Plan shall remain on file with the stormwater authority and shall be an ongoing requirement. The O&M Plan shall include: (1) The name(s) of the owner(s) for all components of the system; (2) A map showing the location of the systems and facilities including catch basins, manholes/access covers, main, and stormwater devices; (3) Maintenance agreements that specify: a. The names and addresses of the person(s) responsible for operation and maintenance; b. The person(s) responsible for financing maintenance and emergency repairs; c. An inspection and maintenance schedule for all stormwater management facilities including routine and non-routine maintenance tasks to be performed; d. A list of easements with the purpose and location of each; e. The signature(s) of the owner(s). (4) Stormwater management easement(s). a. Stormwater management easements shall be provided by the property owner(s) as necessary for: 1. Access for facility inspections and maintenance; 2. Preservation of stormwater runoff conveyance, infiltration, and detention areas and facilities, including flood routes for the 100-year storm event; 3. Direct maintenance access by heavy equipment to structures requiring regular maintenance. b. The purpose of each easement shall be specified in the maintenance agreement signed by the property owner. c. Stormwater management easements are required for all areas used for off-site stormwater control, unless a waiver is granted by the stormwater authority. d. Easements shall be recorded with the Plymouth County Registry of Deeds, by the site owner, prior to issuance of a Certificate of Completion by the stormwater authority. (5) Changes to Operation and Maintenance Plans. a. The owner(s) of the stormwater management system must notify the stormwater authority of changes in ownership or assignment of financial responsibility. b. The maintenance schedule in the Maintenance Agreement may be amended to achieve the purposes of this Manual by mutual agreement of the stormwater authority and the responsible parties. Amendments must be in writing and signed by all responsible parties. Responsible parties shall include owner(s), persons with financial responsibility, and persons with operational responsibility. c. The stormwater authority retains the authority of inspection and enforcement of the Operation and Maintenance Plan as described in sections 23-165 and 23-166.

(Ord. No. K34, § 5.0, 12-22-19)

Ask a question about Brockton law

Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.