For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-159 — Post-development stormwater management criteria

Code of Ordinances of the City of Brockton, Massachusetts (Codified through Ordinance No. 07-31-2025(2), approved July 31, 2025 (Supp. No. 28)) · Brockton Code of Ordinances § 23-159

Corpus is an independent public-information project, not the official City of Brockton website. Stable reference: corpuslaw.us/code/11bc0aec-f22a-4d0c-8ebc-b41bd7c739a6

Sec. 23-159. - Post-development stormwater management criteria.

(a) General. At a minimum all projects shall comply with the performance standards of the most recent version of Massachusetts Department of Environmental Protection (DEP) Stormwater Management Policy. In addition, the following general performance criteria shall be included in all Stormwater Management Plans, unless otherwise provided for in this Manual. (b) No untreated discharges. All stormwater runoff generated from land development and land use conversion activities shall not discharge untreated stormwater runoff directly to a wetland, local water body, municipal drainage system, or abutting property, without adequate treatment. (c) Channel Protection (MA DEP SMP Standard 2). Protection of channels from bank and bed erosion and degradation shall be provided by controlling the peak discharge rate from the two-year storm event to the pre-development rate. (d) Overbank Flooding Protection (MA DEP SMP Standard 2). Downstream overbank flood and property protection shall be provided by attenuating the post-development peak discharge rate to the pre-development rate for the 10-year, 24-hour return frequency storm. (e) Extreme Flooding Protection (MA DEP SMP Standard 2). Extreme flooding and public safety protection shall be provided by evaluating the 100-year, 24-hour return frequency storm event to demonstrate no increased flooding impacts off-site. (f) Recharge (MA DEP SMP Standard 3). 1. Annual groundwater recharge rates shall be maintained, by promoting infiltration through the use of structural and non-structural methods. At a minimum, annual recharge from the post development site shall mimic the annual recharge from predevelopment site conditions. 2. The stormwater runoff volume to be recharged to groundwater should be determined using the methods prescribed in the latest version of the Massachusetts DEP Stormwater Management Manual. The recharge requirements shall apply to all activities within the jurisdiction of this Manual except as noted, and unless specifically waived by stormwater authority. The recharge criterion is not required for any portion of a site designated as a stormwater hotspot (see sections 23-134(b)(10) and 23-159(k) of this Manual). In addition, the stormwater authority may relax or eliminate the recharge requirement at its discretion, if the site is situated on unsuitable soils or is in a redevelopment area with documentation of prior contaminated soils. 3. For recharger using infiltrators, to prolong the useful life of the buried infiltrator system, eighty percent (80%) TSS removal is required, prior to introduction to the infiltrator recharge system. (g) Structural Practices for Water Quality (MA DEP SMP Standard 4). (1) Presumed compliance with Massachusetts Water Quality Standards All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the most recent version of the Massachusetts DEP Stormwater Management Manual. For other structural stormwater controls not included in the Massachusetts Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the stormwater authority before being included in the design of a stormwater management system. Structural best management practices (BMPs) must be designed to remove eighty (80%) of the average annual post development total suspended solids (TSS). It is presumed that a BMP complies with this performance goal if it is: a. Sized to capture the prescribed water quality volume; b. Designed according to the specific performance criteria outlined in the Massachusetts Stormwater Management Manual or an approved local equivalent; c. Constructed properly; and d. Maintained regularly. (h) Water quality volume. The prescribed water quality volume required in the sizing of a structural stormwater practice shall be 0.50 inches x the total impervious area of the drainage area and 1.0 inches x the total impervious area of the drainage area in critical areas. (i) Hydrologic basis for design of structural practices. For facility sizing criteria, the basis for hydrologic and hydraulic evaluation of development sites are as follows: (1) Impervious cover is measured from the site plan and includes any material or structure on or above the ground that prevents water from infiltrating through the underlying soil. Impervious surface is defined to include, without limitation: paved parking lots, sidewalks, roof tops, driveways, patios, and paved, gravel and compacted dirt surfaced roads. (2) Off-site areas shall be assessed based on their "pre-developed condition" for computing the water quality volume (i.e., treatment of only on-site areas is required). However, if an offsite area drains to a proposed BMP, flow from that area must be accounted for in the sizing of a specific practice. (3) Off-site areas draining to a proposed facility should be modeled as "present condition" for peak-flow attenuation requirements. (4) The length of sheet flow used in time of concentration calculations is limited to no more than fifty (50) feet for predevelopment conditions and fifty (50) feet for post development conditions. a. Detention time for the one-year storm is defined as the center of mass of the inflow hydrograph and the center of mass of the outflow hydrograph. b. The models TR-55 and TR-20 (or approved equivalent) will be used for determining peak discharge rates. c. The standard for characterizing pre-development land use for on-site areas shall be woods. d. For purposes of computing runoff, all pervious lands in the site shall be assumed prior to development to be in good condition regardless of conditions existing at the time of computation. e. If an off-site area drains to a facility, off-site areas should be modeled, assuming an "ultimate buildout condition" upstream. f. Determination of flooding and channel erosion impacts to receiving streams due to land development projects shall be measured at each point of discharge from the development project and such determination shall include any runoff from the balance of the watershed which also contributes to that point of discharge. g. The specified design storms shall be defined as a 24-hour storm using the rainfall distribution recommended by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) or the Northeast Regional Climate Center "Atlas of Precipitation Extremes for the Northeastern United State and Southeastern Canada." h. Proposed residential, commercial, or industrial subdivisions shall apply these stormwater management criteria to the land development as a whole. Individual lots in new subdivisions shall not be considered separate land development projects, but rather the entire subdivision shall be considered a single land development project. Hydrologic parameters shall reflect the ultimate land development and shall be used in all engineering calculations. (j) Sensitive areas. Stormwater discharges to critical areas with sensitive resources (i.e., shellfish beds, swimming beaches, aquifer recharge areas, water supply reservoirs) may be subject to additional criteria, or may need to utilize or restrict certain stormwater management practices at the discretion of the stormwater authority. The stormwater authority may designate sensitive areas and specific criteria for these areas after conducting a public hearing in accordance with the provisions of sections 23-154(b) and 23-156 of the City of Brockton Stormwater Management Manual. (k) Hotspots. Stormwater discharges from land uses or activities with higher potential pollutant loadings, known as "hotspots", as defined in the most recent version of the MA DEP Stormwater Management Manual require the use of specific stormwater management BMPs as specified in the most recent version of the MA DEP Stormwater Management Manual. The use of infiltration practices without pretreatment is prohibited.

(Ord. No. K34, § 5.0, 12-22-19)

Ask a question about Brockton law

Corpus searches the Brockton sections it holds and shows the ones that match, with their citations. Free, no sign-in.