Sec. 8-21. - Waivers.

The city manager or designee may grant waivers to the strict compliance of this chapter based upon the following considerations: (1) Except as provided in subsection (2) below, stormwater management quantitative control waivers shall be granted by the city manager or designee, only to those projects within areas where watershed management plans have been developed consistent with subsection (6) below. Written requests for quantitative stormwater management waivers shall be submitted that contain sufficient descriptions, drawings, and any other information that is necessary to demonstrate that ESD has been implemented to the MEP. A separate written waiver request shall be required in accordance with the provisions of this section if there are subsequent additions, extensions, or modifications to a development receiving a waiver. (2) If watershed management plans consistent with subsection (6) below have not been developed, then stormwater management quantitative control waivers may be granted to projects provided that it has been demonstrated that ESD has been implemented to the MEP: (i) That are in-fill development located in a state-designated priority funding area where the economic feasibility of the project is tied to the planned density, and where implementation of stormwater management quantitative controls would result in a loss of the planned development density provided that: a. Public water and sewer and stormwater conveyance exist; b. The quantitative waiver is applied to the project for the impervious cover that previously existed on the site only; c. ESD to the MEP is used to meet the full water quality treatment requirements for the entire development; and d. ESD to the MEP is used to provide full quantity control for all new impervious surfaces; or (ii) When the approving agency determines that circumstances exist that prevent the reasonable implementation of quantity control practices. (3) Stormwater management qualitative control waivers apply only to: (i) In-fill development projects where ESD has been implemented to the MEP and it has been demonstrated that other BMPs are not feasible; (ii) Redevelopment projects if the requirements of section 8-22 of this chapter are satisfied; or (iii) Sites where the city determines that circumstances exist that prevent the reasonable implementation of ESD to the MEP. (4) Waivers shall only be granted when it has been demonstrated that ESD has been implemented to the MEP and must: (i) Be on a case-by-case basis; (ii) Consider the cumulative effects of the city's waiver policy; and (iii) Reasonably ensure the development will not adversely impact stream quality. (5) If the city has established an overall watershed management plan for a specific watershed, then the city may develop quantitative waiver and redevelopment provisions that differ from subsection (2) above and section 8-22. (6) A watershed management plan developed for the purpose of implementing different stormwater management policies for waivers and redevelopment shall: (i) Include detailed hydrologic and hydraulic analyses to determine hydrograph timing; (ii) Evaluate both quantity and quality management and opportunities for ESD implementation; (iii) Include cumulative impact assessment of current and proposed watershed development; (iv) Identify existing flooding and receiving stream channel conditions; (v) Be conducted at a reasonable scale; (vi) Specify types and location of on-site or off-site quantitative and qualitative stormwater management practices are to be implemented; (vii) Be consistent with the general performance standards for stormwater management in Maryland found in the Maryland Stormwater Design Manual; (viii) Be consistent with EPA's Nine-Element Watershed Management Plan Guidelines; and (ix) Be approved by the administration. (7) The city manager or designee may grant a waiver of quantitative stormwater management requirements for individual developments in areas where watershed management plans have been developed provided that a written request is submitted by the applicant containing descriptions, drawings, and any other information that is necessary to evaluate the proposed development. A separate written waiver request shall be required in accordance with the provisions of this section if there are subsequent additions, extensions, or modifications to a development receiving a waiver. (8) When an applicant obtains a waiver of the required on-site stormwater management from the city, the applicant's contribution can take one of the following forms, the choice of which shall be in the discretion of the city manager or designee: (i) Monetary contribution. The monetary contribution shall be based on the fee schedule as established by the mayor and city council. The fee schedule shall be based on the volume of stormwater runoff requiring treatment after any and all other on-site treatment practices have been implemented and may be revised from time to time by resolution of the mayor and city council. The monetary contribution shall not exceed the total cost of the on-site stormwater management. Monetary contributions may be used by the city for land acquisition, including easements and rights-of-way, and the design, purchase, construction, expansion, repair, maintenance, stream restoration and inspection of stormwater management facilities, either existing or contained in an approved capital improvements program of the city or county. Any such contribution shall be credited by the city to the appropriate stormwater management capital improvement project. (ii) Dedication and conveyance of land. Instead of making a monetary contribution, the applicant, upon receiving a waiver from the city, may enter into an agreement with the city for the granting of an easement or the conveyance or dedication of land by the applicant to be used for the construction of an off-site stormwater management facility. The agreement shall be entered into prior to the issuance of the building permit. (iii) The applicant's contribution provided in subsections (i) and (ii) above shall occur prior to the issuance of any site or building permit.

(Ord. No. O-03-25, 4-21-25)