Sec. 8-22. - Redevelopment.

(a) Stormwater management plans are required by the city for all redevelopment, unless otherwise specified by watershed management plans developed according to subsection 8-21(7) of this article. Stormwater management measures must be consistent with the Maryland Stormwater Design Manual. (b) All redevelopment designs shall: (1) Reduce impervious area within the limit of disturbance (LOD) by at least fifty (50) percent according to the Maryland Stormwater Design Manual; or (2) Implement ESD to the MEP to provide water quality treatment for at least fifty (50) percent of the existing impervious area within the LOD; or (3) Use a combination of subsections (1) and (2) above for at least fifty (50) percent of the existing site impervious area. (c) Alternative stormwater management measures may be used to meet the requirements in subsection (b) above only if the owner/developer satisfactorily demonstrates to the city that impervious area reduction has been maximized and ESD has been implemented to the MEP. Alternatives may be utilized in lieu of on-site stormwater management measures and may include any measures or actions the city deems appropriate to meet the intent of this chapter and the regulations. Alternative stormwater management measures include, but are not limited to: (1) An on-site structural BMP; (2) An off-site structural BMP to provide water quality treatment for an area equal to or greater than fifty (50) percent of the existing impervious area; or (3) A combination of impervious area reduction, ESD implementation, and an on-site or off-site structural BMP for an area equal to or greater than fifty (50) percent of the existing site impervious area within the LOD. (d) Redevelopment sites where such constraints as existing utilities, soils, site topography, depth to groundwater, and existing storm drain elevations restrict the effective implementation of onsite ESD or other stormwater practices required by subsections (b) and (c) above may utilize, and are not limited to the following practices. The owner/developer shall satisfactorily demonstrate to the city that the requirements of subsections (b) and (c) above cannot be met. This shall be established at the time of stormwater management preliminary plan of the proposed development: (1) A combination of ESD and an on-site or off-site structural BMP; (2) Retrofitting including existing BMP upgrades, filtering practices, and off-site ESD implementation; (3) Participation in a stream restoration; (4) Pollution trading with another entity; (5) Design criteria based on watershed management plans developed according to subsection 8-21(7) of this chapter; (6) Fees or contributions paid in accordance with subsection 8-21(9)(i); or (7) A partial waiver of the treatment requirements if ESD is not practicable. (e) The determination of what alternatives will be available may be made by the city at the appropriate point in the development review process. The city shall consider the prioritization of alternatives in subsection (d) above after it has been determined that it is not practicable to meet the regulatory requirements using ESD to the MEP. In deciding what alternatives may be required, the city may consider factors including, but not limited to: (1) Whether the project is in an area targeted for development incentives such as priority funding area, a designated transit-oriented development area, or a designated base realignment and closure revitalization and incentive zone; (2) Whether the project is necessary to accommodate growth consistent with comprehensive plans; or (3) Whether bonding and financing have already been secured based on an approved development plan. (f) Neither the cost of providing on-site stormwater management nor the loss of development density resulting from on-site stormwater management is sufficient justification for a request to be governed under this section. (g) Use of alternatives will not relieve the applicant of the responsibility of providing safe conveyance of runoff and protection of other properties or city waterways as required under this chapter. (h) Stormwater management shall be addressed according to the new development requirements in the Maryland Stormwater Design Manual for any net increase in impervious area.

(Ord. No. O-03-25, 4-21-25)