§ 8-29 — Inspections

Code of the City of Gaithersburg, Maryland (Codified through Ordinance No. O-08-26, adopted September 8, 2026. (Supp. No. 52)) · Gaithersburg City Code § 8-29

Corpus is an independent public-information project, not the official City of Gaithersburg website. Stable reference: corpuslaw.us/code/3a3b4e89-cae5-45f4-9457-20246092ca85

Sec. 8-29. - Inspections.

(a) Inspection schedule and reports. (1) Prior to approval of a stormwater management plan, the developer will submit to the city a proposed inspection and construction control schedule. (2) The developer shall notify the city at least forty-eight (48) hours before commencing any work in conjunction with the approved stormwater management plan and upon completion of the project when a final inspection will be conducted. (3) Written inspection reports shall be made of the periodic inspections necessary during construction of stormwater management systems to ensure compliance with the approved plans. As a condition to any approval of said plan, the city has the right of entry on the property to inspect compliance with this article. (4) Regular inspections shall be made and documented for each ESD planning technique and practice at the stages of construction specified in the Maryland Stormwater Design Manual by the city, its authorized representative, or certified by a professional engineer licensed in the state. At a minimum, all ESD and other nonstructural practices shall be inspected according to the inspection schedule shown on the approved stormwater management final plan and upon completion of final grading, the establishment of permanent stabilization, and before issuance of use and occupancy approval. (5) Written inspection reports shall include: (i) The date, time, location of the inspection and weather conditions; (iv) Whether construction was in compliance with the approved stormwater management plan; (iii) Any variations from the approved construction specifications; and (iv) Any violations that exist. (6) The owner/developer and on-site personnel shall be notified in writing when violations are observed. Written notification shall describe the nature of the violation and the required corrective action. The developer will promptly correct any portion of the work that does not comply, after written notice from the city. The notice shall set forth the nature of corrections required and the time within which corrections will be made. (7) No work shall proceed until the city inspects and approves the work previously completed and furnishes the developer with the results of the inspection reports as soon as possible after completion of each required inspection. (b) Inspection requirements during construction. After commencing initial site operations, regular inspections as specified in the Maryland Stormwater Design Manual shall be made, at a minimum, at the following specified stages of construction. In the event, a more stringent subsequent inspection form is created, the more stringent form governs: (1) For ponds subject to USDA-NRCS-MD CODE. 378 regarding Dam safety: (i) Upon completion of excavation to sub-foundation and when required, installation of structural supports or reinforcement for structures, including but not limited to: a. Core trenches for structural embankments; b. Inlet and outlet structures, anti-seep collars or diaphragms, and watertight connectors on pipes; and c. Trenches for enclosed storm drainage facilities. (ii) During placement of structural fill, concrete, and installation of piping and catch basins; (iii) During backfill of foundations and trenches; (iv) During embankment construction; and (v) Upon completion of final grading and establishment of permanent stabilization. (2) Wetlands: At the stages specified for pond construction in subsection (1) above, during and after wetland reservoir area planting, and during the second growing season to verify a vegetation survival rate of at least fifty (50) percent. (3) For infiltration trenches: (i) During excavation to subgrade; (ii) During placement and backfill of underdrain systems and observation wells; (iii) During placement of geotextiles and all filter media; (iv) During construction of appurtenant conveyance systems such as diversion structures, pre-filters and filters, inlets, outlets, and flow distribution structures; and (v) Upon completion of final grading and establishment of permanent stabilization. (4) For infiltration basins: At the stages specified for pond construction in subsection (1) above and during placement and backfill of underdrain systems. (5) For filtering systems: (i) During excavation to subgrade; (ii) During placement and backfill of underdrain systems; (iii) During placement of geotextiles and all filter media; (iv) During construction of appurtenant conveyance systems such as flow diversion structures, pre-filters and filters, inlets, outlets, orifices, and flow distribution structures; and (v) Upon completion of final grading and establishment of permanent stabilization. (6) For open channel systems: (i) During excavation to subgrade; (ii) During placement and backfill of underdrain systems for dry swales; (iii) During installation of diaphragms, check dams, or weirs; and (iv) Upon completion of final grading and establishment of permanent stabilization. (7) For ESD and nonstructural practices, inspection shall be completed in accordance with the Maryland Stormwater Design Manual. (8) Construction phase photograph. (c) Final inspection reports. A final inspection shall be conducted by the city upon completion of the stormwater management system to determine if the completed work is constructed in accordance with the approved plan and this article. If, after an inspection by the city, the condition of a stormwater management facility presents an immediate danger to the public health or safety, because of an unsafe condition or improper maintenance, the city shall take action as may be necessary to protect the public and make the facility safe. Any cost incurred by the city shall be assessed against the owner(s), as provided in subsection 8-30(b)(3). (d) The city may, for enforcement purposes, use any one or a combination of the following actions: (1) A notice of violation and or a municipal infraction citation shall be issued specifying the need for a violation to be corrected if stormwater management plan noncompliance is identified; (2) A stop-work order shall be issued for the site by the city if a violation persists; (3) Bonds, securities, and/or project permits may be withheld, or the case may be referred for legal action if reasonable efforts to correct the violation have not been undertaken. (e) Any step in the enforcement process may be taken at any time, depending on the severity of the violation. (f) Once construction is complete, an as-built drawing certification request shall be submitted by either a professional engineer or professional land surveyor licensed in the state to ensure that ESD planning techniques, treatment practices, and structural stormwater management practices and conveyance systems comply with the specifications contained in the approved plans. At a minimum, an as-built certification request shall include the following: (1) A set of redlined, certified as-built drawings comparing the approved stormwater management plan with what was constructed including but not limited to dimensions, elevations, locations, materials, and plantings. The as-built drawings shall be signed and sealed by a professional engineer or professional land surveyor registered in the State of Maryland. When approved plans include landscaping specific to stormwater management said plan shall also be signed and sealed by a professional landscape architect registered in the state. Certified as-built drawings shall be submitted as electronic files, in accordance with the city's digital submittal guidelines. (2) Copies of material certifications for materials used in the construction of any stormwater facility verifying fundamental properties of the materials. (3) Receipts, delivery tickets, or other record confirmation that certified materials were used at the project location. (4) A list of plant species or label from plant material installed on sites. (5) A recommended maintenance plan and schedule for the system. (6) Third party inspection reports of construction activity. (7) As-built stormwater report comparing as-built conditions to design computations signed and sealed by a professional engineer or professional land surveyor registered in the state. (g) The city shall submit notice of construction to the administration on a form supplied by the administration for each structural stormwater management practice within forty-five (45) days of construction completion. The type, number, total drainage area, and total impervious area treated by all ESD techniques and practices shall be reported to the administration on a site-by-site basis. The city shall submit a notice of construction completion for any BMPs approved by either the district or MDE to the respective agency. (h) If the stormwater management system is to be owned and/or maintained by the city, ownership and responsibility for maintenance shall not convey until formal acceptance of the work by the city manager. (i) All inspections mentioned in section 8-29 must be performed by a city certified inspector in erosion and sediment control. A city certified inspector must meet the training requirements by successfully completing the responsible personnel certification in erosion and sediment control pursuant to Environmental Article Section 4-104 from the State of Maryland.

(Ord. No. O-03-25, 4-21-25)