§ 8-25 — Stormwater management plans

Code of the City of Gaithersburg, Maryland (Codified through Ordinance No. O-08-26, adopted September 8, 2026. (Supp. No. 52)) · Gaithersburg City Code § 8-25

Corpus is an independent public-information project, not the official City of Gaithersburg website. Stable reference: corpuslaw.us/code/6283d3b9-38bf-4148-9fee-23dfe93bf751

Sec. 8-25. - Stormwater management plans.

(a) Review and approval of stormwater management plans. (1) For any proposed development, the owner/developer shall submit phased stormwater management plans and the city stormwater checklist, or an application for a waiver to the city for review and approval, unless otherwise exempted. At a minimum, plans shall be submitted for the stormwater management concept, stormwater management preliminary, and stormwater management final plan/construction phases of project design. Each plan submittal shall include the minimum content specified in subsection (b) below and meet the requirements of the Maryland Stormwater Design Manual and section 8-24 of this chapter. (2) The city shall perform a comprehensive review of the stormwater management plans for each phase of site design. Coordinated comments will be provided for each plan phase that reflect input from all appropriate agencies including, but not limited to the district, the planning and code administration, and the department of public works and its environmental services division. All comments from the city and other appropriate agencies shall be addressed and approval received at each phase of project design before subsequent submissions. (3) Notification of approval or reasons for the disapproval or modification shall be given to the applicant within thirty (30) days; subsequent submissions shall be reviewed within fourteen (14) days, after submission of the completed stormwater plan along with acknowledgement in the checklist of applicability, or incompleteness. If a decision is not made within thirty (30) days, the applicant shall be informed of the status of the review process and the anticipated completion date. Each phase of the stormwater management plan shall not be considered approved without the inclusion of the signature and date of signature of the city on the plan. (4) If a stormwater management plan involves direction of some or all runoff off from the site to an adjacent property, it is the responsibility of the developer to notify and obtain from adjacent property owners any easements or necessary property interests concerning flowage of water. Approval of a stormwater management plan does not create or affect any right to direct runoff onto adjacent property without that property owner's permission. (b) Contents of the stormwater management plan. The developer is responsible for submitting a phased stormwater management plan, which meets the design requirements provided by this chapter. The plan shall be accompanied by a report that includes sufficient information to evaluate the environmental characteristics of the affected areas, the potential impacts of the proposed development on water resources, and the effectiveness and acceptability of measures proposed for managing stormwater runoff. The developer or builder shall certify on the drawings that all clearing, grading, drainage, construction and development shall be conducted in strict accordance with the plan. (1) Stormwater management concept plan. The owner/developer shall submit a stormwater management concept plan that provides sufficient information for an initial assessment of the proposed project and whether stormwater management can be provided according to subsection 8-24(b) of this article and the Maryland Stormwater Design Manual. Plans submitted for concept approval shall include, but are not limited to: (i) A brief narrative description of the overall development project; (ii) Descriptions of all water courses, impoundments, and wetlands, floodplains and forests, on or adjacent to the site or into which stormwater directly flows; (iii) A natural resources inventory/forest stand delineation (NRI/FSD) map at a scale specified by the city showing site location, existing natural and man-made features, perennial and intermittent streams, floodplains, twenty-five-foot floodplain building restriction line (BRL), required flood protection elevation, wetlands, wetland buffers, stream buffers, other sensitive resources, forest and specimen trees, topography, natural drainage patterns, drainage areas, existing storm drain system, slopes, soil type, soil erodibility, and soil permeability (per Montgomery County Soil Survey), above ground and underground utilities, and other information required by the approving agency; (iv) The anticipated location of proposed impervious areas, buildings, roadways, parking, sidewalks, utilities, and other site improvements; (v) Anticipated development details and site data including site areas, existing impervious area, proposed disturbed area, proposed new impervious area, and proposed total site impervious area; (vi) The anticipated location of the proposed limits of disturbance and clearing in relation to the topography, erodible soils, steep slopes, forest conservation areas, stream valley buffers, and other areas to be protected during construction; (vii) Preliminary estimates of stormwater management requirements, the selection and location of ESD practices to be used, stormwater volume computations for ESD practices, and the delineated drainage areas and the locations of all points of discharge from the site; (viii) A narrative that supports the concept design and describes how ESD will be implemented to the MEP; (ix) A vicinity map; (x) Geotechnical investigations including soil maps, borings, site specific recommendations, infiltration rates and any additional information necessary for the concept stormwater management design; and (xi) Any other information required by the Maryland Stormwater Design Manual or the city. (1A) A stormwater management sketch plan. The applicant shall submit in place of a concept plan above, for DPW review and approval, a stormwater management sketch plan in conjunction with a development sketch plan submission, in accordance with section 24-12.4(D) of this Code, in the MXD Zone only, that provides sufficient information for an initial assessment of the proposed project and the strategies to be used to fulfill stormwater management requirements under chapter 8 and reflected in subsequent concept and preliminary stormwater management plans submitted with a schematic development plan. Stormwater management sketch plan shall include, but not be limited to: (i) A brief narrative description of the overall development project and what strategies/facilities are envisioned to fulfill the requirements of chapter 8 and incorporate in the project environmental site design to the maximum extent practicable. (ii) A description of all water courses, impoundments, and wetlands on or adjacent to the site or into which stormwater directly flows. (iii) An approved natural resources inventory/forest stand delineation including topography at two-foot intervals and natural drainage patterns. (iv) A graphic locational and narrative description of existing drainage areas, existing storm drain systems, known locations of all existing points of discharge from the site, and any existing stormwater management facilities with their functions. (v) A statement acknowledging that subsequent plan submissions will provide sufficient information demonstrating that stormwater management can be provided according to chapter 8 of this Code. (vi) Any other information required by the city. (2) Stormwater management preliminary plan. Following concept plan approval or sketch plan approval by the city, the owner/developer shall submit a stormwater management preliminary plan that reflects comments received during the previous review phase. Plans submitted for preliminary stormwater management approval shall be of sufficient detail to allow site development to be reviewed and include but not be limited to: (i) All information provided during the concept plan review phase and comments received by review agencies; (ii) Final site layout, exact impervious area locations and acreages, proposed topography, proposed easements, delineated drainage areas at all points of discharge from the site, stormwater volume computations for ESD practices and quantity control structures, the location, type, and size of ESD practices used to the MEP and all nonstructural, alternative surfaces, and micro-scale practices used, proposed hydrology analysis for runoff rates, storage volumes, and discharge velocities, stormwater details and specifications, discharge calculations demonstrating stable conveyance of runoff from the site, and maintenance access for each ESD and structural practice; (iii) When applicable, a dam hazard classification statement from the administration. (iv) An erosion and sediment control plan that depicts the limits of disturbance and clearing, the locations and sizes of preservation areas (for protection of forest and sensitive areas as well as to support future infiltration and recharge areas), stabilization strategies, and the phasing and construction sequence for each stage of development that is necessary to limit earth disturbances and impacts to natural resources; (v) An overlay plan depicting the types and locations of ESD and erosion and sediment controls; (vi) Drainage area maps depicting predevelopment and post development runoff flow path segmentation and land use; (vii) Hydrologic computations in accordance with the Maryland Stormwater Design Manual of the applicable ESD and unified sizing criteria according to the Maryland Stormwater Design Manual for all points of discharge from the site; (viii) Hydraulic and structural computations for all ESD practices and structural stormwater management practices to be used; (ix) Existing and proposed topography and proposed drainage areas, including areas necessary to determine downstream analysis for proposed stormwater management facilities; (x) Analysis of stable conveyance to downstream discharge points in accordance with county drainage design standards; (xi) Representative cross sections and details including the existing and proposed structure elevations and water surface elevations; (xii) A narrative that supports the site development design, describes how ESD will be used to meet the minimum control requirements, and justifies any proposed structural stormwater management practices; (xiii) Letter(s) of acknowledgement from off-site property owner(s) for any required off-site covenants, easements, and/or rights-of-way; (xiv) Public safety features including safety benches, as specified in the Maryland Stormwater Design Manual or the stormwater standards, for new stormwater management ponds or those retrofitted after July 1, 2020; and (xv) Any other information required by the Maryland Stormwater Design Manual or approving agency. (3) Stormwater management final plan/construction drawings. Following preliminary stormwater management plan approval by the city, the owner/developer shall submit final erosion and sediment control and final stormwater management plans/construction drawings that reflect the comments received during the previous review phase. Plans submitted for final approval shall be of sufficient detail to allow all approvals and permits to be issued according to the following: (i) All information required during the preliminary stormwater management plan review phase, updated to reflect any changes to the site plan, and comments received by review agencies; (ii) Final erosion and sediment control plans shall be submitted according to COMAR 26.17.01 and article I of this chapter; (iii) A narrative that supports the final stormwater management design; and (iv) Any other information required by the Maryland Stormwater Design Manual or approving agency; (v) A vicinity map; (vi) Existing and proposed topography and proposed drainage areas, including areas necessary to determine downstream analysis for proposed stormwater management facilities; (vii) Any proposed improvements including location of buildings or other structures, impervious surfaces, storm drainage facilities, preservation areas, and all grading; (viii) The location of existing and proposed structures and utilities; (ix) Any covenants, easements and rights-of-way onsite or offsite; (x) The delineation, if applicable, of the floodplain, twenty-five-foot floodplain BRL, flood protection elevation, wetlands, wetland buffers, perennial and intermittent streams, and stream valley buffers; (xi) Structural and construction details including representative cross sections for all components of the proposed drainage system or systems, and stormwater management facilities; (xii) All necessary construction specifications; (xiii) Data for total site area, disturbed area, new impervious area, and total impervious area; (xiv) A table showing the ESD, and unified sizing criteria volumes required in the Maryland Stormwater Design Manual; (xv) A planting plan showing stormwater management facility planting layout and details; (xvi) A table of materials to be used for stormwater management facility planting; (xvii) All soil boring logs and locations; (xviii) A construction inspection checklist; (xix) A post construction inspection and maintenance schedule; (xx) A stormwater management infrastructure overview plan that includes the locations of inlets, storm drains, outfalls, manholes, headwalls, easements, all ESD and structural BMPS (identified by type and a unique identification (ID) number), drainage area per structure, and a full list of structure IDs and types; (xxi) Certification by the owner/developer that all stormwater management construction and maintenance will be done according to this plan; (xxii) Professional certification, seal and signature; (xxiii) An as-built certification signature block to be executed after project completion; (xxiv) A blank space for the city approval block; (xxv) Scanned and digital versions of the final plan, in accordance with the city's digital submittal guidelines; (xxvi) Any other information required by the stormwater standards or approving agency. (xxvii) Any other information required by the city. (c) Preparation of the stormwater management plan. (1) The design of stormwater management plans shall be prepared by any individual whose qualifications are acceptable to the city. The city may require that the design be prepared by either a professional engineer, professional land surveyor, or landscape architect licensed in the state, as necessary to protect the public or the environment. (2) If a stormwater BMP requires either a dam safety permit from the administration or small pond approval from the district, the city shall require that the design be prepared by a professional engineer licensed in the state. (d) Approved plans remain valid for three (3) years from the date of approval unless extended or renewed by the city. Approved plans shall expire on the same date of the expiration of the associated final site plan or amendment to final site plan. A new approval stamp, signature, and date from the director of public works or designee will be required for any extended or renewed plan.

(Ord. No. O-03-25, 4-21-25)