For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-24 — Stormwater management criteria

Code of the City of Gaithersburg, Maryland (Codified through Ordinance No. O-08-26, adopted September 8, 2026. (Supp. No. 52)) · Gaithersburg City Code § 8-24

Corpus is an independent public-information project, not the official City of Gaithersburg website. Stable reference: corpuslaw.us/code/ceb795f6-dda0-47d0-8ed6-1b6661de8e84

Sec. 8-24. - Stormwater management criteria.

(a) Minimum control requirements. (1) The minimum control requirements established in this section and the Maryland Stormwater Design Manual are as follows: (i) The city shall require that the planning techniques, nonstructural practices, and design methods specified in the Maryland Stormwater Design Manual be used to implement ESD to the MEP. The use of ESD planning techniques and treatment practices must be exhausted before any structural BMP is implemented. Stormwater management plans for development projects subject to this article shall be designed using ESD sizing criteria, recharge volume, water quality volume, and channel protection storage volume criteria according to the Maryland Stormwater Design Manual. The MEP standard is met when channel stability is maintained, predevelopment groundwater recharge is replicated, nonpoint source pollution is minimized, and structural stormwater management practices are used only if determined to be absolutely necessary. (ii) Control of the two-year frequency storm event, ten-year frequency storm event, or both is required according to the Maryland Stormwater Design Manual and all subsequent revisions if the city determines that additional stormwater management is necessary because historical flooding problems exist, and downstream floodplain development and conveyance system design cannot be controlled. (iii) The city may require more than the minimum control requirements specified in this chapter if hydrologic or topographic conditions warrant or if flooding, stream channel erosion, or water quality problems exist downstream from a proposed project. (2) Alternate minimum control requirements may be adopted subject to administration approval. Any alternate control measure shall demonstrate implementation of ESD to the MEP and consider flood management, accelerated stream erosion, water quality, and sedimentation. Comprehensive watershed studies may also be required. (3) Stormwater management and development plans where applicable, shall be consistent with adopted and approved watershed management plans or flood management plans as approved by the department in accordance with the Flood Control and Watershed Management Act of 1976. (b) Stormwater management measures. The ESD planning techniques and structural stormwater management practices established in this chapter and the Maryland Stormwater Design Manual shall be used, either alone or in a combination, in developing a stormwater management plan. A developer shall demonstrate that ESD has been implemented to the MEP before the use of a structural BMP is considered in developing the stormwater management plan. (1) ESD techniques and practices. (i) The following planning techniques shall be applied according to the Maryland Stormwater Design Manual to satisfy the applicable minimum control requirements established in subsection (a) above: a. Preserving and protecting natural resources; b. Conserving natural drainage patterns; c. Minimizing impervious area; d. Reducing runoff volume; e. Using ESD practices to maintain one hundred (100) percent of the annual predevelopment groundwater recharge volume; f. Using green roofs, permeable pavement, reinforced turf, and other alternative surfaces; g. Limiting soil disturbance, mass grading, and compaction; h. Clustering development; and i. Any practices approved by the administration. (ii) The following ESD treatment practices shall be designed according to the Maryland Stormwater Design Manual to satisfy the applicable minimum control requirements established in subsection (a) above: a. Disconnection of rooftop runoff; b. Disconnection of non-rooftop runoff; c. Sheet flow to conservation areas; d. Rainwater harvesting; e. Submerged gravel wetlands; f. Landscape infiltration; g. Infiltration berms; h. Dry wells; i. Micro-bioretention; j. Rain gardens; k. Swales; l. Enhanced filters; and m. Any practices approved by the administration. (iii) The use of ESD planning techniques and treatment practices specified in this section shall not conflict with existing state law or local ordinances, regulations, or policies. (2) Structural stormwater management measures. (i) The following structural stormwater management practices shall be designed according to the Maryland Stormwater Design Manual to satisfy the applicable minimum control requirements established in subsection (a) above. a. Stormwater management ponds; b. Stormwater management wetlands; c. Stormwater management infiltration; d. Stormwater management filtering systems; and e. Stormwater management open channel systems. (ii) The performance criteria specified in the Maryland Stormwater Design Manual with regard to general feasibility, conveyance, pretreatment, treatment and geometry, environment and landscaping, and maintenance shall be considered when selecting structural stormwater management practices. (iii) Structural stormwater management practices shall be selected to accommodate the unique hydrologic or geologic regions of the city. (3) Covenants and/or easements for ESD planning techniques and treatment practices and structural stormwater management practices used to satisfy the minimum requirements in subsection (a) above must be recorded in the land records of the county and on file with the city and remain unaltered by subsequent property owners. Prior approval from the city shall be obtained before any stormwater management practice is altered. (4) Alternative ESD planning techniques and treatment practices, and structural stormwater management practices may be used for new development and redevelopment runoff control if they meet the performance criteria established in the Maryland Stormwater Design Manual or are approved by the administration. (i) Alternatives may be utilized in lieu of on-site stormwater management measures and may include any measures or actions the city deems appropriate to meet the intent of this chapter and the regulations. Eligible alternatives are outlined in the stormwater standards. (ii) Neither the cost of providing on-site stormwater management nor the loss of development density resulting from on-site stormwater management is sufficient justification for a request to be governed under this section. (iii) Use of alternatives will not relieve the applicant of the responsibility to provide safe conveyance of runoff and protection of other properties or city waterways as required under this chapter. (5) For the purposes of pursuing alternates to the minimum control requirements or design criteria, the owner/developer shall submit to the city an analysis of the impacts of stormwater flows downstream in the watershed. The analysis shall include hydrologic and hydraulic calculations necessary to determine the impact of hydrograph timing modifications of the proposed development upon a dam, highway, structure, or natural point of restricted streamflow. The point of investigation is to be established with the concurrence of the city, downstream of the first downstream tributary whose drainage area equals or exceeds the contributing area to the project or stormwater management facility. (c) Specific design criteria. The basic design criteria, methodologies, and construction specifications, subject to the approval of the city and the administration, shall be those of the Maryland Stormwater Design Manual or the county design guidelines.

(Ord. No. O-03-25, 4-21-25)

Ask a question about Gaithersburg law

Corpus searches the Gaithersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.