Section 405.101: Completion Of Construction.

A. The construction of all commercial and residential construction plan improvements shall be completed within two (2) years of the City Engineer's approval of the construction plans. Time extensions may be granted by the Department of Engineering for those developments showing good cause as to why the improvements have not been completed. If construction under the approved construction plan is to continue beyond the two-year period, the developer must request an extension of the approved plan and provide for extending the escrow or other surety on the project prior to the expiration of the plan; otherwise, work on the project must cease. Any request for an extension under this Section that is denied by City staff can be appealed to the City Council. The developer may request a period of construction longer than two (2) years with the initial approval at the Planning and Zoning Commission meeting by providing a suitable explanation for the request. On projects with an extended construction period, suitable escrows must be provided for the extended period. If construction is not actively pursued during the course of the extended period of construction approval (beyond the initial two-year period), the City may cancel the extension with thirty (30) days' written notice to the developer. Any canceled extension under this Section may be appealed to the City Council. B. Release Of Escrow; Additional Escrow. 1. The final release of escrow on all public improvements will be made in accordance with Section 405.110 of this Chapter. A five percent (5%) escrow relating to certain categories of improvements may be held if additional improvements within that particular category are planned for additional phases of the overall project or subdivision. If the developer chooses, a replacement escrow or maintenance bond (for improvements outside the current phase) will be allowed to cover this for the earlier phase of the project. 2. In special cases, the construction of the development may impact existing facilities outside the development. In these cases, the Department of Engineering will notify the developer of the need to provide an additional escrow or maintenance bond prior to Planning and Zoning approval of the development. This escrow or maintenance bond is designated only for facilities directly affected by work in the development. As an example this would include, but not be limited to, the main access road into the site and water/sewer lines to or from the site. This escrow or maintenance bond shall not exceed five percent (5%) of the value of the existing improvements and will be held until the project is completed. C. Issuance Of Building Permits. 1. The Building Official shall not issue building permits for any residential structures located on lots within a recorded plat until all street improvements and storm sewers required to be installed within such recorded plat have been installed and are usable. "Usable" is defined as the aforementioned categories have been installed and are functioning as intended and the street is connected to another public street. For water service and sanitary sewers, all the improvements must be installed and connected to the system, but acceptance by the water or sewer authority is not necessary for the building permit to be issued. 2. In a case where the water system has not been accepted, the builder must certify that a usable fire hydrant exists within six hundred (600) feet of the building or must obtain approval from the fire district prior to the building permit being issued. The Department of Engineering's lot inspection, prior to a certificate of occupancy being issued, shall not be approved without approval of the water service and sanitary sewers by the appropriate water or sewer authority. D. The Building Official shall not issue any certificate of occupancy for any residential structure located on a lot within a recorded plat until all permanent utilities servicing such structure have been installed and are functioning and operating as designed. For the purpose of enforcing this Subsection (D) only, utilities shall include water, sanitary sewer, storm sewer, electric and natural gas (if applicable for heating of the structure).

[R.O. 2008 § 405.101; Ord. No. 6496 , 9-13-2018 ; Ord. No. 7056 , 10-26-2023 ]