§ 405.111 — Residential Development (Attached And Detached Single-Family) Escrow Requirements

Code of Ordinances, City of O'Fallon, Missouri (Code 2026-10-22) · O'Fallon City Code § 405.111

Corpus is an independent public-information project, not the official City of O'Fallon website. Stable reference: corpuslaw.us/code/2c8a8a02-b8c5-4a26-aeb2-a7ecb306c2aa

Section 405.111: Residential Development (Attached And Detached Single-Family) Escrow Requirements.

A. Surety Bond. The City may accept a surety bond and such bond shall be in an amount and with surety and other reasonable conditions providing for and securing the actual construction and installation of the improvements and utilities. B. Amount. The bond or escrow account shall be an amount, estimated by the design engineer and approved by the City Engineer and/or his/her designee, equal to the estimated cost for completing construction of the improvements over the anticipated construction period and contingencies based on an estimating guide reasonably acceptable to the City Engineer and/or his/her designee. The City Engineer and/or his/her designee, in order to protect the City's taxpayers from the cost of correcting or completing development projects in a timely manner, shall estimate the costs to cure or complete so as to ensure that all estimated future costs and contingencies are included in the amount. 1. Any existing subdivision where a non-City-owned utility line is being constructed along an existing development common ground or private property shall have escrow provided for that off-site common ground or private property restoration. C. Term, Length, Extension. The initial term length in which the development bond or development escrow is in force shall be for a period not to exceed two (2) years, unless extended by the City. If the developer fails to file a certificate of completion with the City and obtain a completion certification from the City before the end of the initial term length, the bond or escrow shall continue in force until released by the City Engineer and/or his/her designee. D. Development Escrow Release. The bond or escrow amount held by the City to secure actual construction and installation on each component of the improvements or utilities shall be released within thirty (30) days of completion of each category of improvement or utility work to be installed, minus a maximum retention of ten percent (10%) which shall be released upon completion as set forth herein. The City shall inspect each category of improvement or utility work within twenty (20) business days after a request for such inspection. Any such category of improvement or utility work shall be deemed to be completed upon certification by the City that the project is complete in accordance with the ordinances of the City, including the filing of all documentation and certifications required by the City in complete and acceptable form. The release shall be deemed effective when the escrow funds are duly posted with the United States Postal Service or other agreed-upon delivery service or when the escrow funds are hand delivered to an authorized person or place as specified by the owner or developer or when notice of release is sent to the escrow bond surety. Once the developer or builder has completed part of the site improvements in a timely and satisfactory manner, the City should promptly release the appropriate pro rata amount of escrow or bond funds. If the City has not released such escrow funds or bond amount within thirty (30) days as provided in this Section, the City shall be subject to pay the owner or developer, in addition to the escrow funds due the owner or developer, interest at the rate of one and one-half percent (1 1/2%) per month of any escrow funds unlawfully retained calculated from the expiration of the thirty-day period until the escrow funds have been released. Any owner or developer aggrieved by the City's failure to observe the requirements of this Chapter may bring a civil action to enforce the provisions of this Chapter. In any civil action or part of a civil action to enforce the provisions of this Section, a court may award the prevailing party or the City the amount of all costs attributable to the action, including reasonable attorneys' fees. 1. The original plat's development escrow will be released in two (2) phases, a ninety percent (90%) release and a final ten percent (10%) release with the following requirements: For the ninety percent (90%) release, the following requirements will be inspected with minimal inspection time on-site, and each category can be released individually. For the final ten percent (10%) release, the following requirements will require a full inspection, and all categories will be released at the same time. These conditions are minimal as deficiencies are reported as inspected, and the inspection reports will be supplied to the developer. a. Criteria Inspected for Conformance to Approved Plans and City Codes (The following items must be done prior to requesting inspection.): (1) Streets: ninety percent (90%) release. (a) Constructed under City of O'Fallon inspection. (b) Roadway backfilled and compacted to City standards. (c) Layout generally conforms to approved site plans. (d) Concrete cylinder breaks equal to or greater than required within twenty-eight (28) days. (e) All joints properly located and sealed. (2) Storm sewers: ninety percent (90%) release. (a) Constructed under City of O'Fallon inspection. (b) Installation of all storm infrastructures has been installed and in general conformance to approved site plans. (c) Proper backfill and compaction of backfill material. (d) All grading adjacent to inlets to provide for proper drainage in accordance with the drainage area map, and proper grading around all other structures. (e) Proper construction of all detention/retention basins. (f) Erosion control in working condition. (3) Sanitary sewers (City of O'Fallon System): ninety percent (90%) release. (a) Constructed under City of O'Fallon inspection. (b) Installation of all sanitary infrastructures has been installed and in general conformance to approved site plans. (c) Proper placement and compaction of backfill material. (d) Successfully pull a mandrel through all main lines (public and private) and pressure/vacuum test approved. (4) Water (City of O'Fallon System): ninety percent (90%) release. (a) Constructed under City of O'Fallon inspection. (b) Installation of all water infrastructures has been installed and in general conformance to approved site plans. (c) Proper placement and compaction of backfill material. (d) Successful bacteria testing and pressure test approved. (5) Grading: ninety percent (90%) release. (a) Constructed under City of O'Fallon inspection. (b) Generally conforms to approved site plans. (c) Erosion control, diversion swales, and sediment basins installed. (d) Site stabilization per County codes has been started or completed. (6) Common ground: ninety percent (90%) release. (a) Amenities directly related to or along the frontage of the common ground, if required, are installed in general conformance to the approved site plans. (7) Other: ninety percent (90%) release. (a) Landscaping, if required, is installed in general conformance to the approved site plans. (b) Items escrowed that do not fit into other categories have been installed under City of O'Fallon inspection and are in general conformance to the approved site plan. (c) Installation of traffic control signage, pavement markings, streetlighting, and street ID signs. (8) All categories: final ten percent (10%) release. (a) Any deficiencies that have occurred since initial escrow release have been repaired. (b) Subdivision record plat approved and recorded and acceptance of the dedication of public improvements to be maintained by the City of O'Fallon. (c) As-builts approved. (9) Streets: final ten percent (10%) release. (a) Core drills for proper thickness (performed by City). (b) Straightedge testing meets requirements. (c) Sidewalks, not associated with a home lot, constructed under City of O'Fallon inspection. (10) Storm sewer: final ten percent (10%) release. (a) Grading around structures with proper drainage. (b) All temporary siltation control devices removed. (11) Sanitary sewers (City of O'Fallon System): final ten percent (10%) release. (a) Grading around structures completed. (12) Water (City of O'Fallon System): final ten percent (10%) release. (a) Grading around structures completed. (13) Grading: final ten percent (10%) release. (a) Conforms to approved site plans. (b) Vegetation seventy-five percent (75%) established throughout the plat. (14) Common ground: final ten percent (10%) release. (a) Amenities directly related to or along the frontage of the common ground installed per the approved construction plans. (b) Developer shall provide information regarding the establishment of the first member of the Board of Trustees or Board of Directors for the subdivision, per the record plat procedures, and provide trustees contacts. (15) Other: final ten percent (10%) release. (a) Completion of all signs and lights. (b) Completion/approval of as-built drawings. (c) Items escrowed that do not fit into other categories have been completed, or replacement escrow provided. 2. When the final ten percent (10%) escrow is ready to be released, staff will make a recommendation to the City Council for the acceptance and dedication of related City infrastructure.

[R.O. 2008 § 405.111; Ord. No. 6496 , 9-13-2018 ; Ord. No. 7056 , 10-26-2023 ]