Section 405.120: Inspection Of Improvements.

[Note: Existing escrow agreements will follow the protocol in place when the agreement was signed.] A. General Inspection Requirements. 1. Prior to starting any of the work covered by the permitted work and after approval thereof, the applicant shall make arrangements to provide for inspection of the permitted work, sufficient in the opinion of the City Engineer and/or his/her designee, to assure compliance with the plans and specifications as approved. 2. The City Engineer and/or his/her designee shall make all necessary inspections of City infrastructure, escrow items or infrastructure located on the approved plans. This does not relieve the developer from any necessary inspections or testing requirements that are still required by said developer. 3. Twenty-four (24) hours' notice shall be given to the City Engineer's office regarding any requested inspection. B. The City shall certify that the project is complete in accordance with the following process: 1. Once the improvements or utilities have been constructed or installed, the developer is responsible for obtaining necessary inspections by requesting such inspection in writing to the Department of Engineering. Following a satisfactory inspection and receipt by the Department of Engineering of verification from the appropriate inspecting authority that all improvements are constructed or installed in accordance with the approved plans, the Department of Engineering will then review all documents to verify that each category of improvement or utility work is constructed or installed and, if so, will recommend release of the development escrow for that category and notify the necessary entities of said approval for release. 2. The Department of Engineering will issue a construction inspection report listing all deficiencies within thirty (30) days of receipt of a written request to approve or inspect improvements subject to the following requirements: a. All inspections will be made within thirty (30) working days after the receipt of a written request for inspection. This time frame represents the normal maximum time span required from receipt of written request to signing the construction inspection approval memorandum or the construction inspection report. Inspections may be delayed by workload, weather and ground conditions, especially during the winter when a complete inspection cannot be accomplished. A construction inspection approval memorandum will not be issued where deficiencies exist. Without a construction approval memorandum, the Department of Engineering will not recommend release of escrow. When deficiencies exist, the Department of Engineering will provide a construction inspection report to the developer. b. If deficiencies listed in a construction inspection report are corrected within sixty (60) days of the date of the construction inspection report, the Department of Engineering will not conduct any additional inspections other than to verify the correction of the deficiencies. If the deficiencies listed in a construction inspection report are corrected between sixty (60) days and ninety (90) days, the Department of Engineering will not conduct any additional inspections other than to verify the correction of the deficiencies or discover additional major deficiencies. If deficiencies listed in a construction inspection report are not corrected until more than ninety (90) days' time after the date of the construction inspection report, the site is subject to reinspection, and any deficiencies may be added requiring correction. 3. As-built plans shall serve as certification by the developer's engineer that improvements have been installed. 4. The Department of Engineering shall assure that all documentation and certifications required by the City of O'Fallon have been received in complete and acceptable form prior to release of any escrow monies. 5. Escrow release shall be in accordance with the type of escrow that is being held. The process is described under each of the appropriate Sections in Sections 405.111 through 405.115.

[R.O. 2008 § 405.120; Ord. No. 6496 , 9-13-2018 ; Ord. No. 7015 , 4-27-2023 ]