Sec. 14-277. - Regulations governing stormwater discharge; retention and detention.
(a) Regulations governing rate of stormwater discharge. (1) Rate of discharge shall be determined at each point where stormwater leaves the property being developed in its pre-development state. (2) The stormwater management system shall be designed so that the peak flow rate at any discharge point in the post-development state shall be less than or equal to the peak flow rate for the discharge point in the pre-developed state for the two-year, five-year, ten-year, 25-year, 50-year and 100-year 24-hour storm events. (3) In addition to the peak flow requirement listed in subsection (a)(2) of this section, it is the responsibility of the developer and his engineer to ensure that any change in timing of the discharge of the 100-year storm event does not create a flooding problem at any road, street, or stormwater conveyance within 500 feet of any discharge exit point from the property which did not previously exist. (b) Regulations regarding velocity of stormwater discharge. (1) Velocity calculations for the purpose of compliance with this section shall be calculated using the two-year 24-hour storm event. (2) The velocity of flow at any of the stormwater discharge points from the property for the post-developed state shall be less than or equal to the velocity of flow in the pre-developed state. (c) Regulations regarding regimes of flow. (1) For the purpose of this section, there will be considered to be two regimes of flow: sheet flow and concentrated flow. a. The term "sheet flow" means any flow for which there is no defined channel in the ground at the exit point from the property. Any flow designated as either sheet flow or shallow concentrated flow for the purpose of SCS TR-55 flow calculations will fall into the category of sheet flow for the purpose of this section. b. The term "concentrated flow" means any flow for which there is a defined channel or culvert in the ground at the exit point from the property. (2) Flow must exit the property in the post-developed condition in the same regime as it exited the property in the pre-developed condition unless otherwise approved by the city. (d) Regulations regarding bypass of upstream flows. (1) If it is desired by the developer of a piece of property to pass upstream flows through the property through means of a drainageway physically separated from the stormwater management system of the development, this a an acceptable practice. Permission of the United States Army Corp of Engineers may be required. (2) The bypass drainageway must be designed to pass the 100-year 24-hour storm event without overtopping. (3) The bypass drainageway must exit the property in the post-developed condition at the same location as the drainage from the upstream basin exited the property in the pre-developed state. (4) The bypass drainageway must have approximately the same flow exiting the property as it did entering the property or must be included in the calculations for the overall stormwater management system for the development. (5) In addition to the peak flow requirement listed in subsection (a)(2) of this section, it is the responsibility of the developer and his engineer to ensure that any change in timing of the discharge of the 100-year storm event does not create a flooding problem at any road, street, or stormwater conveyance within 500 feet of any discharge exit point from the property which did not previously exist. (e) Regulations regarding detention in the 100-year floodplain. (1) In the event that detention is to be provided within the 100-year floodplain, no storage will be considered below the flood elevation for the respective design storm event (e.g., two-year, five-year, ten-year, 25-year, 50-year, or 100-year 24-hour storm event). (2) In the event that calculations determining the elevation of the appropriate design storm event are not conclusively presented, no storage will be considered below the 100-year flood elevation. (f) Regulations regarding retention in detention ponds. (1) A retention/detention basin provides for the permanent storage of water while utilizing the freeboard above the permanent pool elevation for detention of stormwater runoff. (2) Wet pond refers to the retention portion of the basin. No volume below the permanent pool elevation for the wet pond will be considered for storage in the detention calculations. (3) The city reserves the right to require aeration in any wet pond at the expense of the developer. In the event that the developer questions such a requirement, he must provide calculations showing that the pond will not become a nuisance during any month of the year. (g) Existing downstream erosion and flooding problems. (1) To the maximum extent practicable, developers shall provide assistance with downstream drainage problems by means of decreasing rates of flow to substantially less than their pre-development conditions or slowing flow velocities to substantially less than their pre-development state. (2) In the event that an opportunity exists, the city will make the possibility known to the developer at the earliest opportunity.
(Code 1974, app. D, § 501)