§ 14-280 — Basic stormwater management design criteria

Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 14-280

Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/7c65cd37-66cf-4c49-8a58-37eeb15b98b7

Sec. 14-280. - Basic stormwater management design criteria.

(a) Technical standards. (1) Storage volumes. Any detention or retention basin shall provide storage sufficient to control the excess runoff from the two-year, five-year, ten-year, 25-year, 50-year, and 100-year 24-hour storm events. (2) Maximum depth. The maximum depth from the emergency spillway elevation to the lowest bottom of basin elevation shall be five feet unless deeper depths are approved by the city. (3) Side-slopes. Side-slopes of the wet side of a detention basin dam shall be 4:1 or flatter. Side-slopes of the dry side of a detention or retention basin dam shall be 3:1 or flatter. These criteria are maximum slopes and are not intended to be design guidelines. The developer's engineer shall use geotechnical expertise and sound engineering judgment in the determination of appropriate slopes. (4) Principle spillway (PSW). The principle spillway shall be a reinforced concrete pipe of a class suitable for the depth of cover and other loads. The inlet control structure shall be a cast-in-place or precast concrete and designed to operate utilizing gravity and water head as the only driving forces. Inlet control structures utilizing pumps or other artificial operators are prohibited. The minimum diameter of the outfall pipe of the principle spillway is 15 inches. Seepage collars or a foundation trench, chimney drain, and strip drain shall be provided on all pipes through the dam embankment. The minimum size discharge pipe shall not control the discharge over the spillway. If the maximum allowable discharge is less than the capacity of the minimum size discharge pipe, then other means to limit discharge to the maximum allowable shall be provided. (5) Emergency spillways (ESW). Emergency spillways should be constructed in cut conditions whenever possible and should not be provided over the dam embankment. In the event that a ramp spillway (a spillway over the embankment) is required by site conditions, this spillway must be paved using either concrete or riprap from the beginning of the control section to at least five feet past the downstream toe of the dam. Emergency spillways must be open channels and may not be pipes. The control section of the ESW must be a section which is level in profile, set at the ESW elevation, and at least ten feet long in profile. Vegetative cover must be established over all unpaved portions of the ESW. The ESW must be designed to pass the 50-year 24-hour storm event should the PSW get clogged. (6) Downstream channels. Calculations must be provided showing the capacity of downstream channels to handle the rate and velocity of flow from the detention or retention basin. These calculations must also meet all the standard stormwater design criteria of the city. (b) Appearance. Natural vegetation shall be maintained in and around any detention or retention areas where possible. No trees or deep-rooted shrubs shall be planted on any detention or retention dam. (c) Seed, sod, and mulch. The requirements for seeding, sodding, and mulching shall be in accordance with the state department of transportation standard specifications. (d) Fencing. Detention and retention structures shall be enclosed by a six-foot fence where the depth of the water could reach two feet. (e) Retention/detention basins. (1) Retention/detention criteria. Retention/detention basins shall conform to all of the criteria listed in this subsection (e). (2) Minimum depths. The minimum depth of the permanent pool shall be four feet. (3) Facilities for emptying. For emergency purposes and periodic maintenance, facilities shall be provided or plans prepared to permit emptying and drainage. Pumps may be planned to be used for this purpose but an emergency plan must be prepared which details the precise location for obtaining the pump and an estimated time for its arrival. (4) Side-slopes. Below water side-slopes shall be 4:1 or flatter. A ledge shall be located between two and three feet under the permanent pool elevation which slopes back toward shore at about a one percent slope. This ledge shall be a minimum of four feet wide. These criteria are maximum slopes and are not intended to be design guidelines. The developer's engineer shall use geotechnical expertise and sound engineering judgment in the determination of appropriate slopes. (5) Freeboard. There shall be a freeboard of at least 12 inches from the permanent pool elevation to the top of dam and the PSW structure should be capable of passing the 100-year 24-hour storm event before overtopping the dam. (6) Sediment storage. Sediment storage shall be provided in all retention ponds such that sediment removal should be required no more than annually. (f) Freestanding velocity control structures (energy dissipaters). (1) Where energy dissipaters are required to meet the velocity requirements contained within this section, those structures shall be constructed in a permanent nature and shall be comprised of concrete, masonry, or stone. (2) Energy dissipaters are considered to be freestanding when they are more than 100 feet downstream from detention or retention dam. (g) Flow regime structures. (1) Where flow regime structures are required to meet the flow regime requirements contained within this section, those structures shall be constructed in a permanent nature and shall be comprised of concrete, masonry, or stone. (2) Flow will be considered to have been returned from concentrated flow to sheet flow when the flow width has been increased to five times the concentrated flow width (top of bank to top of bank) or 40 feet, whichever is greater.

(Code 1974, app. D, § 504; Ord. No. 2004-365, §§ 1, 2, 10-19-2004)