For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-279 — Waivers to stormwater management requirements

Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 14-279

Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/4c6720b5-d748-47a5-bb63-107d3708fd38

Sec. 14-279. - Waivers to stormwater management requirements.

(a) Waivers for providing stormwater management. (1) Every applicant shall provide for stormwater management as required by this division, unless a written request is filed to waive this requirement. Requests to waive the stormwater management plan requirements shall be submitted to the city for approval. The city may waive the requirement of the use of a professional engineer upon a determination that the use of another qualified stormwater professional will be adequate for the particular project. No stormwater management plan shall be required for construction in cases where the construction activity is part of a larger development or subdivision where a stormwater management plan has been previously constructed and approved by the city. The erosion and sediment control plan for the construction activity and the construction activity must be in compliance with the approved stormwater management plan. (2) The minimum requirements for stormwater management may be waived in whole or in part upon written request of the applicant, provided that at least one of the following conditions applies: a. It can be demonstrated that the proposed development is not likely to impair attainment of the objectives of this article; b. Alternative minimum requirements for on-site management of stormwater discharges have been established in a stormwater management plan that has been approved by the city; c. Provisions are made to manage stormwater by an off-site facility. The off-site facility is required to be in place, to be designed and adequately sized to provide a level of stormwater control that is equal to or greater than that which would be afforded by on-site practices and there is a legally obligated entity responsible for long-term operation and maintenance of the stormwater practice; d. The city finds that meeting the minimum on-site management requirements is not feasible due to the natural or existing physical characteristics of a site; or e. Nonstructural practices will be used on the site that reduce the: 1. Generation of stormwater from the site; 2. Size and cost of stormwater storage; and 3. Pollutants generated at the site. These nonstructural practices are explained in detail in the current stormwater design manual and the amount of credit available for using the practices shall be determined by the city. (3) In instances where one of the conditions in subsection (a)(2) of this section applies, the city may grant a waiver from strict compliance with these stormwater management provisions, as long as acceptable mitigation measures are provided. However, to be eligible for a variance, the applicant must demonstrate to the satisfaction of the city that the variance will not result in the following impacts to downstream waterways: a. Deterioration of existing culverts, bridges, dams, and other structures; b. Degradation of biological functions or habitat; c. Accelerated streambank or streambed erosion or siltation; or d. Increased threat of flood damage to public health, life, or property. (4) Furthermore, where compliance with minimum requirements for stormwater management is waived, the applicant will satisfy the minimum requirements by meeting one of the mitigation measures selected by the city. Mitigation measures may include, but are not limited to, the following: a. The purchase and donation of privately owned lands, or the grant of an easement to be dedicated for preservation or reforestation. These lands should be located adjacent to the stream corridor in order to provide permanent buffer areas to protect water quality and aquatic habitat. b. The creation of a stormwater management facility or other drainage improvements on previously developed properties, public or private, that currently lack stormwater management facilities designed and constructed in accordance with the purposes and standards of this article. c. Monetary contributions (fee-in-lieu) to fund stormwater management activities such as research and studies (e.g., regional wetland delineation studies, stream monitoring studies for water quality and macroinvertebrates, stream flow monitoring, threatened and endangered species studies, hydrologic studies, and monitoring of stormwater management practices). (b) Fee-in-lieu of stormwater management practices. Where the city waives all or part of the minimum stormwater management requirements, or where the waiver is based on the provision of adequate stormwater facilities provided downstream of the proposed development, the applicant shall be required to pay a fee in an amount as determined by the city. When an applicant obtains a waiver of the required stormwater management, the monetary contribution required shall be in accordance with a fee schedule (unless the developer and the city agree on a greater alternate contribution) established by the city and based on the cubic feet of storage required for stormwater management of the development in question. All of the monetary contributions shall be credited to an appropriate capital improvements program project and shall be made by the developer prior to the issuance of any building permit for the development. (c) Dedication of land. In lieu of a monetary contribution, an applicant may obtain a waiver of the required stormwater management by entering into an agreement with the city for the granting of an easement or the dedication of land by the applicant, to be used for the construction of an off-site stormwater management facility. The agreement shall be entered into by the applicant and the city prior to the recording of plats or, if no record plat is required, prior to the issuance of the building permit. (d) General performance criteria for stormwater management. (1) Unless determined by the city to be exempt or granted a waiver, the following performance criteria shall be addressed for stormwater management at all sites: a. All site designs shall establish stormwater management practices to control the peak flow rates of stormwater discharge associated with specified design storms and reduce the generation of stormwater. These practices should seek to utilize pervious areas for stormwater treatment and to infiltrate stormwater runoff from driveways, sidewalks, rooftops, parking lots, and landscaped areas to the maximum extent practicable to provide treatment for both water quality and quantity. b. All stormwater runoff generated from new development shall not discharge untreated stormwater directly into a jurisdictional wetland or local water body without adequate treatment. Where the discharges are proposed, the impact of the proposal on wetland functional values shall be assessed using a method acceptable to the city. In no case shall the impact on functional values be any less than allowed by the Army Corp of Engineers (ACE) or the MDEQ responsible for natural resources. c. Annual groundwater recharge rates shall be maintained by promoting infiltration through the use of structural and nonstructural methods. At a minimum, annual recharge from the post development site shall mimic the annual recharge from pre-development site conditions. d. For new development, structural stormwater treatment practices (STP) shall be designed to reduce, to the maximum extent practicable, the average annual post-development total suspended solids (TSS) load. It is presumed that a STP complies with this performance standard if it is: 1. Sized to capture the prescribed water quality volume (WQV); 2. Designed according to the specific performance criteria outlined in the local stormwater design manual; 3. Constructed properly; and 4. Maintained regularly. e. To protect stream channels from degradation, a specific channel protection criteria shall be provided as prescribed in the current stormwater design manual. f. Stormwater discharges to critical areas with sensitive resources (i.e., cold water fisheries, swimming areas, recharge areas, water supply reservoirs) may be subject to additional performance criteria, or may need to utilize or restrict certain stormwater management practices. g. Certain industrial sites are required to prepare and implement the stormwater pollution prevention plan, and shall file a notice of intent (NOI) under the provisions of the NPDES general permit. The stormwater pollution prevention plan requirement applies to both existing and new industrial sites and must comply with division 2 of this article. h. Stormwater discharges from land uses or activities with higher potential pollutant loadings, known as hotspots, may require the use of specific structural STPs and pollution prevention practices. i. Prior to design, applicants are required to consult with the city to determine if they are subject to additional stormwater design requirements. j. The calculations for determining peak flows found in this division shall be used for sizing all stormwater management practices.

(Code 1974, app. D, § 503; Ord. No. 2004-365, §§ 1, 2, 10-19-2004)

Ask a question about Pearl law

Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.