§ 14-282 — General requirements

Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 14-282

Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/3ec28ab3-81c8-454f-8814-a21f5bc5a302

Sec. 14-282. - General requirements.

(a) Engineer's statement. All maps and calculations submitted under this division shall be accompanied by a transmittal letter that contains an engineer's statement in the form prescribed by the board of aldermen. (b) Minimum control requirements. All stormwater management practices will be designed so that the specific storm frequency storage volumes (e.g., recharge, water quality, channel protection, ten-year, 100-year) as identified in the current stormwater design manual are met, unless the city grants the applicant a waiver or the applicant is exempt from the requirements. Additionally, if hydrologic or topographic conditions warrant greater control than that provided by the minimum control requirements, the city reserves the right to impose any and all additional requirements deemed necessary to control the volume, timing, and rate of runoff. (c) Site design feasibility. (1) Stormwater management practices for a site shall be chosen based on the physical conditions of the site. Among the factors that should be considered are: a. Topography; b. Maximum drainage area; c. Depth to water table; d. Soils; e. Slopes; f. Terrain; g. Head; and h. Proximity to environmentally sensitive features or ultra-urban areas. (2) Applicants shall consult the stormwater design manual for guidance on the factors that determine site design feasibility when selecting a stormwater management practices. (d) Conveyance issues. (1) All stormwater management practices shall be designed to convey stormwater to allow for the maximum removal of pollutants and reduction in flow velocities. This shall include, but not be limited to: a. Maximizing of flow paths from inflow points to outflow points; b. Protection of inlet and outfall structures; c. Elimination of erosive flow velocities; and d. Providing of underdrain systems, where applicable. (2) The stormwater design manual provides detailed guidance on the requirements for conveyance for each of the approved stormwater management practices. (e) Pretreatment requirements. Every stormwater treatment practice shall have an acceptable form of water quality pretreatment, in accordance with the pretreatment requirements found in the current stormwater design manual. Certain stormwater treatment practices, as specified in the stormwater design manual, are prohibited even with pretreatment in the following circumstances: (1) Stormwater is generated from highly contaminated source areas known as hotspots; (2) Stormwater is carried in a conveyance system that also carries contaminated, non-stormwater discharges; (3) Stormwater is being managed in a designated groundwater recharge area; and (4) Certain geologic conditions exist (e.g., karsts) that prohibit the proper pretreatment of stormwater. (f) Treatment/geometry conditions. All stormwater management practices shall be designed to capture and treat stormwater runoff according to the specifications outlined in the stormwater design manual. These specifications will designate the water quantity and quality treatment criteria that apply to an approved stormwater management practice. (g) Landscaping plans required. All stormwater management practices must have a landscaping plan detailing both the vegetation to be in the practice and how and who will manage and maintain this vegetation. (h) Maintenance agreements. All stormwater treatment practices shall have an enforceable operation and maintenance agreement to ensure the system functions as designed. This agreement will include any and all maintenance easements required to access and inspect the stormwater treatment practices, and to perform routine maintenance as necessary to ensure proper functioning of the stormwater treatment practice. In addition, a legally binding agreement specifying the parties responsible for the proper maintenance of all stormwater treatment practices shall be secured prior to issuance of any permits for land disturbance activities. (i) Nonstructural stormwater practices. The use of nonstructural stormwater treatment practices is encouraged in order to minimize the reliance on structural practices. Credit in the form of reductions in the amount of stormwater that must be managed can be earned through the use of nonstructural practices that reduce the generation of stormwater from the site. These nonstructural practices are explained in detail in the current stormwater design manual and Mississippi Gulf Coast Stormwater Management Tool Box Volume 1 and applicants wishing to obtain credit for use of nonstructural practices must ensure that these practices are documented and remain unaltered by subsequent property owners.

(Code 1974, app. D, § 506; Ord. No. 2004-365, §§ 1, 2, 10-19-2004)