§ 14-281 — Submittal requirements
Code of Ordinances, City of Pearl, Mississippi (Supp. No. 2: codified through Ordinance of October 3, 2023) · Pearl Code of Ordinances § 14-281
Corpus is an independent public-information project, not the official City of Pearl website. Stable reference: corpuslaw.us/code/c7127090-a5cd-4506-be8c-5eef18824c75
Sec. 14-281. - Submittal requirements.
(a) Rate of discharge. (1) Pre-development state drainage map. A drainage map shall be provided to the city showing (at a minimum) the following: a. Contours of the land at two-foot maximum intervals (in flat areas, hot spots and drainage areas, delineating the drainage basins, and showing the points where stormwater discharge exits the property; b. Property lines and easements with purposes noted. Names of all adjacent property owners and all property owners within 500 feet downstream; c. Vicinity map; d. Public rights-of-way adjacent to the property; e. Existing drainage facilities and structures; f. A graphical display of the hydraulic length of the different drainage basins, which was used for calculating the time of concentration and travel time for each basin; g. Location and elevations of all defined floodplains for the site. (2) Pre-development state calculations. Calculations shall be provided which show the pre-development rate of runoff at each of the exit points for the two-year, five-year, ten-year, 25-year, 50-year, and 100-year 24-hour storm events. These calculations shall use the SCS TR-55 methodology or other methodology approved by the city. (3) Post-development state calculations (without detention). Calculations shall be provided which show the post-development rate of runoff at each of the exit points for the two-year, five-year, ten-year, 25-year, 50-year, and 100-year 24-hour storm events. These calculations shall use the SCS TR-55 methodology or other methodology approved by the city. These calculations shall use the same methodology and assumptions which were used to calculate the existing (pre-development state) peak flow rates. (4) Post-development state drainage map. A drainage map shall be provided to the city showing (at a minimum) the following: a. The existing and proposed contours of the land at one-foot maximum intervals showing the effect of the proposed development on the delineation of the drainage basins and on the points where stormwater discharge exits the property; b. A table that gives the following information for each exit point: 1. Existing and proposed acreage draining to that point; 2. Existing and proposed time of concentrations; 3. Existing and proposed curve numbers; 4. Existing and proposed peak flow rates for the two-year, five-year, ten-year, 25-year, 50-year and 100-year 24-hour storm events (without detention). c. Proposed type of street drainage (e.g., roadside ditch, curb, or curb and gutter); d. Proposed storm sewers and open drainageways; e. Location of proposed detention basins numbered to correspond with details; f. Proposed peak flow rates and velocities for design flows at all exit points for the property, including bypass channels; g. Location and elevations of all defined floodplains. (5) Stormwater detention calculations. In the event that stormwater detention is utilized to manage the stormwater peak flow rate, calculations must be provided which show the following for each exit point: a. Stage-storage-discharge curves for the detention basins; b. Inflow hydrographs for the two-year, five-year, ten-year, 25-year, 50-year and 100-year 24-hour storm events (these must use the same methodology and assumptions as the peak flow calculations listed above); c. Outflow hydrographs for the two-year, five-year, ten-year, 25-year, 50-year and 100-year 24-hour storm events (same methodology as referenced above); d. Emergency spillway elevations with section and profile view; e. Inlet riser details showing elevations and principle spillway details; f. Top of dam and overtop elevations; g. Listing of all input assumptions (if computer software used); h. The FEMA 100-year flood elevation at the location of the proposed detention basin and any impacts on the storage volume. (6) Final grading and drainage plan. A plan shall be provided to the city showing the effect of the proposed development with detention on the contours of the land, the delineation of the drainage basins, and on the points where stormwater discharges from the property. This plan must include all information required in subsection (a)(4)b of this section, and all of the following, as a minimum: a. Layout of all proposed improvements on the site; b. Existing and proposed contours with a one-foot maximum interval; c. The banks and centerlines of streams and channels; d. The normal shoreline of lakes, ponds, retention and detention basins; e. Storm, sanitary, and combined sewers with inverts and outfalls; f. Delineation of 100-year floodplain as established by the 100-year flood elevations and the surveyed contours of the property; g. Environmental features, such as wetlands and designated natural areas; h. Proposed storm sewers, including sizes, inverts, outfalls, slopes, design flows, and headwater depths; i. Location and invert elevation of proposed and existing sanitary sewers at all locations where they cross storm sewers; j. A table which gives the following information for the site: 1. Overall site acreage; 2. Existing impervious surface percentage; 3. Proposed impervious surface percentage; k. For each retention/detention basin, a table shall be shown giving the following information; at a minimum: 1. Permanent pool elevation (retention only); 2. Permanent pool storage in acre-feet (retention only); 3. ESW elevation; 4. Pool storage at ESW elevation in acre-feet; 5. Outflow rate at ESW elevation; 6. Top of dam elevation; 7. Pool storage at top of dam elevation in acre-feet; 8. Outflow rate at top of dam elevation; 9. The FEMA 100-year floodplain elevation at the location of the detention basin. (b) Routing of the 100-year storm event. Calculations shall be provided demonstrating that the 100-year storm event has been routed through the proposed drainage system utilizing the SCS TR-55 methodology or other methodology approved by the city. The calculations shall show, at a minimum, the ability of the detention basin/ESW system to handle the 100-year storm event without overtopping. (c) Velocity of discharge. The following shall be provided: (1) Calculations for all discharge exit points giving the velocities of flow shall take into account changes in flow rates, cross section, channel lining, flow regime, and proximity of detention basin outfall. (2) Calculations showing the impact of energy dissipaters as required on the velocity of discharge flow. (d) Regimes of flow. (1) Detailed information shall be provided for each discharge exit point from the proposed development property, which determines the pre-development flow regime. Survey information, photographic evidence, or engineer's certification are acceptable. (2) Should it be required to change a concentrated flow to a sheet flow, calculations will be required showing the minimum spread of flow. (3) Sketches will be required showing the layout of the overflow structure and how it meets the minimum flow spread. (e) Bypass channels. The following shall be provided: (1) Calculations showing the ability of the bypass channel to handle the 100-year 24-hour storm event without overtopping. (2) Calculations showing the ability of the bypass channel to handle the two-year 24-hour storm event without severe erosion problems. (f) Retention basins. The following shall be provided: (1) Calculations demonstrating that the retention basin can pass the 100-year 24-hour storm event without overtopping the dam. (2) Calculations confirming that the retention basin has sufficient storage to store one average year of sediment. (g) Required details. (1) Cross section of proposed detention or retention dams; (2) Detail of PSW inlet structure; (3) Profile of ESW; (4) Cross section of ESW; (5) Detail of impact basin at PSW outlet (if required); (6) Cross sections of all major proposed drainage channels showing lining; (7) Details of freestanding velocity control structures (if required); (8) Details of flow spread structures (if required); (9) Sections of retention basin side-slopes; and (10) Detail of retention basin emptying system.
(Code 1974, app. D, § 505; Ord. No. 2004-365, §§ 1, 2, 10-19-2004)
Ask a question about Pearl law
Corpus searches the Pearl sections it holds and shows the ones that match, with their citations. Free, no sign-in.