For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 24.05.060 — Inspections

Lincoln, Nebraska Municipal Code (enCodePlus online edition as published 2026-11-08 (history notes seen through Ord. 21775, Sept. 15, 2025)) · Lincoln Municipal Code § 24.05.060

Corpus is an independent public-information project, not the official City of Lincoln website. Stable reference: corpuslaw.us/code/41ced804-6539-448e-b0fd-c610cb51f009

24.05.060 Inspections.

(a) General. Upon completion of installation, alteration or repair of gas piping, and prior to the use thereof, the Administrative Authority shall be notified that gas piping is ready for inspection. (b) Accessibility for Inspection. Excavations required for the installation of underground piping shall be kept open until such time as the piping has been inspected and approved. If piping is covered or concealed before approval, it shall be exposed upon the direction of the Administrative Authority. (c) Required Inspections. The Administrative Authority shall make the following inspections and shall either approve that portion of the work as completed, or shall notify the permit holder wherein the same fails to comply with this chapter. (1) Rough piping inspection. This inspection shall be made after gas piping authorized by the permit has been installed and before such piping has been covered or concealed or a fixture or appliance has been attached thereto. This inspection shall include a determination that the gas piping size, material and installation meet the requirements of this section. (2) Final piping inspection. This inspection shall be made after piping authorized by the permit has been installed and after all portions thereof which are to be covered or concealed are so concealed and before fixtures, appliances or shutoff valves have been attached thereto. This inspection shall include an air, CO2 or nitrogen pressure test, at which time the gas piping shall stand a pressure of not less than 10-pounds-per-square-inch gauge or not less than one and one-half times the operating pressure or, at the discretion of the Administrative Authority, the piping and valves may be tested at a pressure of at least six inches mercury, measured with a manometer or slope gauge. Test pressures shall be held for a length of time satisfactory to the Administrative Authority but not less than fifteen minutes, with no perceptible drop in pressure. For welded piping, and for piping carrying gas at pressures exceeding fourteen inches water column pressure, the test pressure shall be at least sixty pounds per square inch and shall be continued for a length of time satisfactory to the Administrative Authority but not less than thirty minutes. These tests shall be made using air, CO2 or nitrogen pressure only and shall be made in the presence of the Administrative Authority. Necessary apparatus for conducting tests shall be furnished by the permit holder. (d) Other Inspections. In cases where the work authorized by the permit consists of a minor installation of additional piping to piping already connected to a gas meter or supply tank, the foregoing inspections may be waived at the discretion of the Administrative Authority. The Administrative Authority shall make such inspection as he deems advisable in order to assure that the work has been performed in accordance with the intent of this chapter.

(Ord. 16542 §6; January 24, 1994)

Ask a question about Lincoln law

Corpus searches the Lincoln sections it holds and shows the ones that match, with their citations. Free, no sign-in.