For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

41:17-4-3 — Exempt Projects

Code of the City of Newark, New Jersey (Newark City Code and Charter current through the 2026-09-23 codification (eCode360 publication NE4043, scraped 2026-11-17)) · Newark City Code § 41:17-4-3

Corpus is an independent public-information project, not the official City of Newark website. Stable reference: corpuslaw.us/code/bf348744-66b7-4fa2-831a-c7cce56b5f71

§ 41:17-4-3: Exempt Projects.

The following linear development projects are exempt from the groundwater recharge, stormwater runoff quantity, and stormwater runoff quality requirements of Sections 41:17-4-6 and 41:17 4-7: 1. The construction of an underground utility line provided that the disturbed areas are revegetated with native plant species upon completion; 2. The construction of an aboveground utility line provided that the existing conditions are maintained to the maximum extent practicable; and 3. The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of 14 feet, provided that the access is made of permeable material.

[Added 9-5-2024 by Ord. No. 6PSF-E , 09-05-2024 ]

Ask a question about Newark law

Corpus searches the Newark sections it holds and shows the ones that match, with their citations. Free, no sign-in.