41:17-4-6 — Erosion Control, Groundwater Recharge and Runoff Quantity Standards
Code of the City of Newark, New Jersey (Newark City Code and Charter current through the 2026-09-23 codification (eCode360 publication NE4043, scraped 2026-11-17)) · Newark City Code § 41:17-4-6
Corpus is an independent public-information project, not the official City of Newark website. Stable reference: corpuslaw.us/code/fce489bd-61de-437d-aa22-386cc734b92c
§ 41:17-4-6: Erosion Control, Groundwater Recharge and Runoff Quantity Standards.
1. This section contains minimum design and performance standards to control erosion, encourage and control infiltration and groundwater recharge, and control stormwater runoff quantity impacts of major development. a. The minimum design and performance standards for erosion control are those established under the Soil Erosion and Sediment Control Act, N.J.S.A. 4:24-39 et seq., as well as Title XXVIII of the Municipal Code, Soil Erosion and Sediment Control, and implementing rules. b. The minimum design and performance standards for groundwater recharge are as follows: i. The design engineer shall, using the assumptions and factors for stormwater runoff and groundwater recharge calculations in Section 41:17-5 Calculation of Stormwater Runoff and Groundwater Recharge for Major Development, use the demonstration approach below that results in a greater recharge volume performance standard: (1) Demonstrate through hydrologic and hydraulic analysis that the site and its stormwater management measures maintain 100% of the average annual pre-construction groundwater recharge volume for the site; or (2) Demonstrate through hydrologic and hydraulic analysis that the increase of stormwater runoff volume from pre-construction to post-construction for the two-year storm is infiltrated. ii. The following types of stormwater shall not be recharged: (1) Stormwater from areas of high pollutant loading. High pollutant loading areas are areas in industrial and commercial developments where solvents and/or petroleum products are loaded/unloaded, stored, or applied, areas where pesticides are loaded/unloaded or stored; areas where hazardous materials are expected to be present in greater than "reportable quantities" as defined by the United States Environmental Protection Agency (EPA) at 40 CFR 302.3 and listed in 40 CFR 302.4; areas where recharge would be inconsistent with NJDEP approved remedial action work plan or landfill closure plan and areas with high risks for spills of toxic materials, such as gas stations and vehicle maintenance facilities; and (2) Industrial stormwater exposed to "source material." "Source material" means any material(s) or machinery, located at an industrial facility, that is directly or indirectly related to process, manufacturing or other industrial activities, which could be a source of pollutants in any industrial stormwater discharge to groundwater. Source materials include, but are not limited to, raw materials; intermediate products; final products; waste materials; by-products; industrial machinery and fuels, and lubricants, solvents, and detergents that are related to process, manufacturing, or other industrial activities that are exposed to stormwater. iii. If stormwater recharge is desired and allowed, the following applies. The design engineer shall, using the assumptions and factors for stormwater runoff and groundwater recharge calculations at Section 41:17-5, either: (1) Demonstrate through hydrologic and hydraulic analysis that the site and its stormwater management measures maintain 100% of the average annual pre-construction groundwater recharge volume for the site; or (2) Demonstrate through hydrologic and hydraulic analysis that the increase of stormwater runoff volume from pre-construction to post-construction for the two-year storm is infiltrated. iv. The design engineer shall assess the hydraulic impact on the groundwater table and design the site so as to avoid adverse hydraulic impacts. Potential adverse hydraulic impacts include, but are not limited to, exacerbating a naturally or seasonally high water table so as to cause superficial ponding, flooding of basements, or interference with the proper operation of subsurface sewage disposal systems and other subsurface structures in the vicinity or down gradient of the groundwater recharge area. c. For major developments, in order to control stormwater runoff quantity impacts, the design engineer shall, using the assumptions and factors for stormwater runoff calculations at Section 41:17-5, complete one of the following: i. Demonstrate through hydrologic and hydraulic analysis that for stormwater leaving the site, post-construction runoff hydrographs for the two-, ten-, and 100-year storm events do not exceed, at any point in time, the preconstruction runoff hydrographs for the same storm events; ii. Demonstrate through hydrologic and hydraulic analysis that there is no increase, as compared to the pre-construction condition, in the peak runoff rates of stormwater leaving the site for the two-, ten-, and 100-year storm events and that the increased volume or change in timing of stormwater runoff will not increase flood damage at or downstream of the site. This analysis shall include the analysis of impacts of future phases of the development project. iii. Design of Stormwater Storage Facilities. (1) A minimum acceptable outlet pipe from all storage facilities shall be eight inches internal diameter, and be of material and class as approved by Title VII, the State Uniform Construction Code as adopted by the City. (2) In the case of detention facilities utilizing porous media for ground absorption, such as dry-wells, porous pavement, or the like, the volume of porous media shall be large enough to contain the total volume of rainfall excess, as required under subsection 41:17-3-1 of this Chapter, within the voids. Ground absorption systems shall be used only where the infiltration rate of the receiving soil is acceptable as determined by percolation tests and performed under the guidelines and standards of N.J.A.C. 7:9A et seq. (Environmental Protection), and soil borings, or as determined by the Director of Engineering and Director of Department of Water and Sewer. The applicant must demonstrate to the Director of Engineering and Director of Department of Water and Sewer, that the soil contains no contaminants that could leave the site by use of a detention facility where ground absorption occurs. Provisions shall be made to contain overflow of such systems on site or to surface drain the overflow in such a way as not to adversely affect any other property. (3) If detention facilities utilizing surface impoundment, such as detention basins or rooftop storage, are used, sufficient volume to fully contain the total volume of rainfall excess shall be provided. The outlets of such facilities shall be designed to limit the maximum discharge rate of stormwater runoff to what occurs at the site under existing conditions and shall discharge in such a way as not to adversely affect any other property. If rooftop storage is proposed, the weight of the impounded water on the roof shall be accounted for in the structural design of the building and the roof shall be designed to provide maximum protection against leakage. (4) If a combination of different stormwater detention techniques is used, the combined volume of the systems shall be large enough to fully contain the total volume of rainfall excess. (5) Stormwater detention facilities shall be maintained regularly by the owner to insure continual functioning of the systems at design capacity and to prevent the health hazards associated with debris buildup and stagnant water. In no case shall water be allowed to remain in any facility long enough to constitute a mosquito breeding, disease or any other type of health problem. (6) Stormwater conduits shall be designed with full flow velocities ranging from a minimum of 2.5 feet per second to a maximum of 10 feet per second. (7) All drainage and storage facilities shall be constructed to meet the requirements of the Director of Engineering and Director of Department of Water and Sewer. (8) All stormwater conduits must be connected to storm sewers or combined sewers wherever available, but in no case will stormwater conduits be connected to sanitary sewers. In the event that the municipal system is surcharged even after storage facilities are designed, the Director of Engineering and Director of Department of Water and Sewer shall direct the point of connection to the system or require such changes as are necessitated. d. For Non-major Developments: i. In order to accomplish the above objectives, the design of storm water drainage and storm water storage facilities may include (unless prohibited by subsection 41:17-4-6 paragraph 1biii), roof-top storage, oversized sewers with restricted outlet pipes, underground storage tanks, French drains, or where acceptable soil and groundwater conditions exist planted swale areas, recharge basins, dry wells, porous pavement, or any other innovative techniques, or a combination of the above as approved by the Director of Engineering. ii. Design of Stormwater Storage Facilities. (1) On-tract stormwater facilities shall be designed to contain the amount of stormwater runoff, which is equal to the maximum difference in runoff between pre-development conditions and post development conditions. (2) Either the rational method or the soil conservation service method as outlined in the Soil Conservation Service National Engineering Handbook., Hydrology, shall be used for computing the volume and rate of runoff from existing and post development conditions. (3) The amount of runoff shall be compiled using a design storm with a ten-year return frequency for Essex County (See Graph on file in Office of City Clerk). The minimum initial time of concentration shall be 10 minutes. (4) For computation with the rational method, published runoff coefficients which reflect land use and topography shall be used. Acceptable runoff coefficients currently in practice include, but are not limited to the following: Table 17-1 Land Use Types and Runoff Coefficients Land Use Type | Runoff Coefficients Business Central Business District | 0.70 to 0.95 Neighborhood areas | 0.50 to 0.70 Residential Single-family areas | 0.30 to 0.50 Multi-units, detached | 0.40 to 0.60 Multi-units, attached | 0.60 to 0.75 Apartment dwelling areas | 0.50 to 0.70 Industrial Light areas | 0.50 to 0.80 Heavy areas | 0.60 to 0.90 Parks, Cemeteries | 0.10 to 0.25 Playgrounds | 0.20 to 0.35 Railroad yard areas | 0.20 to 0.40 Unimproved areas | 0.10 to 0.30 SURFACE TYPE Streets Asphaltic | 0.70 to 0.95 Concrete | 0.80 to 0.95 Brick | 0.75 to 0.85 Drives and Walks | 0.75 to 0.85 Roofs | 0.75 to 0.85 Lawns; Sandy Soil Flat, 2% | 0.05 to 0.10 Average, 2 to 7% | 0.10 to 0.15 Steep, 7% | 0.15 to 0.20 Lawns; Heavy Soil Flat, 2% | 0.13 to 0.17 Average 2 to 7% | 0.18 to 0.22 Steep, 7% | 0.25 to 0.35 (5) A minimum acceptable outlet pipe from all storage facilities shall be eight inches internal diameter, and be of material and class as approved by Title vii, State Uniform Construction Code, as adopted by the City. (6) In the case of detention facilities utilizing porous media for ground absorption, such as dry-wells, porous pavement, or the like, the volume of porous media shall be large enough to contain the total volume of rainfall excess, as required within the voids. Ground absorption systems shall be used only where the infiltration rate of the receiving soil is acceptable as determined by percolation tests and performed under the guidelines and standards of N.J.A.C. 7:9A et seq. [Environmental Protection], and soil borings, or as determined by the Director of Engineering and Director of Department of Water and Sewer. Provisions shall be made to contain overflow of such systems on site or to surface drain the overflow in such a way as not to adversely affect any other property. (7) If detention facilities utilizing surface impoundment, such as detention basins or rooftop storage, are used, sufficient volume to fully contain the total volume of rainfall excess shall be provided. The outlets of such facilities shall be designed to limit the maximum discharge rate of stormwater runoff to what occurs at the site under existing conditions and shall discharge in such a way as not to adversely affect any other property. If rooftop storage is proposed, the weight of the impounded water on the roof shall be accounted for in the structural design of the building and the roof shall be designed to provide maximum protection against leakage. (8) If a combination of different stormwater detention techniques is used, the combined volume of the systems shall be large enough to fully contain the total volume of rainfall excess. (9) Stormwater detention facilities shall be maintained regularly by the owner to insure continual functioning of the systems at design capacity and to prevent the health hazards associated with debris buildup and stagnant water. In no case shall water be allowed to remain in any facility long enough to constitute a mosquito breeding, disease or any other type of health problem. (10) Stormwater conduits shall be designed with full flow velocities ranging from a minimum of 2.5 feet per second to a maximum of 10 feet per second. (11) All drainage and storage facilities shall be constructed to meet the requirements of the Director of Engineering and Director of Department of Water and Sewer. (12) All stormwater conduits must be connected to storm sewers or combined sewers wherever available, but in no case will stormwater conduits be connected to sanitary sewers. In the event that the municipal system is surcharged even after storage facilities are designed, the Director of Engineering and Director of Department of Water and Sewer shall direct the point of connection to the system or require such changes as are necessitated. iii. In tidal flood hazard areas, stormwater runoff quantity analysis shall only be applied if the increased volume of stormwater runoff could increase flood damages below the point of discharge.
[Added 9-5-2024 by Ord. No. 6PSF-E , 09-05-2024 ]