For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

41:17-5-1 — Calculation of Runoff

Code of the City of Newark, New Jersey (Newark City Code and Charter current through the 2026-09-23 codification (eCode360 publication NE4043, scraped 2026-11-17)) · Newark City Code § 41:17-5-1

Corpus is an independent public-information project, not the official City of Newark website. Stable reference: corpuslaw.us/code/de13bd2b-e30f-410b-8d58-cec29e115ede

§ 41:17-5-1: Calculation of Runoff.

Stormwater runoff shall be calculated in accordance with the following: 1. Design stormwater management measures so that the post-construction peak runoff rates for the two-, ten- and 100-year storm events are 50%, 75% and 80%, respectively, of the preconstruction peak runoff rates. The percentages apply only to the post-construction stormwater runoff that is attributable to the portion of the site on which the proposed development or project is to be constructed. The percentages shall not be applied to post- construction stormwater runoff into tidal flood hazard areas if the increased volume of stormwater runoff will not increase flood damages below the point of discharge. 2. Computation and Design Standards: a. The design engineer shall calculate runoff using the USDA Natural Resources Conservation Service (NRCS) methodology, including the NRCS Runoff Equation and Dimensionless Unit Hydrograph, as described in Chapters 7, 9, 10, 15, and 16, Part 630, Hydrology National Engineering Handbook, incorporated herein by reference as amended and supplemented. This methodology is additionally described in Technical Release 55 — Urban Hydrology for Small Watersheds (TR-55), dated June 1986, incorporated herein by reference, as amended and supplemented. Information regarding the methodology is available from the Natural Resources Conservation Service website at https://www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb1044171.pdf or at United States Department of Agriculture Natural Resources Conservation Service, 220 Davison Avenue, Somerset, New Jersey 08873. b. For the purpose of calculating curve numbers and groundwater recharge, there is a presumption that the pre-construction condition of a site or portion thereof is a wooded land use with good hydrologic condition. The term "curve number" applies to the NRCS methodology at N.J.A.C. 7:8-5.6(a)1i. c. In computing pre-construction stormwater runoff, the design engineer shall account for all significant land features and structures, such as ponds, wetlands, depressions, hedgerows, or culverts, that may reduce pre-construction stormwater runoff rates and volumes. d. In computing stormwater runoff from all design storms, the design engineer shall consider the relative stormwater runoff rates and/or volumes of pervious and impervious surfaces separately to accurately compute the rates and volume of stormwater runoff from the site. To calculate runoff from unconnected impervious cover, urban impervious area modifications as described in the NRCS Technical Release-55, Urban Hydrology for Small Watersheds or other methods may be employed. e. If the invert of the outlet structure of a stormwater management measure is below the flood hazard design flood elevation as defined at N.J.A.C. 7:13, the design engineer shall take into account the effects of tailwater in the design of structural stormwater management measures. f. For computation with the rational method for minor developments, published runoff co-efficient which reflects land use and topography shall be used. Acceptable runoff co-efficient currently in practice includes, but are not limited to the following: Land Use Type | Runoff Coefficients Business Central Business District | 0.70 to 0.95 Neighborhood areas | 0.50 to 0.70 Residential Single-family areas | 0.30 to 0.50 Multi-units, detached | 0.40 to 0.60 Multi-units, attached | 0.60 to 0.75 Apartment dwelling areas | 0.50 to 0.70 Industrial Light areas | 0.50 to 0.80 Heavy areas | 0.60 to 0.90 Parks, Cemeteries | 0.10 to 0.25 Playgrounds | 0.20 to 0.35 Railroad yard areas | 0.20 to 0.40 Unimproved Areas | 0.10 to 0.30 SURFACE TYPE Streets Asphaltic | 0.70 to 0.95 Concrete | 0.80 to 0.95 Brick | 0.75 to 0.85 Drives and Walks | 0.75 to 0.85 Roofs | 0.75 to 0.85 Lawns; Sandy Soil Flat, 2% | 0.05 to 0.10 Average, 2 to 7% | 0.10 to 0.15 Steep, 7% | 0.15 to 0.20 Lawns; Heavy Soil Flat, 2% | 0.13 to 0.17 Average 2 to 7% | 0.18 to 0.22 Steep, 7% | 0.25 to 0.35 g. The Rational Method for peak flow and the Modified Rational Method for hydrograph computations. The rational and modified rational methods are described in "Appendix A-9 Modified Rational Method" in the Standards for Soil Erosion and Sediment Control in New Jersey, as amended and supplemented. The document is available at http://www.nj.gov/agriculture/divisions/anr/pdf/2014NJSoilErosionControlStandar dsComplete.pdf. h. For the purpose of calculating runoff coefficients and groundwater recharge, there is a presumption that the pre-development condition of a site or portion thereof is a wooded land use with good hydrologic condition. The term "runoff coefficient" applies to both the NRCS methodology at N.J.A.C. 7:8-5.6(a)1i and the Rational and Modified Rational Methods at N.J.A.C. 7:8-5.6(a)1i. A runoff coefficient or a groundwater recharge land cover for an existing condition may be used on all or a portion of the site if the design engineer verifies that the hydrologic condition has existed on the site or portion of the site for at least five years without interruption prior to the time of application. If more than one land cover has existed on the site during the five years immediately prior to the time of application, the land cover with the lowest runoff potential shall be used for the computations. In addition, there is the presumption that the site is in good hydrologic condition (if the land use type is pasture, lawn, or park), with good cover (if the land use type is woods), or with good hydrologic condition and conservation treatment (if the land use type is cultivation). i. In computing pre-development stormwater runoff, the design engineer shall account for all significant land features and structures, such as ponds, wetlands, depressions, hedgerows, or culverts that may reduce pre-development stormwater runoff rates and volumes. j. In computing stormwater runoff from all design storms, the design engineer shall consider the relative stormwater runoff rates and/or volumes of pervious and impervious surfaces separately to accurately compute the rates and volume of stormwater runoff from the site. To calculate runoff from unconnected impervious cover, urban impervious area modifications as described in the NRCS Technical Release 55 — Urban Hydrology for Small Watersheds and other methods may be employed. k. If the invert of the outlet structure of a stormwater management measure is below the flood hazard design flood elevation as defined at N.J.A.C. 7:13, Flood Hazard Control Area Act Rules, the design engineer shall consider the effects of tailwater in the design of structural stormwater management measures.

[Added 9-5-2024 by Ord. No. 6PSF-E , 09-05-2024 ]

Ask a question about Newark law

Corpus searches the Newark sections it holds and shows the ones that match, with their citations. Free, no sign-in.