41:17-5-4 — Green Infrastructure Standards
Code of the City of Newark, New Jersey (Newark City Code and Charter current through the 2026-09-23 codification (eCode360 publication NE4043, scraped 2026-11-17)) · Newark City Code § 41:17-5-4
Corpus is an independent public-information project, not the official City of Newark website. Stable reference: corpuslaw.us/code/7b846caf-1384-4d07-8a92-330090a1b4ef
§ 41:17-5-4: Green Infrastructure Standards.
1. This section specifies the types of green infrastructure BMPs that may be used to satisfy the groundwater recharge, stormwater runoff quality, and stormwater runoff quality standards. 2. To satisfy the groundwater recharge and stormwater runoff quality standards at N.J.A.C. 7:8-5.4 and 5.5, the design engineer shall utilize green infrastructure BMPs identified in Table 5-1 in subsection 41:17-5-3 and/or alternative stormwater management measure approved in accordance with N.J.A.C. 7:8-5.2(g). The following green infrastructure BMPs are subject to the following maximum contributory drainage area limitations: Best Management Practice | Maximum Contributory Drainage Area Dry Well | 1 acre Manufactured Treatment Device | 2.5 acres Pervious Paving Systems | Area of additional inflow cannot exceed 3 times the area occupied by the BMP Small-scale Bioretention Systems | 2.5 acres Small-scale Infiltration Basin | 2.5 acres Small-scale Sand Filter | 2.5 acres 3. To satisfy the stormwater runoff quantity standards at N.J.A.C. 7:8-5.6, the design engineer shall utilize BMPs from Table 5-1 or Table 5-2 and/or an alternative stromwater management measure approved in accordance with N.J.A.C. 7:8-5.2(g). 4. If a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with N.J.A.C. 7:8-5.2(e) is granted from the requirements of this section, then BMPs from Table 5-1, 5-2, or 5-3, and/or an alternative stromwater management measure approved in accordance with N.J.A.C. 7:8-5.2(g) may be used to meet the groundwater recharge, stormwater runoff quality, and stormwater runoff quality standards at N.J.A.C. 7:8-5.4, 5.5, and 5.6. 5. For separate or combined storm sewer improvement projects, such as sewer separation, undertaken by a government agency or public utility (for example, a sewerage company), the requirements of this section shall only apply to areas owned in fee simple by the government agency or utility, and areas within a right-of-way or easement held or controlled by the government agency or utility; the entity shall not be required to obtain additional property or property rights to fully satisfy the requirements of this section. Regardless of the amount of area of a separate or combined storm sewer improvement project subject to the green infrastructure requirements of this section, each project shall fully comply with the applicable groundwater recharge, stormwater runoff quality control, and stormwater runoff quantity standards at N.J.A.C. 7:8-5.4, 5.5, and 5.6, unless the project is granted a waiver from strict compliance in accordance with N.J.A.C. 7:8-5.2(e).
[Added 9-5-2024 by Ord. No. 6PSF-E , 09-05-2024 ]
Ask a question about Newark law
Corpus searches the Newark sections it holds and shows the ones that match, with their citations. Free, no sign-in.