§ 350-16 — Storm drainage systems

Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 350-16

Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/adfe8830-55da-4e39-9f00-27a5ae2bb109

§ 350-16: Storm drainage systems.

A. Purposes. Storm drainage systems shall be provided in order to: (1) Meet the requirements of Chapter 538, Stormwater Management. (2) Permit unimpeded flow of natural watercourses as modified by stormwater control measures or open channels as provided for herein. (3) Ensure adequate drainage of all low points along the line of streets. (4) Intercept stormwater runoff along streets at intervals related to the extent and grade of the area drained. (5) Provide positive drainage away from on-site sanitary sewage disposal systems. (6) Take surface water away from the bottom of vertical grades, lead water from springs and avoid excessive use of cross gutters at street intersections and elsewhere. (7) Provide that the peak runoff rate at all points of discharge from the site, when developed, will not exceed the peak runoff rate at each of those points prior to development for a one-, five-, ten-, twenty-five-, fifty- and 100-year storm. In cases where a proposed land development cannot accommodate a detention facility, or if a detention facility is not feasible in the opinion of the City Engineer, the developer shall pay a prorated fee to the City for stormwater management in lieu of actual on-site detention. (8) Encourage the voluntary installation of stormwater control measures, including rain gardens, bioswales, permeable pavements, green roofs, and other green infrastructure in furtherance of the City's Stormwater Fee Credit Program. B. General requirements. (1) A site drainage plan for the proposed development tract shall be prepared which illustrates the following information: (a) Mapping of the watershed area or areas including existing and proposed development is located. (b) Calculations of runoff before and after development for all points of runoff concentration. (c) Complete drainage systems for the development. All existing drainage features which are to be incorporated in the design shall be so identified. If the development is to occur in stages, a general drainage plan for the entire development shall be presented with the first stage and appropriate development stages for the drainage system shall be indicated. (2) The existing points of natural drainage discharge onto adjacent property shall not be altered without the written approval of the affected landowners. (3) No stormwater runoff or natural drainage shall be so diverted as to overload existing drainage systems, or create flooding or the need for additional drainage structures on other private properties or public lands, without approved provisions being made by the developer for properly handling such conditions. (4) Storm drainage facilities shall be designed to convey through the land development the peak runoff that will ultimately occur from the watershed. The calculation of this runoff shall take into account the potential land use and development including runoff controls in effect in a tributary area. (5) Where a development is traversed by a watercourse, there shall be provided a drainage easement conforming substantially with the line of such watercourse, and of such width as will be adequate to provide for unimpeded flow of storm runoff based on calculations made in conformance with standards promulgated in this chapter and to provide a freeboard allowance of 1/2 foot above the design surface water level. The terms of the easement shall prohibit excavation, the placing of fill or structures, and any alterations which may adversely affect the flow of stormwater within any portion of the easement. Also, periodic cutting of vegetation and maintenance in all portions of the easement shall be required. (6) Drainage facilities that are located on state highway rights-of-way shall be approved by the Pennsylvania Department of Transportation and a letter indicating such approval shall be directed to the City Engineer. (7) All streets shall be so designed as to provide for the discharge of surface water away from their center line. The slope of the crown on proposed streets shall conform to City standards. (8) Where it is deemed necessary in the opinion of the City Engineer to prevent increased runoff from a property to be developed, on-site stormwater control measures shall be provided. The design of such facilities shall be attached to the plan and submitted to the City Engineer for review and approval. Such facilities shall be owned, operated, and maintained by the owner. (9) When it can be shown to the satisfaction of the City Engineer that, due to topographic conditions, natural drainage swales on the site cannot adequately provide for drainage, open channels may be constructed conforming substantially to the line and grade of such natural drainage swales. Capacities of open channels shall be calculated using the Manning equation or other acceptable engineering equation as approved by the City Engineer. (10) Storm drainage facilities and appurtenances shall be so designed and provided as to minimize erosion in watercourse channels and at all points of discharge. (11) Inlets shall be spaced to collect design flows from the catchment areas allowing 10% maximum bypass. In no instance shall inlet spacing be greater than 400 feet. C. Stormwater control measures. The following design notes and provisions shall be adhered to on all stormwater plans: (1) A letter from the Lehigh County Conservation District stating approval of the facility is to be received by the City, when required. (2) A subsurface soils investigation is to be done, with special emphasis on identifying sinkholes. (3) The depth of the water table in the area of the stormwater control measures shall be noted. (4) All earth fill shall be free from brush, roots and other organic material. (5) Minimum top width of embankment shall be eight feet. (6) The bottom of the pond is to be sloped towards the outlet structure. (7) Riprap is to be installed below all inflow and outflow pipes to minimize erosion. (8) There is to be reinforcement steel in all concrete structures. (9) A concrete cradle is to be provided for the outlet pipe. (10) All construction joints are to be watertight. (11) An impervious central core is to be constructed in the embankment to be made of a compacted clay material. (12) The cutoff trench in the embankment is to be excavated to impervious subsoil or bedrock. (13) The contractor shall maintain the detention basin to design dimensions throughout construction, unless pond is to be used as a siltation basin during development of the site. If the pond is to be used as a siltation basin, it shall be returned to design dimensions following the completion of construction. (14) Maintenance of the stormwater control measures shall be made part of the land development agreement between the developer and the City. (15) Detail and section shall be provided for the outlet risers on the stormwater control measures. Sectional view is also required for the spillway. (16) Design calculations for the stormwater control measures shall be submitted to the City Engineer's office. (17) The developer shall demonstrate that such stormwater control measures are designed, protected and located to assure that public safety is maximized and health problems are prevented. All protective devices shall be adequately screened either by landscaping or another alternative method acceptable to the City Engineer. (18) Overflow shall be controlled to prevent property damage. D. Calculations of runoff and design storm frequency. (1) Storm drainage facilities required by this chapter shall be designed to provide protection from a ten- to 100-year storm as determined by the City Engineer. A ten-year design storm would be appropriate where a storm in excess of the design storm would have minor impact such as inconvenience to traffic on local streets. A 100-year design storm would be appropriate where a storm in excess of the design storm would cause damage to existing or future structures or their contents. Stormwater control measures shall be designed for a twenty-five- to 100-year storm as determined by the City Engineer to store all increased flows generated from development for storms of one-, five-, ten-, twenty-five-, fifty-, and 100-year frequency as determined by the City Engineer. Outlet structures shall address the staged release of predevelopment outflows for each storm aforementioned. (2) Stormwater runoff from watersheds of 200 or less acres shall be calculated by rational method as described in Manual Number 37 of the American Society of Civil Engineers. (3) Rainfall intensity duration frequency shall be used as developed by Lehigh Valley Planning Commission (LVPC). (4) Stormwater runoff from watersheds of more than 200 acres shall be calculated using soil cover complex method developed by the Natural Resources Conservation Service or other appropriate method acceptable to the City Engineer. (5) Complete detailed drainage and stormwater control measure design calculations shall be submitted to the City Engineer, certified by a registered professional engineer. (6) All storm drainage calculations shall use equations, coefficients and other engineering data contained in storm drainage runoff calculation standards of the City Engineer's office. E. Improvement specifications for storm drainage systems. (1) Storm drainage systems shall be installed in accordance with the design standards and requirements set forth in this § 350-16 and standard City specifications. (2) In streets, inlets shall normally be located along the curbline and at the end of the curb radius points. For the purpose of inlet location at corners, the depth of flow shall be considered for each gutter. At intersections, the depth of flow across through streets shall not exceed one inch. The Manning Equation shall be used to calculate the capacities of gutters. Inlets shall be depressed two inches below the grade of the gutter or ground surface. Manholes may be substituted for inlets at locations where inlets are not required to handle surface runoff. (3) Storm sewers shall be required to have a minimum diameter of 15 inches and shall be made of reinforced concrete unless otherwise noted by the City Engineer. Sewers shall be installed in sufficient slopes to provide a minimum velocity of three feet and a maximum of 15 feet per second. Where outlet velocities exceed five feet per second, approved energy dissipaters and/or outlet protection shall be designed and installed. (4) Materials and construction requirements shall meet specifications and procedures acceptable to the City Engineer.

Ask a question about Allentown law

Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.