§ 350-17 — Sanitary sewage facilities
Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 350-17
Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/e846e97d-e5db-4a21-95a1-92c67411e367
§ 350-17: Sanitary sewage facilities.
A. General requirements. (1) The developer must install sanitary sewer facilities in a manner prescribed by City construction standards and specifications. All plans must be designed in accordance with the rules, regulations, and standards of the City Engineer, PA-DEP (Domestic Wastewater Facilities Manual), and other appropriate agencies. The developer is responsible for preparing all applications required for obtaining PA-DEP permits and for paying all required fees. (2) The applicant proposing to build a pumping station or any other sewage conveyance or ultimate disposal facility must comply with the requirements of 25 Pa. Code § 71.72, Sewage management programs for sewage facilities and community onlot sewage systems. (3) Each property must be provided with its own separate sanitary sewer lateral connected to a minimum eight-inch diameter public sewer main. When available, the developer must utilize existing sanitary wyes for new sanitary lateral tie-ins. (4) Prior to final acceptance of any new public or private sanitary sewer line extension, service, or repair, lines must be adequately cleaned, inspected, and tested, per City specifications. B. Individual disposal systems. (1) If public sewer facilities are not available and individual disposal systems are proposed, minimum lot areas must comply with the requirements of Chapter 660, Zoning, and percolation tests and test holes must be made as directed by the Sewage Enforcement Officer. The individual disposal system, including the size of the septic tanks and size of the tile fields or other secondary treatment device, must also be approved by the Sewage Enforcement Officer. (2) On-lot sewage disposal facilities must comply with the provisions of PA-DEP Chapters 71 and 73, Administration of Sewage Facilities Program, Pennsylvania Sewage Facilities Act, No 537.A planning module for on-lot sewage disposal must be submitted to PA-DEP. The proposed facilities must be deemed satisfactory by the City Health Department and a permit for on-lot disposal system is required. A City Health Department "letter of suitability" for on-site disposal must be received by the City with the preliminary plan for each lot proposed. If the proposed subdivision or land development contains an existing on-site sewage disposal facility on the property to be further subdivided or a more intensive use of development is proposed, the developer must submit acknowledgment from the City Health Department indicating that the existing system is functioning properly. If the existing system is inadequate, a new system must be provided by the developer. Each new property that is created that requires an on-lot sewage disposal facility must have an on-lot system instruction manual provided to the new owners of the property. C. Tapping fee. Each developed lot/property is subject to a sanitary sewer tapping fee (sanitary sewer system capacity fee) in accordance with City Ord. No. 14522. Note: Any increased change in density or usage on a given property will require an updated tapping fee.
Ask a question about Allentown law
Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.
