§ 350-23 — Transportation impacts
Code of the City of Allentown, Pennsylvania (code date 2026-10-07) · Allentown Code § 350-23
Corpus is an independent public-information project, not the official City of Allentown website. Stable reference: corpuslaw.us/code/f7a469d5-7a3b-470d-8285-5905910d5ca9
§ 350-23: Transportation impacts.
A. Warrants. (1) Transportation impact study. (a) A transportation impact study (TIS) is an analysis to determine the full impact of a proposed development on the transportation system. (b) A TIS is required for a proposed development that meets any of the following criteria: [1] During any one-hour time period of any day of the week, the development is expected to generate 100 or more vehicle trips entering the development or 100 or more vehicle trips exiting the development; [2] For existing sites being redeveloped the site is expected to generate 100 or more additional trips entering or exiting the development during any one-hour time period of any day of the week; or [3] In the opinion of the City Engineer, the development or redevelopment is likely to have significant impacts on traffic safety or traffic flow, even if the warrant criteria in Subsection A(1)(b)[1] or [2], above are not met. (c) Transportation impact studies must be conducted under the supervision of a Pennsylvania registered professional engineer. (2) Transportation impact assessment. (a) A transportation impact assessment (TIA) is a limited evaluation to determine transportation impacts of a proposed development at specific intersections, driveways, or locations. (b) A TIA is required for a proposed development that, in the opinion of the City Engineer, is likely to have moderate impacts on traffic safety or traffic flow at specific intersections, driveways, or locations. (c) Transportation impact assessments must be conducted under the supervision of a Pennsylvania registered professional engineer. (3) PennDOT. The Pennsylvania Department of Transportation (PennDOT) may require a traffic impact study (TIS) or transportation impact assessment (TIA) based on state guidelines and criteria involving state-owned roadways impacted by the proposal. B. Scoping. Before conducting the TIS or TIA, the consultant must prepare trip generation estimates, provide design vehicle data and confer with the City Engineer to determine the scope of the study or assessment. C. Study or assessment requirements. Traffic impact studies and traffic impact assessments must be prepared in accordance with the Institute of Transportation Engineer's (ITE) Traffic Engineering Handbook and ITE's Transportation Impact Analyses for Site Development and PENNDOT Publications 212 and 282 and include the following information, provided that the City Engineer is authorized to waive individual study requirements or supplement this list of required information based on surrounding transportation conditions or the specific characteristics of a development, or development site: (1) Description of the proposed project in terms of land use type and magnitude. (2) An inventory of existing conditions in the site environs (one-half to one-mile radius). (3) Roadway network and traffic control. (4) Existing traffic volumes in terms of peak hours and average daily traffic. (5) Planned roadway improvements (by others). (6) Intersection levels of service. (7) Roadway levels of service (where appropriate). (8) Other measures of roadway adequacy (i.e., lane widths, traffic signal warrants, vehicle delay studies, etc.). (9) An analysis of existing traffic conditions, including: (a) Intersection levels of service; (b) Roadway levels of service (where appropriate); and (c) Other measures of roadway adequacy (i.e., lane widths, traffic signal warrants, vehicle delay studies, etc.). (10) Projected site-generated traffic volumes in terms of: (a) Peak-hour (PHT) and average daily traffic (ADT); (b) Approach/departure distribution including method of determination; (c) Site traffic volumes on roadways; and (d) Comparison of existing zoning to proposed site generation. (11) An analysis of future traffic conditions including: (a) Future design year (development fully completed) combined volumes (site traffic plus future roadway traffic); (b) Intersection levels of service; (c) Roadway levels of service (where appropriate); and (d) Other measures of roadway adequacy (i.e., lane widths, traffic signals warrants, vehicle delay studies, etc.). (12) A description of the recommended access plan and necessary improvements, including: (a) Schematic plan of access and on-site circulation; and (b) General description of off-site improvements required. D. Third-party reviews. When the City determines that competent and expeditious review of a TIS or TIA requires review by a third-party consultant, the applicant is responsible for reasonable fees associated with such third-party consultants. E. Responsibility for improvements. (1) When the TIS or TIA indicates that the proposed development will result in traffic impacts necessitating improvements to existing streets and intersections the applicant may be required to install necessary improvements. Such needed improvements are limited to those attributable to the proposed development (rather than those that remedy deficiencies in existence before the new development) in order to: (a) Assure adequate, safe and convenient access to each lot and structure and parking compound proposed as part of the development of the subject tract; (b) Accommodate the traffic for the proposed development; (c) Provide for an acceptable level of service and delay for the design year, or years for phased projects, with the development which is at least equivalent to the projected level of service and delay for the design year(s) without the proposed subdivision or development; and (d) Preserve the existing convenience of access to or ability to exit from abutting lots that gain access from the existing street. (2) If the City determines that some or all of the required improvements or some or all of any agreed upon off-site improvements are not feasible or appropriate at the present time, the applicant may be required to enter into agreement with the City and deposit financial security with the City until such time that the improvements are satisfactorily installed by the applicant and accepted by the City.
Ask a question about Allentown law
Corpus searches the Allentown sections it holds and shows the ones that match, with their citations. Free, no sign-in.
