§ 22.5-27 — Stormwater pipes
Code of Ordinances, City of Knoxville, Tennessee (Supplement 81; codified through Ordinance O-51-2026, June 23, 2026; online September 9, 2026; later unincorporated ordinances excluded) · Knoxville Code of Ordinances § 22.5-27
Corpus is an independent public-information project, not the official City of Knoxville website. Stable reference: corpuslaw.us/code/8ec195f9-a9e4-48ea-823b-41d590435919
Sec. 22.5-27. - Stormwater pipes.
(a) Stormwater pipes within the roadway prism of city streets, private rights-of-way, and joint permanent easements (JPEs) shall be reinforced concrete pipe (RCP). (b) Driveway pipes shall be RCP. However, high-density polyethylene pipe (HDPE), corrugated dual-walled polyvinyl chloride pipe (DWPVC), dual-walled polypropylene pipe (PPP), or corrugated metal pipe (CMP) may be used for single family and duplex development where: (1) A pipe only conveys water under non-heavily traveled driveways; (2) A pipe is located outside of the roadway prism; and (3) The installation would not cause flooding of adjacent properties or rights-of-way in the event of pipe failure. (c) RCP is required for all stormwater systems located within new residential developments (including residential condominium developments). (d) RCP, HDPE, DWPVC, and PPP may be used to convey stormwater generated on the particular property (on-site drainage). (e) Any pipe, culvert, or drainage system dedicated to the city, or installed with the intent of dedication to the city, whether inside or outside the right-of-way, shall be constructed of RCP. (f) RCP is required for all stormwater pipes and culverts that carry water generated on adjacent properties or areas (off-site water). In the case of common non-residential developments, pipe materials listed in subsection 22.5-27(d) may be used. (g) RCP is required if the failure of the pipe would cause flooding or potential property damage on adjacent properties. (h) RCP is required for all stormwater basin outlet structures and for all stormwater outlet pipes that drain through the berm of a stormwater basin continuing to its terminus or the connection to a downstream system. Stormwater facilities that do not have a berm associated with their construction may use HDPE for the pipe material downstream of the outlet structure provided that in the event of a failure of the pipe, no offsite properties will be adversely affected. (i) Ductile iron (DI) is an acceptable alternative pipe material for RCP. (j) Pipes shall be designed for the proposed loading conditions. (k) The director may approve the use of alternative pipe materials in overlapping rights-of-way or easements to accommodate special conditions presented by railroads, pipelines, utilities, unique facilities, or other sensitive areas.
(Ord. No. O-145-2025, § 1, 11-25-25)
Ask a question about Knoxville law
Corpus searches the Knoxville sections it holds and shows the ones that match, with their citations. Free, no sign-in.