§ 22.5-30 — Attenuation

Code of Ordinances, City of Knoxville, Tennessee (Supplement 81; codified through Ordinance O-51-2026, June 23, 2026; online September 9, 2026; later unincorporated ordinances excluded) · Knoxville Code of Ordinances § 22.5-30

Corpus is an independent public-information project, not the official City of Knoxville website. Stable reference: corpuslaw.us/code/baf66ea9-22b0-4d7f-9813-fc96f853d2fb

Sec. 22.5-30. - Attenuation.

(a) The requirement for attenuation shall apply to the following: (1) Road construction exceeding one-half (½) acre of impervious area; (2) Developments of one (1) acre or more of disturbed area; (3) Developments of five (5) lots or more; (4) Site development which contains one-half (½) acre or more of impervious area added since June 1997; and (5) Substantial investment projects in areas containing one-half (½) acre or more impervious area. For substantial investment projects, the following conditions apply: a. Attenuation is required for the entire developed site as compared to the pre-1997 conditions, not just the portion of the site being redeveloped. b. The requirement for attenuation may be waived if the adjacent downstream system is examined and found to be adequate to carry the 10-year frequency storm. c. If examination of the adjacent downstream system finds inadequate conveyance for the 10-year frequency storm, the director has authority to condition the approval of a permit upon compliance with additional requirements, including but not limited to attenuation, installation or modification of the stormwater system, or other stormwater control measures designed to reduce the adverse impact of the proposed development. (b) The director has authority to waive the requirement for attenuation if provided with hydrologic and hydraulic computations demonstrating that such a waiver would result in a lesser impact to the city's stormwater system than providing attenuation. (c) Where the development's stormwater discharges directly into a main stream, attenuation is not required unless deemed necessary by the department of engineering. (d) Exclusions from attenuation do not exempt the developer from water quality requirements. (e) Stormwater facilities providing attenuation or water quality treatment for multiple lots shall be located as follows: (1) Residential: On two (2) or more buildable lots or in a common area with a legally established property owners' organization with responsibility for maintenance and repair of the stormwater facility. (2) Non-residential: On one (1) or more buildable lots or in a common area with a legally established property owners' organization with responsibility for maintenance and repair of the stormwater facility.

(Ord. No. O-145-2025, § 1, 11-25-25)