Sec. 22.5-38. - Performance and indemnity agreement.

(a) In order to ensure that any site development complies with the requirements of this chapter, the director shall have the authority to require a performance and indemnity agreement, together with a letter of credit, a cashier's check, or a surety bond from an approved financial institution or insurance carrier which guarantees satisfactory completion of the project and names the city as beneficiary. The security shall be provided by the property owner in a form and in an amount to be determined by the engineering department based on submission of plans and actual construction or potential remediation expenses. (b) Before any residential lot(s) in a platted subdivision may be transferred, either: (1) The engineer of record must sign and seal a letter stating that all supporting stormwater and street infrastructure and grading has been completed for the subject lot(s); or (2) The development certification may be submitted to and approved by the engineering department. (3) Failure to comply with this requirement may result in any combination the following: a. Revocation of the surety bond, cashier's check, or letter of credit thereby revoking the ability to obtain permits; b. Cancellation of permits on properties; and c. Implementation of all available legal remedies. (c) A performance and indemnity agreement must be provided as follows: (1) Prior to the issuance of a permit when: a. There is a potential for runoff to adversely impact public rights-of-way or other property; b. A site drains into a sinkhole; c. The site is used for a borrow pit; d. A stormwater facility is required; e. There is construction of a public street, private right-of-way, or joint permanent easement; or f. There are other critical, site-related features. (2) The performance and indemnity agreement shall be guaranteed in the form of a cashier's check, a letter of credit, or a surety bond. (3) The amount is based on a remediation and completion estimate as determined by the engineering department, with a minimum amount of ten thousand dollars ($10,000.00). (d) The director may refuse brokers or financial institutions the right to provide a surety bond, cashier's check, or letter of credit based on past performance, ratings of the financial institution, or other appropriate sources of reference information. (e) Prior to the release or reduction of a bond, a development certification must be completed. (1) The development certification shall show that the as-built field conditions have been field verified and comply with the approved plans. (2) The development certification must be stamped by the appropriate design professional required to stamp the original site development permit as stated in subsection 22.5-25(b)(4). A registered land surveyor licensed to practice in the state must also stamp certifications that include a survey drawing.

(Ord. No. O-145-2025, § 1, 11-25-25)