Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Stormwater Pollution Control Chapter, § 4.02
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/2c681452-aaad-40a3-805e-c05724eeaba5
Section 4.02 General Requirements
A. The goal for erosion and sediment control at sites disturbed by construction is achievement of at least the minimum site rating of 0.70 using the site rating system and the implementation of the design standards specified in the Integrated Stormwater Management (iSWM) Design Manual for Construction, North Central Texas Council of Governments, Arlington, Texas, December 2003 or adopted revisions and compliance with the City of Arlington Design Criteria Manual. B. The best management practices used at construction sites may include, but not be limited to, the following measures: 1. Ensuring that existing vegetation is preserved by minimizing the disturbance of areas (using temporary fencing to protect areas if necessary) adjacent to construction areas by equipment parking or material storage. 2. Stabilization of disturbed areas must, at a minimum, be initiated immediately whenever any clearing, grading, excavating, or other earth disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 calendar days. Temporary stabilization must be completed no more than 14 calendar days after initiation of soil stabilization measures, and final stabilization must be achieved prior to termination of permit coverage. 3. Use of structural practices to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from the site to the extent feasible; 4. Minimization of the tracking of sediments off-site by vehicles, the generation of dust, and the escape of other windblown waste from the site; 5. Prevention of the discharge of building materials, including cement, lime, concrete, asphalt and mortar, to the MS4 or surface water in the State; 6. Measures to prevent and contain spills of paints, solvents, fuels, septic waste, and other hazardous chemicals and pollutants associated with 4.02 construction, and to assure proper cleanup and disposal of any such spills in compliance with state, federal, and local requirements; 7. Implementation of proper waste disposal and waste management techniques, including covering waste materials, minimizing ground contact with hazardous chemicals and trash, and installing and maintaining covered receptacles for rubbish and garbage to assure that such waste materials are not blown or carried by rainfall runoff from the site; 8. Timely maintenance of vegetation, erosion and sediment control measures, and other best management practices to maintain them in good and effective operating condition; and 9. Installation of structural measures during the construction process to control pollutants in stormwater discharges that will occur after construction operations have been completed. Structural measures should be placed on upland soils to the degree attainable. Such installed structural measures may include, but not be limited to, the following: stormwater detention structures (including wet ponds); stormwater retention structures; flow attenuation by use of open vegetative swales and natural depressions; other velocity dissipation devices; infiltration of runoff on site; and sequential systems which combine several practices. Operators of construction sites are only responsible for the installation and maintenance of stormwater management measures prior to final stabilization of the site, and are not responsible for maintenance after stormwater discharges associated with construction activity have terminated. 10. Stockpiled fill (in one contiguous pile or in separate piles) in excess of 40 cubic yards or 2,000 square feet is considered construction activity and a relevant permit must be obtained prior to dumping fill. All stockpiles must be protected by sediment and erosion control best management practices (BMPs). All BMPs must be maintained until the stockpile is stabilized or removed. C. Qualified personnel (provided by the operator of the construction site) shall conduct inspections, perform maintenance of controls, and maintain documentation for disturbed areas of any construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site, at least once every seven days or at least once every fourteen calendar days and within 24 hours of the end of a storm that is 0.5 inches or greater. All erosion and sediment control measures and other identified best management practices shall be observed in order to ensure that they are operating 4.02 correctly and are effective in preventing significant impacts to receiving waters and the MS4. Based on the results of the inspection, best management practices shall be modified as appropriate, and as soon as is practicable.
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.