§ 4.05 — Post-Construction Requirements
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Stormwater Pollution Control Chapter, § 4.05
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/f550b4bf-a7dc-49cf-84c5-bea77515f505
Section 4.05 Post-Construction Requirements
A. The primary operator shall ensure all temporary control measures for erosion control or other BMPs are removed once final stabilization has been achieved. B. The owner must ensure all long-term operation and maintenance of post-construction stormwater runoff control mechanisms, such as detention and retention basins, dry wells, and other measures unless otherwise specified by the City of Arlington. C. The City will not be responsible for the design, development, construction, operation or maintenance or use of the improvements to be developed and constructed by Developer. D. Developer or its successor will develop, construct, operate and maintain the improvements in conformity with any and all applicable federal, state and municipal laws and ordinances, and the provisions contained herein. Maintenance may be performed by an association (including homeowners associations), but the responsibility for maintenance is the legal obligation of both the association and the individual property owners E. Developer, or its successor to the obligation of any maintenance agreement, including a homeowner’s association, will jointly and severally operate and maintain the improvements in accordance with the accepted as-built plans, the Stormwater Management Site Plan, applicable City guidance and requirements. This responsibility will include, but is not limited to, the following: 1. Frequent mowing in accordance with City Ordinances, routine and necessary maintenance of the improvements and drainage easement. 2. Periodic removal of debris and sediments from the feature and drainage areas. 4.05 3. The feature and drainage area cross sections will be maintained to the designed slope, grade, and contour, including any concrete structures. 4. Areas of erosion will be repaired. Soil materials used in repairs will be of consistent and compatible characteristics with the surrounding materials and shall be compacted to a density equaling that of the undisturbed surrounding material. 5. General maintenance and operation in accordance with CITY guidance and requirements, standard practices, the most recent Site Development Controls Chapter of the iSWM Technical Manual as published by the North Central Texas Council of Governments, and any applicable manufacturers’ instructions. F. Developer, or its successor, will correct the condition of the improvements or any maintenance deficiencies regarding the improvements, including any damages incurred as a result of the deficiencies at Developer’s or its successor’s expense within thirty (30) days from date of inspection or from date of written notice from the CITY. G. Developer or its successors shall compensate the CITY for any costs to maintain or repair the BMP and associated improvements if Developer or its successor fail to maintain and/or repair post construction BMP deficiencies. H. Developer or its successors shall not seek compensation from the CITY for loss of the value of the improvements made hereunder when such improvements are required to be discontinued, removed or corrected. I. Developer or its successors shall be responsible for ensuring that CITY guidance is followed for inspection of BMP elements and for maintenance activities.
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.