§ 4.03 — Disturbances of Less than One Acre

Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Stormwater Pollution Control Chapter, § 4.03

Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/14b42dab-ce28-44ac-bb11-e329470fe57c

Section 4.03 Disturbances of Less than One Acre

A. The requirements of this Section 4.03 shall not apply to any of the following activities: 1. Any construction activity that results in the disturbance of one or more acres of total land area, or that is part of a common plan of development or sale within which one or more acres of total land area are disturbed, and any other construction activity for which an NPDES or TPDES permit is required for stormwater discharges associated with that construction activity. (In such circumstances, the requirements of Section 4.04 apply in lieu of this Section.) 2. Any linear public construction project disturbing less than one acre that is administered, performed, contracted, or funded (in whole or in part) by the City. 3. Repair or installation of a parking lot to be replaced with the same footprint and does not infringe upon the City or State’s Right of Way (ROW). 4. Any construction incident to repair or maintenance of a utility line (such as for telecommunications, electricity, water, sewer, and natural gas). Construction incident to the laying of new utility lines or replacement of existing lines is not exempted from Section 4.03 by this paragraph. 5. Interior alteration of an existing building when the alteration does not increase the square footage, area, or height of the building. 6. Construction of a fence, but no exemption is granted by this subparagraph for construction of a retaining wall or a fence that may significantly obstruct or change the direction of flow of water. 7. Any construction activity that the Director or his/her authorized representative expressly finds not to cause, or threaten to cause, any discharge of any harmful quantity of any material associated with construction activity into the MS4 or any other water in the state. 4.03 B. Unless within one or more of the exceptions specified in Section 4.03(A) above, all operators of sites of construction activity, including demolition, clearing, grading, excavation, and landfilling activities, shall prepare and submit the following documents to the Director at least fifteen calendar days prior to the commencement of construction activities (unless, pursuant to Section 4.03(C) below, the Director expressly allows construction to be commenced within a shorter period of time following the document submittal): 1. An identifying notice on a form approved by the Director and to be posted at the site entrance containing the following information: a. The name, address, and telephone number of each operator of the construction activity; b. The name, address, and telephone number of each owner of the construction site; c. The location of the construction site, by street address and legal description; and d. A description of the nature of the construction project. 2. Plans and specifications illustrating and describing the best management practices required by Section 4.02(A) above that will be implemented at the construction site. Such plans and specifications shall be prepared, signed, and sealed by a Licensed Professional Engineer or other professional, approved by the Director, certified in a discipline that includes erosion and sediment control principals appropriate for the site, except in instances of land clearing or landfilling disturbing less than 12,000 square feet of land without any existing plans or present intention of erecting a building or other structure on the site. Final plans or other documents that will be archived must be submitted in an electronic format specified by the Director of Planning and Development Services ("PDS Director") as a condition to issuance of any type of permit, approval, or other action related to the final plans or documents. The City may provide an electronic conversion service for a fee in the amount set forth by City Council resolution. The PDS Director shall provide a schedule indicating which documents must be provided electronically, at which point during the approval process, and other information as necessary to implement an electronic archiving program. C. The Director or his/her designee may allow construction to be commenced within fewer than fifteen calendar days following submittal of the documents required by Section 4.03(B) above if he/she expressly determines that: 4.03 1. The required identifying notice and management plans and specifications are complete and satisfactory; and 2. The Director has been afforded adequate time and opportunity to review the management plans and specifications; and 3. The management practices described in the plans and observed upon any site inspection conducted are adequate to control and reduce the discharge of sediment, silt, earth, soil, and other materials associated with construction activities to the maximum extent practicable. D. If, upon the Director's review of the management plans and specifications required by Section 4.03(B) above (or any modified plans required by Section 4.03(F) below) and any site inspection that the Director may conduct, the Director determines that the management practices described in the plans or observed upon the site inspection are not adequate to control and reduce the discharge of sediment, silt, earth, soil, and other materials associated with construction activities to the maximum extent practicable, the Director may issue an order prohibiting the commencement, or the continuation, of any construction activity at the site. Any order issued by the Director under the authority of this Paragraph may be in the form of a Compliance Order under Section 9.01(E), an Emergency Cease and Desist Order under Section 9.01(G), or a Stop Work Order under Section 9.01(H). E. The City may deny approval of any building permit, early grading release, or any other City approval necessary to commence or continue construction, or to assume occupancy, on the grounds that the management practices described in the plans or observed upon a site inspection by the Director are determined not to control and reduce the discharge of pollutants to include but not limited to sediment, silt, earth, soil, and other materials associated with construction activities to the maximum extent practicable. F. Whenever the management practices at a construction site are modified (as a result of change in the construction project, in order to implement more effective management practices, in response to an order or request from the City, or for any other reason), a written description of such modifications of the management practices shall be submitted to the Director as soon as possible, but in no case later than seven calendar days following the change in the management practices.

Ask a question about Arlington law

Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.