§ 4.06 — Post-Construction Structural Controls Annual Inspections and Reporting Requirements
Code of the City of Arlington, Texas (City Secretary chapter PDFs as posted 2026-11-07, each current through the ordinance named on its cover, with the City Secretary's adopted-not-yet-codified Ordinances 25-063, 25-069, 25-073, 25-074, 25-075, 25-084, 26-003, 26-004, 26-019, 26-024 and 26-027 applied; Anti-Discrimination chapter not included) · Arlington City Code, Stormwater Pollution Control Chapter, § 4.06
Corpus is an independent public-information project, not the official City of Arlington website. Stable reference: corpuslaw.us/code/f8122fc9-0031-4074-876a-5a023ee22395
Section 4.06 Post-Construction Structural Controls Annual Inspections and Reporting Requirements
A. Owner(s) of structural controls that discharge or connect to the City of Arlington MS4 or discharge into Waters of the United States within the City of Arlington city limits must conduct, at a minimum, an inspection of each structural control annually. B. Owners of Post Construction Structural Controls shall provide annually, on or before December 31 of each year to the Director of Public Works and Transportation of the City of Arlington or his/her designee, a certified written report prepared by a licensed professional engineer or registered landscape 4.06 architect in accordance with current guidelines found on the City website, which shall specifically describe: 1. an assessment of the condition of the structural control(s), current as of the date of the report. 2. a history of maintenance activities performed on the structural control(s) during the past year. 3. the professional opinion of the licensed professional engineer or registered landscape architect regarding the current functionality of the structural control(s) and its ability to provide TSS removal in accordance with the original design specifications for the structural control(s). 4. recommendations of the engineer regarding the need for maintenance or modification of the structural control(s) to meet original design specifications. C. Owners of Post-Construction structural controls shall utilize a licensed professional engineer or registered landscape architect to perform inspections of structural controls.
Ask a question about Arlington law
Corpus searches the Arlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.
