§ 24-59.2.9 — STORMWATER MANAGEMENT PLAN SUBMITTAL REQUIREMENTS

Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-59.2.9

Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/30a709a9-c16f-4e9c-9a94-d2529b9d9e98

Section 24-59.2.9 - STORMWATER MANAGEMENT PLAN SUBMITTAL REQUIREMENTS

Stormwater management plans shall include, at a minimum, the following: 1. A completed application for the Stormwater Management Permit (Application forms are contained within the Stormwater Management Guidance Manual.); 2. A completed Applicant's Affidavit of Ownership and Designation of Agent form (Forms are contained within the Stormwater Management Guidance Manual.); 3. A vicinity map indicating a north arrow, scale, boundary lines of the site, and other information necessary to locate the development site; 4. The existing and proposed topography of the development/redevelopment or construction site except for individual lot grading plans in single family subdivisions. Existing topography shall be shown by contour lines on a basis of five (5) feet vertical interval unless the shape of the terrain, in the opinion of the City Engineer or his/her authorized designee, warrants two-foot vertical intervals; datum shall be that of the United States Coast and Geodetic Survey. The scale shall not be smaller than one (1) inch equals two hundred (200) feet with contour intervals not greater than five (5) feet, unless variation is specifically approved by the City Engineer or his/her authorized designee; 5. Physical improvements on the site, including present development and proposed development/redevelopment or construction activity; 6. Location, dimensions, elevations, and characteristics of all stormwater management facilities; 7. All areas within the site which will be included in the land disturbing activities shall be identified and the total disturbed area calculated; 8. The location of temporary and permanent vegetative and structural stormwater management control measures; 9. An anticipated starting and completion date of the various stages of land disturbing activities and the expected date the final stabilization will be completed; 10. A determination that no occupied first floor elevation of any structure is below the 100-year plus eighteen (18) inch flood elevation. All development/redevelopment or construction activity shall conform to the "Federal Disaster Protection Act of 1973, Public Law 93-234, passed by the 93rd Congress, H.R. 8449, December 31, 1973 (the latest version thereof); 11. At the reasonable discretion of the City Engineer, for all portions of the drainage system which are expected to carry between fifty (50) and one hundred fifty (150) cfs for the 100-year storm, the 100-year plus eighteen (18) inch flood elevation analysis shall be required. To require the 100-year plus eighteen (18) inch flood elevation analysis, the City Engineer should determine that one (1) of the following conditions may exist: a. The estimated runoff would create a hazard for adjacent property or residents; or b. The flood limits would be of such magnitude that adjacent residents should be informed of these limits; 12. For all portions of the drainage system which are expected to carry 150 cfs or more for the 100-year storm, the 100-year plus eighteen (18) inch flood elevation analysis shall be done and flood limits shall be shown on the stormwater management plans; 13. Stormwater management plans shall include designation of all drainage easements needed for inspection and maintenance of the drainage system and stormwater management facilities and shall comply with Section 24-59.3.3 of this Code; 14. At the reasonable discretion of the City Engineer, a landscape plan for all portions of the drainage system shall be part of the stormwater management plan. This landscape plan shall address the following: a. Tree saving and planting plan; b. Types of vegetation that will be used for stream bank stabilization, erosion control, sediment control, aesthetics and water quality improvement; and c. Any special requirements related to the landscaping of the drainage system and efforts necessary to preserve the natural aspects of the drainage system; 15. To improve the water quality aspects of the drainage system, the stormwater management plan shall include a stormwater pollution prevention plan, as outlined in Section 24-59.4.2 of this Code, to control the water quality of the runoff during the land disturbing activities and during the life of the development as outlined in this Code; 16. The stormwater management plan shall include all engineering calculations needed to design the system and associated structures including pre- and post-development velocities, peak rates of discharge, and inflow and outflow hydrographs of stormwater runoff at all existing and proposed points of discharge from the site. Computer disks and hard copies of all input and output files are to be submitted if a computer model is used; 17. Description of site conditions around points of all surface water discharge including vegetation and method of flow conveyance from the land disturbing activity; 18. Construction and design details for structural controls; 19. The expected timing of flood peaks through the downstream drainage system shall be assessed when planning the use of detention facilities; 20. At the reasonable discretion of the City Engineer, downstream effects from stormwater management structures and the development/redevelopment or construction activity on receiving streams known to have flooding and erosion problems, hydrologic-hydraulic engineering studies shall extend downstream to a point where the proposed development represents less than ten (10) percent of the total watershed; 21. All stormwater management facilities and all major portions of the conveyance system through the proposed development (i.e., channels, culverts) shall be analyzed, using the design and 100-year storms, for design conditions and operating conditions which can reasonably be expected during the life of the facility. The results of the analysis shall be included in the hydrologic-hydraulic study; 22. If the stormwater management plan and/or calculations indicate that there may be a drainage or flooding problem at the exit to the proposed development or at any location between the exit point and the ten (10) percent downstream point, the City Engineer may require: a. Water surface profiles plotted for the conditions of pre- and post-development for the 25-year design storm; b. Water surface profiles plotted for the conditions of pre- and post-development for the 100-year design storm; or c. Elevations of all structures potentially damaged by twenty-five (25) and/or one hundred (100) year flows; 23. All stormwater management plans submitted for approval shall contain certification by the person responsible for the land disturbing activity that the land disturbing activity will be accomplished pursuant to the approved plan and that responsible personnel will be assigned to the project; 24. All stormwater management submittals shall include a proposed inspection and construction control schedule; 25. All stormwater management plans shall contain certification by the person responsible for the land disturbing activity, of the right of the City Engineer to conduct on-site inspections; 26. The stormwater management plan shall not be considered approved without the inclusion of an approval stamp with a signature and date on the plans by the City Engineering Department. The stamp of approval on the plans is solely an acknowledgment of satisfactory compliance with the requirements of these regulations. Approval of construction plans by the City of Laredo Engineering Department is not intended to relieve the owner/developer, consultant engineer, and/or contractor from compliance with the subdivision and stormwater management ordinance and other City ordinance, state and federal regulations, and any liabilities or responsibilities with respect to the design, construction, or operation of the project; 27. A maintenance schedule for the permanent maintenance of all stormwater management facilities; and 28. Approved stormwater management plans remain valid for five (5) years from the date of approval. Extensions or renewals of the plan approvals will be granted by the City Engineer upon written request by the person responsible for the land disturbing activity.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.