Section 24-59.3.2.5.1 - ALLOWABLE DISCHARGE - (PRE/POST ANALYSIS FOR RETENTION/DETENTION FACILITIES)

The ultimate one hundred (100) year design storm event shall be used in determining the required retention/detention volume for the development site. The discharge rate from the facility shall be such that the pre-development discharge rate from the site is not exceeded in the post-developed condition for the design storm event. The precondition discharge rate shall be calculated assuming the proposed site is in a natural state. Upstream adjacent properties shall be considered at their existing conditions, provided that the downstream receiving stream/channel/detention pond can accept additional stormwater runoff volume without causing flooding as determined by the City Engineer.