§ 24-59.3.1.2 — METHOD OF COMPUTING RUNOFF
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-59.3.1.2
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/50c8755a-8baa-4fde-8408-26e5b20e4e23
Section 24-59.3.1.2 - METHOD OF COMPUTING RUNOFF
The basis of computing runoff shall either be the rational formula, or another method deemed acceptable by the City Engineer. Runoff rates for areas greater than one hundred and thirty (130) acres shall use either a unit hydrograph methodology, or another method deemed acceptable by the City Engineer. Where an approved study exists (i.e. FEMA, or other regulatory agency) for areas less than one hundred and thirty (130) acres, the methodology shall match that used in the study unless otherwise dictated by the City Engineer. In all cases, wet antecedent conditions shall be assumed. Run-off rates shall be computed on the basis of ultimate development of the proposed development/redevelopment, or construction activity. Flows from off-site contributing areas draining to, and/or through, the proposed development/redevelopment or construction activity shall be based on the 25-year existing conditions. In order to determine time of concentration, times shall be calculated on the basis of an improved drainage system upstream from the area under consideration. Run-off coefficients shall be obtained from information presented in the Stormwater Management Guidance Manual.
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
