§ 24-59.3.2.5.3 — IMPOUNDMENT DESIGN CRITERIA
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-59.3.2.5.3
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/93a8e991-f68c-45ff-aca6-0343b8a2b72e
Section 24-59.3.2.5.3 - IMPOUNDMENT DESIGN CRITERIA
The steepest side slope permitted shall be 4:1 for a vegetated earth embankment, 2:1 for a rock dam, or as determined by a geotechnical investigation that is certified by a licensed professional engineer and approved by the City Engineer. Earth embankments used to temporarily impound the required detention volume shall be constructed according to standard specifications for fill. These specifications should be, at a minimum, adequate for levee embankments and be based on the City of Laredo standard specifications for embankment, topsoil, sodding, and seeding. Where permanent impoundment is to be provided a geotechnical investigation is required. Based on the geotechnical report more stringent specifications may be required. Embankments, spillways and other appurtenances shall be designed to withstand the pressures of the impounded stormwater. Excavated detention facilities must provide positive drainage with a minimum bottom grade of three-tenths of a percent, 0.3% (0.003/feet). A low flow concrete valley gutter shall also be provided.
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.