§ 24-59.4.2 — STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL AND REVIEW

Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-59.4.2

Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/fcbc07c0-4e9f-487f-86f2-3be5f69caad5

Section 24-59.4.2 - STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SUBMITTAL AND REVIEW

All operators of sites of construction activity, including clearing, grading, excavation, and land filling activities, that result in the disturbance of one (1) or more acres of total land area, or that is part of a common plan of development or sale within which one (1) or more acres of total land area are disturbed, or who are required to obtain an NPDES permit for stormwater discharges associated with construction activity, shall comply as a minimum with the following requirements (in addition to those in Section 24-59.4.1 of this Code and those requirements defined in the most current EPA/NPDES stormwater permit): 1. Any operator who intends to obtain coverage for stormwater discharges from a construction site under the NPDES General Permit for Stormwater Discharges from Construction Sites ("the Construction General Permit") shall submit a signed copy of the Notice of Intent (NOI) to the City Engineer, at least fifteen (15) calendar days prior to the commencement of construction activities. If the construction activity is already underway upon the effective date of this chapter, the NOI shall be submitted within thirty (30) calendar days. For stormwater discharges from construction sites where the operator changes, a revised NOI shall be submitted at least two (2) calendar days prior to when the new operator commences work at the site. 2. A SWPPP shall be prepared and implemented prior to the beginning of construction activities in accordance with the requirements of the Construction General Permit or any individual NPDES permit issued for stormwater discharges from the construction site, and with any additional requirement imposed by or under this Code and any other City Code. 3. The SWPPP shall be prepared, dated, signed, and sealed by a licensed professional engineer. The signature and seal of the licensed professional engineer shall constitute his/her attestation that the SWPPP fully complies with the requirements of the Construction General Permit, or with any applicable individual NPDES permit issued for stormwater discharges from the construction site, and with any additional requirement imposed by or under this Code. The SWPPP shall contain the name, title, and business address of the licensed professional engineer signing it. 4. The SWPPP shall be updated and modified as appropriate and as required by the Construction General Permit and this Code. Any update or modification to the SWPPP shall be prepared, signed, and sealed by a licensed professional engineer. 5. The SWPPP shall be prepared and submitted to the City Engineer at least fifteen (15) calendar days prior to the commencement of construction activities. If the construction activity is already underway upon the effective date of this Code, the SWPPP shall be submitted within thirty (30) calendar days. The SWPPP shall be prepared and submitted to the City Engineer in conjunction with the Stormwater Management Permit and Building Permit application. A Stormwater Management Permit shall be issued prior to commencement of construction activity. 6. A copy of any SWPPP that is required by Section 24-59.4.2 of this Code shall be submitted to the City in conjunction with any application for a building permit, and Stormwater Management Permit, and any other City approval necessary to commence or continue construction at the site. 7. If, upon the City Engineer's review of the SWPPP (or any modification to the SWPPP) and any site inspection that the City Engineer may conduct, the City Engineer determines that the SWPPP does not comply with the requirements of the Construction General Permit, any individual NPDES permit issued for stormwater discharge from the construction site, or any additional requirement imposed by or under this Code, the City Engineer may issue an order prohibiting the commencement, or the continuation, of any construction activity at the site. Also, if at any time the City Engineer determines that the SWPPP is not being fully implemented, the City Engineer may similarly issue an order prohibiting the continuation of any construction activity at the site. Any order issued by the City Engineer under the authority of this paragraph may be in the form of a Compliance Order under Section 24-59.8.5, an Emergency Cease and Desist Order under Section 24-59.8.7, or a Stop Work Order under Section 24-59.8.8 of this Code. 8. Upon review of the SWPPP and any site inspection that is conducted, the City may deny approval of any building permit, Stormwater Management Permit, or any other City approval necessary to commence or continue construction, or to assume occupancy, on the grounds that the SWPPP does not comply with the requirements of the Construction General Permit, any individual or group NPDES permit issued for stormwater discharge from the construction site, or any additional requirement imposed by or under this Code. Also, if at any time the City determines that the SWPPP is not being fully implemented, the City may similarly deny approval of any building permit, stormwater management plan permit, or any other City approval necessary to commence or continue construction, or to assume occupancy, at the site. 9. All contractors and subcontractors identified in a SWPPP shall sign a copy of the following certification statement before conducting any professional service identified in the SWPPP: "I certify under penalty of law that I understand the terms and conditions of the National Pollutant Discharge Elimination System (NPDES) permit that authorizes the stormwater discharges associated with industrial activity from the construction site identified as part of this certification." The certification must include the name and title of the person providing the signature; the name, address, and telephone number of the contracting firm; the address (or other identifying description) of the site; and the date the certification is made. 10. The SWPPP, with the licensed professional engineer's signature, seal, and date affixed, and the certifications of contractors and subcontractors required by Section 24-59.4.2 of this Code, and with any modifications attached, shall be retained at the construction site from the date of commencement of construction through the date of final stabilization. 11. The operator shall make a copy of the SWPPP and any modification thereto available to the City Engineer and any other authorized City inspector at the construction site upon request (as well as to EPA and State inspectors). 12. The City Engineer may notify the operator at any time that the SWPPP does not meet the requirements of the Construction General Permit, any applicable individual NPDES permit issued for stormwater discharges from the construction site, or any additional requirement imposed by or under this Code. Such notification shall identify those provisions of the permit or code which are not being met by the SWPPP, and identify which provisions of the SWPPP require modifications in order to meet such requirements. Within seven (7) calendar days of such notification from the City Engineer, the operator shall make the required changes to the SWPPP and shall submit to the City Engineer a written certification that the requested modifications have been made. 13. The operator shall modify the SWPPP whenever there is a change in design, construction, operation, or maintenance, which has a significant effect on the potential for the discharge of pollutants to the MS4 or to the waters of the United States, and which has not otherwise been addressed in the SWPPP, or if the SWPPP proves to be ineffective in eliminating or significantly minimizing pollutants, or in otherwise achieving the general objective of controlling pollutants in stormwater discharges associated with construction activity. In addition, the SWPPP shall be modified to identify any new contractor and/or subcontractor that will implement a measure in the SWPPP. All modifications to the SWPPP shall be submitted to the City Engineer within seven (7) calendar days of a change, determination of ineffectiveness (self or City inspection), or effective date of changes in contractor and/or subcontractor. 14. Qualified personnel (provided by the operator of the construction site) shall inspect disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site, at least once every seven (7) calendar days and within twenty-four (24) hours of the end of any storm that is zero and five tenths (0.5) inches or greater. Disturbed areas and areas used for storage of materials that are exposed to precipitation shall be inspected for evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control measures identified in the SWPPP shall be observed to ensure that they are operating correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters or the MS4. Locations where vehicles enter or exit the site shall be inspected for evidence of off-site sediment tracking. 15. Based on the results of the inspections required by the Section 24-59.4.2 item 14 of this Code, the site description and/or the pollution prevention measures identified in the SWPPP shall be modified as appropriate, but in no case later than seven (7) calendar days following the inspection. Such modifications shall provide for timely implementation of any changes to the SWPPP within seven (7) calendar days following the inspection. All modifications to the SWPPP shall be submitted to the City Engineer within seven (7) calendar days of the date of inspection. 16. A report log summarizing the scope of any inspection required by the Section 24-59.4.2 item 15 of this Code, and the name(s) and qualifications of personnel making the inspection, the date(s) of the inspection, major observations relating to the implementation of the SWPPP, and actions taken shall be made and retained as part of the SWPPP for at least three (3) years from the date that the site is finally stabilized. Such report shall identify any incidence of noncompliance. Where a report does not identify any incidence of noncompliance, the report shall contain a certification that the facility is in compliance with the SWPPP, the facility's NPDES permit, and this Code. The report shall be certified and signed by the person responsible for making it. 17. The operator shall retain copies of any SWPPP and all reports required by this Code or by the NPDES permit for the site, and records of all data used to complete the NOI, for a period of at least three (3) years from the date that the site is finally stabilized. 18. Where a site has been finally stabilized and all stormwater discharges from construction activities that are authorized by this Code and by the NPDES permit for those construction activities are eliminated, or where the operator of all stormwater discharges at a facility changes, the operator of the construction site shall submit to the City Engineer, a Notice of Termination (NOT). 19. Upon final stabilization of the construction site, the owner (or the duly authorized representative thereof) shall submit to the City Engineer written certification by a licensed professional engineer that the site has been finally stabilized. The City may withhold occupancy or use of permits for any premises constructed on the site until such certification of final stabilization has been filed and the City Engineer has determined, following any appropriate inspection, that final stabilization has, in fact, occurred and that any required permanent structural controls have been completed.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.