§ 24-59.5.4.1 — QUALITY MANAGEMENT CRITERIA

Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-59.5.4.1

Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/a0977610-7d73-42d8-bb21-34bd8481427b

Section 24-59.5.4.1 - QUALITY MANAGEMENT CRITERIA

The criteria of the water quality management for the new development and redevelopment is that the water quality effects of the development should not be significantly different from the water quality effects of the same site before construction. Development/redevelopment within the City of Laredo shall provide, at the minimum, one of the following methods for stormwater treatment, provided that the discharges meet the requirements of the City's stormwater NPDES permit and state water quality criteria. More stringent treatment methods may be required by the City Engineer if discharges fail to meet water quality goals. The drainage area for determining treatment volumes shall include all areas draining to the facility (on-site and off-site). If off-site flows are not commingled with on-site flows prior to treatment, they should not be included in the treatment volume. Method Treatment Volume and Recovery Rate: a. Wet Detention: Wet detention treatment volume shall be, at a minimum, the first one (1) inch of runoff. No more than one-half (½) of the volume may be discharged in the first twenty-four (24) hours. b. Off-line Retention: Off-line retention diverts the first flush of stormwater runoff to a facility separated from the main line stormwater conveyance system. The treatment volume for off-line retention shall be one-half (½) inch of runoff. The treatment volume shall again be available within a minimum of twenty-four (24) hours and a maximum of seventy-two (72) hours following a storm event, with appropriate on-site soils test submitted to verify the infiltration rate. c. On-line Retention or Detention: For on line retention or detention with under drained filtration, treatment volume shall be provided equal to one (1) inch of runoff. Only bottom underdrain systems planted with grass that are capable of recovering the treatment volume within twenty-four (24) hours shall be allowed, to the satisfaction of the City Engineer, to exceed the capabilities of such a bottom underdrain system. Design criteria and design specifications for the water quality treatment methods described above are outlined in the Stormwater Management Guidance Manual.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.