§ 24-59.6.2 — INSPECTION REQUIREMENTS DURING CONSTRUCTION
Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-59.6.2
Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/32d17ec7-72e1-4258-8fe2-417afae08a57
Section 24-59.6.2 - INSPECTION REQUIREMENTS DURING CONSTRUCTION
After commencing initial site operations, regular inspections shall be made at the following specified stage of construction: 1. Infiltration systems at the commencement, during, and upon completion of construction. 2. Flow attenuation devices, such as open vegetated swales, upon the completion of construction. 3. Retention and detention structures at the following stages: a. Upon completion of excavation to sub-foundation and where required, installation of structural supports or reinforcement for structures, including but not limited to: (1) Core trenches for structural embankments; (2) Inlet-outlet structures and anti-seep structures, watertight connectors on pipes; and (3) Trenches for enclosed storm drainage facilities. b. During placement of structural fill, concrete, and the installation of catch basins; c. During backfill of foundations and trenches; d. During embankment construction; and e. Upon completion of final grading and the establishment of permanent stabilization.
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.