For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 24-59.6.3 — FINAL INSPECTION REPORTS

Code of Ordinances, City of Laredo, Texas (Supp. No. 23, Update 3: codified through Ordinance No. 2026-O-92, adopted May 4, 2026) · Laredo Land Development Code § 24-59.6.3

Corpus is an independent public-information project, not the official City of Laredo website. Stable reference: corpuslaw.us/code/a34dee89-3730-48b0-bd31-37d243258984

Section 24-59.6.3 - FINAL INSPECTION REPORTS

A final inspection shall be conducted by the City Engineer or his/her authorized representative upon completion of the stormwater management facility to determine if the completed work is constructed in accordance with the approved plan and this Code. "As-built" certification by a licensed professional engineer licensed in the State of Texas is also required to certify that the facility has been constructed as shown on the "As-built" plans and is substantially compliant with plans and specifications. The developer will receive written notification of the results of the final inspection. The City Engineer shall maintain a permanent file of inspection reports.

Ask a question about Laredo law

Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.