Section 24-59.3.2.6.1 - LAKES AND DAMS
In the event that a property owner or developer desires to modify an existing pond or lake, or desires to impound stormwater by filling or constructing an above-ground dam, thereby creating a lake, pond, lagoon or basin as part of the planned development of that property — the criteria listed below shall be met before City approval of the impoundment can be given. Ponds or lakes created by excavation of a channel area without erecting a dam above natural ground elevation or instream, low water check dams are also subject to the criteria listed below with the exception of spillway capacity requirements. The City Engineer has the final authority to determine the design criteria for a proposed dam, check dam, or excavated lake. The requirements of the State of Texas must also be met for the construction of dams, lakes, and other impoundments. The design criteria for a dam is dependent on the size and hazard classification of the dam. The size and hazard classification will be based on Chapter 12 of the Texas Water Code. The following criteria will be used to classify a dam: 1. Size. The classification for size is based on the height of the dam and storage capacity, whichever gives the larger size category. Height is defined as the distance between the top of the dam (minus the freeboard) and the existing streambed at the downstream toe. Storage is defined as the maximum water volume impounded at the top of the dam (minus the freeboard). Spillway Design Flood (SDF) Hazard | Size | SDF Low | Minor Small Intermediate Large | 100-year ¼ PMF ¼ PMF to ½ PMF PMF Significant | Small Intermediate Large | ¼ PMF to ½ PMF ½ PMF to PMF PMF High | Small | PMF Intermediate | PMF Large | PMF In all cases, the minimum principal spillway design capacity is the one hundred (100) year design flood. In certain cases, a dam breach analysis may be required to determine the proper classification of the structure. For all structures requiring a spillway design flood equal to the Probable Maximum Flood (PMF), a dam breach analysis is required to determine the downstream consequences of a failure. All dams designed for a Spillway Design Flood (SDF) of half (½) PMF or less shall be constructed with a minimum freeboard of two (2) feet above the SDF elevation.
Ask a question about Laredo law
Corpus searches the Laredo sections it holds and shows the ones that match, with their citations. Free, no sign-in.