§ 82-55 — Casing—Generally
Code of Ordinances of the City of Pharr, Texas (Codified through Ordinance No. O-2025-35, adopted September 15, 2025. (Supp. No. 44)) · Pharr Code of Ordinances § 82-55
Corpus is an independent public-information project, not the official City of Pharr website. Stable reference: corpuslaw.us/code/b1e7edf7-0a20-4c57-855b-58b1cde6384a
Sec. 82-55. - Casing—Generally.
In the drilling of an oil and/or gas well, new pipe with a mill test pressure of not less than 1,000 pounds per square inch shall be set for surface casing at a dept of not less than 1,250 feet below the surface and cemented from the bottom of the pipe to the surface with proper mixture of cement. Cementing shall be by the pump and plug method. Cement shall be allowed to stand under pressure a minimum of 24 hours before drilling plug or initiating test. Casing shall be tested by pump pressure in the following manner: remove mud from hole and replace with water; apply pump pressure of at least 1,000 pounds per square inch; if at the end of 30 minutes the pressure shows a drop of 100 pounds or more, casing shall be condemned. After corrective operation, casing shall be condemned. After corrective operation, casing shall again be tested in the same manner until the same shall be found to comply with the above specifications.
(Ord. No. O-2025-25, § 11, 8-11-25)
Ask a question about Pharr law
Corpus searches the Pharr sections it holds and shows the ones that match, with their citations. Free, no sign-in.
