For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 82-59 — Drilling fluid

Code of Ordinances of the City of Pharr, Texas (Codified through Ordinance No. O-2025-35, adopted September 15, 2025. (Supp. No. 44)) · Pharr Code of Ordinances § 82-59

Corpus is an independent public-information project, not the official City of Pharr website. Stable reference: corpuslaw.us/code/3c509060-8d6e-4746-925c-3610f75e32c2

Sec. 82-59. - Drilling fluid.

That after the setting of surface casing, as in this article provided, and drilling operations commenced, there shall be kept at all times a mud laden fluid for drilling purposes of a minimum weight of nine and one-half pounds per gallon and a viscosity not greater than 50 sections based upon the American Petroleum Institute method of testing, and such mud laden fluid shall be tested during drilling operations each eight hours; and just before a well is to be drilled in or a drill steam test made, the mud laden fluid shall be tested while circulating and shall be made to conform to the above specifications before proceeding. When coming out of the hole with the drill pipe, the drilling fluid shall be circulated until equalized, and a fill-up line shall be turned into the casing to always insure a full load of fluid on the bottom of the hole.

(Ord. No. O-2025-25, § 15, 8-11-25)

Ask a question about Pharr law

Corpus searches the Pharr sections it holds and shows the ones that match, with their citations. Free, no sign-in.