§ 82-56 — Same—For production or oil string
Code of Ordinances of the City of Pharr, Texas (Codified through Ordinance No. O-2025-35, adopted September 15, 2025. (Supp. No. 44)) · Pharr Code of Ordinances § 82-56
Corpus is an independent public-information project, not the official City of Pharr website. Stable reference: corpuslaw.us/code/14a18e29-6238-44c9-a30b-c9840ea34c82
Sec. 82-56. - Same—For production or oil string.
In the drilling of an oil and/or gas well, the producing or oil string shall be new casing that has been tested to 3,000 pounds per square inch and after cementing it, it shall be tested by pump pressure in the following manner; pump pressure of at least 3,000 pounds per square inch shall be applied. If at the end of 30 minutes, the pressure shows a drop of 100 pounds, or more, the casing shall be condemned. After corrective operation, the casing shall again be tested in the same manner until the same conforms to the above specifications.
(Ord. No. O-2025-25, § 12, 8-11-25)
Ask a question about Pharr law
Corpus searches the Pharr sections it holds and shows the ones that match, with their citations. Free, no sign-in.