Sec. 82-57. - Determination of position of producing horizon; cementing producing string.
The position of the producing horizon in any oil or gas well shall be determined by coring and/or testing. The producing string shall be cemented at the top of such producing horizon or lower. Cementing shall be by the pump and plug method. A sufficient quantity of cement shall be used so that it will fill the annular space back of the pipe to a distance of not less than 600 feet above shallowest and capable of producing oil or gas in commercial quantities. Cement shall be allowed to stand a minimum of 48 hours under pressure before drilling plug or initiating tests.
(Ord. No. O-2025-25, § 13, 8-11-25)