For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 82-58 — Pressure control equipment

Code of Ordinances of the City of Pharr, Texas (Codified through Ordinance No. O-2025-35, adopted September 15, 2025. (Supp. No. 44)) · Pharr Code of Ordinances § 82-58

Corpus is an independent public-information project, not the official City of Pharr website. Stable reference: corpuslaw.us/code/ba1ff07e-348c-4009-89c5-e36bed49e79f

Sec. 82-58. - Pressure control equipment.

A ram type blow-out preventer, master gate and other connections for keeping any oil or gas well under control at all times shall be installed as soon as pressure is released from the surface casing. The blowout preventer shall be of dual control or of such types of construction and operation as to satisfy any test which may be required by the railroad commission, or city inspector. Blow-out preventer shall be tested at least once every eight hours. All control equipment shall be in good working order and condition at all times and shall have been tested to at least 6,000 pounds pressure.

(Ord. No. O-2025-25, § 14, 8-11-25)

Ask a question about Pharr law

Corpus searches the Pharr sections it holds and shows the ones that match, with their citations. Free, no sign-in.