15.28.070 - URM buildings hazard mitigation process.

The following process shall be followed for abatement of the hazards posed by potentially hazardous URM buildings. A. Establish List and Priority and Notify Owner. The Building Official shall establish and maintain a list of potentially hazardous URM buildings and shall notify the owners in writing that their buildings have been identified as potentially hazardous and of their obligation to mitigate the potential hazard in compliance with this Chapter. The notice shall include the priority level for each building, as determined by the Building Official, and shall refer the owner to the appropriate time period for compliance, as specified in subsection C of this Section. The time period shall commence on the date of the notice. The priority levels for each potentially hazardous URM building will be determined by the Building Official and shall be based on the type of soil on which the building is located, number of stories, pedestrian and vehicle traffic adjacent to the building, use of building, number of occupants and complexity of retrofit work. The owner may appeal the priority level of his or her building in accordance with Section 15.28.160B. B. Filing Engineer's Report and Building Permit Application. The owner shall file with the Building Official an engineering analysis report (EAR) with an acceptable building permit application to comply with the applicable mandatory retrofit standard within the time specified in subsection C of this Section. The requirements of the EAR shall be in accordance with Section 15.28.100. C. Schedule to Complete Work. The owner shall file a building permit application and complete the retrofit work in accordance with the applicable mandatory retrofit standard in Sections 15.28.080B and 15.28.090 within the time specified in the following tables. Failure to comply with the program within the specified time frame shall be in violation of this Chapter and subject to the penalties and remedies described in Sections 15.28.150 and 15.28.160. TABLE 1 — BUILDINGS WITH URM BEARING WALLS PRIORITY LEVEL | SUBMISSION OF BUILDING PERMIT APPLICATION FOR MANDATORY STANDARD (years) | CONSTRUCTION COMPLETE (years) 1 | 1.0 | 2.0 2 | 2.0 | 3.0 3 | 3.0 | 4.0 TABLE 2 — FRAME BUILDING WITH URM INFILL WALLS AND BUILDINGS WITH URM VENEER PRIORITY LEVEL | SUBMISSION OF BUILDING PERMIT APPLICATION FOR MANDATORY STANDARD (years) | CONSTRUCTION COMPLETION (years) 1 | 3.0 | 5.0 2 | 4.0 | 6.0 3 | 5.0 | 7.0 Note: Time interval is measured from the date of the notice. D. Removal of Building from City's URM List. URM bearing wall building, upgraded to the mandatory retrofit standard in Section 15.28.080B, shall be issued a "Certificate of Compliance of the Mandatory Requirements," but remain on the city's list of potentially hazardous URM buildings. After the building has been upgraded or demonstrated to be in compliance with the applicable voluntary standards for URM bearing wall building in Section 15.28.080C or the mandatory standard for URM infill wall and URM veneer building in Section 15.28.090, to the satisfaction of the Building Official and the final inspection of the building permit work is approved, the Building Official shall remove that building from the inventory list of potentially hazardous URM buildings. URM bearing wall building upgraded to the voluntary standard in Section 15.28.080C shall be exempted from any further seismic mitigation legislation per Section 15.28.110. E. Historic Buildings. Prior to the issuance of a building permit for work pursuant to this Chapter, the URM building shall be surveyed and rated by the Oakland cultural heritage survey to determine if the building is a historic structure as defined herein. All historic structures may use the applicable provisions in the State Historical Building Code established under Part 8 in Title 24 of the California Code of Regulations. F. Environmental Impact Mitigation. The owner shall provide advance written notice to tenants of the intent to perform the seismic retrofit activities, apprise tenants of the work schedule, provide dust barriers as needed, avoid unsafe or hazardous conditions for both tenants and construction workers during construction, remove debris, take vermin and pest control measures if necessary, provide alternative services if normal utilities are interrupted, and take corrective measures to minimize safety concerns regarding hazardous materials created by the retrofit activity consistent with the mitigation plan attached to the Negative Declaration ER90-47.

(Prior code § 18-6.07)