§ 19.28.090 — OWTS permit application requirements
Municipal Code, City of Rancho Cucamonga, California (Code 2026-09-02) · Rancho Cucamonga Municipal Code § 19.28.090
Corpus is an independent public-information project, not the official City of Rancho Cucamonga website. Stable reference: corpuslaw.us/code/3e257f8e-a51c-4d33-9b91-10f47b318f8f
§ 19.28.090: OWTS permit application requirements.
The OWTS permit application shall be submitted on a form provided by the city. In accordance with the requirements of the OWTS permit application, the OWTS permit applicant must prepare and submit the following supplemental documents: (1) a percolation test; (2) a proposed layout design; (3) a grading plan; (4) a building plan; (5) access to a potable water supply; and (6) all preliminary plans required for all necessary grading and building permits. These supplemental documents shall be prepared as follows: A. Percolation test required. A percolation test is required when grading or other soil disturbance has occurred in the proposed OWTS location or if the applicant desires not to use the city's standard percolation rates. The applicant shall submit a percolation test report and design as performed by a registered civil engineer, registered geologist licensed by the State of California Board of Professional Engineers. All percolation testing shall be performed in accordance with section 9.28.160. B. Layout design required. With percolation test data and other data in hand, the applicant must develop and submit a layout design for the proposed building project and specific OWTS, for review by the City of Rancho Cucamonga building and safety services department. All OWTS layout design proposals shall demonstrate a 100 percent reserve area for the active OWTS. The layout design must take percolation test data into account. In some cases, additional testing will include depth to groundwater measurements during a normal average rainfall year. In the alternative, the applicant may use the depth to ground water value used by the County of San Bernardino Stormwater Facility Mapping Tool. In some cases, the City of Rancho Cucamonga building and safety services may conclude that a conventional or alternative OWTS cannot be safely used on the lot. Due to the potential for delays or disapproval, City of Rancho Cucamonga building and safety services recommends that applicants submit a layout design and obtain an approval before incurring costs for detailed building plans and architectural fees. The approved layout design will state whether a field check of completed grading by the City of Rancho Cucamonga building and safety services is required. The layout design approval shall expire after one year from the date of issuance. 1. A layout design drawing of the proposed building construction and OWTS is required. This drawing should be prepared using standard engineer's scale on 8.5″ x 11″ or 11″ x 17″ minimum size paper. The basis for the OWTS design will be from percolation testing data and/or conditions of approval from a recorded subdivision map, parcel map, boundary adjustment, or certificate of compliance. The size of the OWTS is a function of the anticipated peak sewage flow based on the number of bedrooms, dwellings or use, and the percolation rate of the soil on the site. 2. The layout design must include the property drawn to the following minimum scales: (i) single-family home or small commercial properties: one inch = 30 feet; (ii) parcel map, subdivisions, large commercial properties: one inch = 40 feet and must also show the proposed system, and 100 percent expansion area, including existing and potential structures, wells, streams, contours, significant vegetation (including trees), rock outcroppings, the location of all borings/tests, and the proposed house pad. 3. The proposed dwelling or development site must be located so the initial subsurface sewage disposal system (and the required 100 percent expansion area) functions by gravity flow, unless otherwise approved. When leach lines or pits serve a common system for two or more units, add 30 percent more square footage to the total absorption area, if approved by the planning department and building and safety services department. 4. The layout design shall contain the following information: (i) site address; (ii) owner's name, mailing address, and phone number; consultant's/contractor's name, mailing address, and phone number; (iii) type of proposed construction (residential vs. commercial); (iv) number of existing or proposed bedrooms; (v) purpose of project (e.g., new dwelling, new structure, guesthouse, an addition, etc.); (vi) specify scope of work; (vii) vicinity map, scale, north arrow, Thomas Bros. Map coordinates; property lines and lot dimensions; (viii) percent slope and direction of fall; (ix) proposed OWTS design detail; (x) all known, recorded easements on or within 20 feet of lot boundaries (open-space, utility, road, waterline, etc.); (xi) source of potable water; location of all public waterlines on or within 20 feet of property; (xii) location of all wells on or within 200 feet of property; and (xiii) any soils testing information, such as deep boring or percolation test, plotted on the design. 5. In preparing a layout design, the following setback requirements shall establish minimum spacing requirements from a component to the OWTS and to structures, property lines, easements, watercourses, wells, or grading: Table 19.28.090.B.3 OWTS Setback Requirements System Component | Setback | Minimum Distance Septic Tank | Structure | 5 feet Septic Tank | Property Line, including the street/public right-of-way | 5 feet Septic Tank | Water Well | 100 feet Septic Tank | Leach Lines | 5 feet Septic Tank | Seepage Pits | 5 feet Leach Lines | Structure | 8 feet Leach Lines | Property Line, including the street/public right-of-way | 5 feet Leach Lines | Water Well | 100 feet1 Leach Lines | Leach Lines | 10 feet center to center distance (See Table Note 6) Leach Lines | Seepage Pits | 5 feet Leach Lines | Water Mains (Public) | 25 feet or 10 feet from the edge of easement Leach Lines | Drainage Course | 50 feet from centerline or top of bank7 Leach Lines | Flowing Stream/Creek | 100 feet from spillway elevation Leach Lines | Pond or Lake | 100 feet from the high water line Leach Lines | Water Supply Reservoir | 200 to 400 feet from the high water line2 Leach Lines | Aqueduct | 5:1 setback to pipeline3 Leach Lines | Road Easements/Right-of-Way | 5 feet from the edge of ultimate easement width4 Leach Lines | Cut Slopes | 5:1 setback from top of cut slope5 Leach Lines | Private Utility Trenches | 56 feet Leach Lines | Ground Water | 5 (vertical) feet Seepage Pits | Structure | 8 feet Seepage Pits | Property Line, including the street/public right-of-way | 8 feet Seepage Pits | Water Well | 150 feet1 Seepage Pits | Seepage Pits | 12 feet from edge of excavation Seepage Pits | Water Mains (Public) | 25 feet or 10 feet from edge of easement Seepage Pits | Drainage Course | 50 feet from centerline or top of bank7 Seepage Pits | Flowing Stream/Creek | 100 feet from edge of flow line or top of bank Seepage Pits | Pond or Lake | 100 feet from the spillway elevation Seepage Pits | Water Supply Reservoir | 200 to 400 feet from the high water line2 Seepage Pits | Aqueduct | 5:1 setback to pipeline3 Seepage Pits | Road Easements/Right-of-Way | 8 feet from edge of ultimate easement width4 Seepage Pits | Cut Slopes | 5:1 setback from top of cut slope5 Seepage Pits | Private Utility Trenches | 56 feet Seepage Pits | Groundwater | 10 feet (vertical) Notes: 1. | The minimum setback required to a public water well is 150 feet and increases to 200 feet where the depth of the dispersal system exceeds 10 feet in depth. The minimum setback may be increased if site conditions show the minimum setback is insufficient to protect groundwater supplies. 2. | Where the dispersal system is within 1,200 feet of surface water intake point, the setback shall be 400 feet. Where the dispersal system is greater than 1,200 feet of the surface water intake point, the setback shall be 200 feet. 3. | Maximum setback of 100 feet. A reduction in setback to 50 feet may be considered with engineering to demonstrate no risk of sewage moving laterally to pipeline trench. 4. | The setback may increase if the 5:1 setback to a road cut is greater than the minimum setback. 5. | This maximum 100-foot setback would also be applied to the top of an eroded bank or natural slope in excess of 60%. A reduction in setback to 50 feet may be considered with engineering to demonstrate no risk of sewage surfacing on the face of the bank or slope. 6. | For trenches less than two feet in depth, a 5:1 setback based on the trench depth can be used. 7. | Setback increases to a 5:1 setback if drainage is greater than 10-foot in depth. 8. | Refer to section 19.28.090 "Siting requirements" for other references. C. Grading plan review. Following layout design review, a grading plan review may be required by the building and safety services department as a condition of approval of the OWTS layout design. A field check may also be required upon completion of grading. D. Building plan review. Plans for a new or second dwellings must be submitted to the planning services department for processing and approval. Upon submittal of the plans, the owner/agent shall meet with staff at the City of Rancho Cucamonga building and safety services counter for a verification of bedrooms and plot plan concurrence with the approved layout. Bedrooms are used to determine the potential occupancy of a dwelling and therefore the potential amount of wastewater that will be generated. Guidelines for determining the number of bedrooms: 1. Once the living room, dining room, family room, kitchen, bathrooms, and utility rooms have been established, all other rooms shall be considered as potential sleeping rooms. Dens, libraries, studies, weight rooms, sewing rooms, workshops, etc., shall be determined as bedrooms if they do not conform to the criteria listed below. 2. All other habitable rooms totaling at least 70 square feet in size are to be considered bedrooms suitable for sleeping purposes, regardless of whether or not they contain closets or have direct access to a bathroom. 3. Rooms that open to a living room, dining room, family room, kitchen, or entry way, and have a single, un-obstructive opening (no doors) with a minimum 50 percent opening of the total wall space (minimum six feet wide) with archways or other acceptable means shall not be considered as bedrooms, due to the lack of personal privacy presented by the opening. 4. Rooms that can only be accessed through another bedroom are to be considered part of that bedroom, such as master suite and not an additional bedroom. 5. Any cases, which will require the relocation or modification of doorways, are to be reviewed and approved by the planning department and building and safety services to address any structural considerations such as load bearing walls. This is to be done prior to approval or sign-off by the City of Rancho Cucamonga building and safety services. E. Proof of potable water supply required. The applicant must demonstrate the proposed development's access to a potable water supply. A public water supply should be confirmed with proof of a service availability letter from the Cucamonga Valley Water District (CVWD), or a water bill showing the property is served by a local water agency. The use of any new domestic water well will require proof of potability and be subject to reviews and approvals by all agencies involved. A copy of the well laboratory report that indicates the absence of bacteria and nitrate contamination of less than 10 mg/L of nitrate-N or 45 mg/L of nitrate will be necessary for proof of potability of a private well. The date of the test cannot be more than one year old. If a valid test does not exist, the well must be sampled by client's consultant for bacteriological and nitrate levels. Hand-dug water wells will not be accepted as a potable water supply. F. The applicant shall submit all preliminary plans and applications to the planning services department for review prior to obtaining all necessary grading and building permits. G. An OWTS installation permit will be valid for 180 days, which period shall commence at the date of issuance. Upon the expiration of the initial 180-day period, the property owner or contractor may request an extension of an additional 180-day period. H. Once the OWTS installation permit has been obtained, the OWTS may be installed. The OWTS shall be inspected by the city building and safety services department before the system may be backfilled. If inspection is satisfactory, the city shall approve a final OWTS permit. Any change in the OWTS plans after the issuance of a permit must first be approved by the director. Failure to obtain approval from the director will invalidate the permit. I. The approval or permit cannot be transferred. Failure to obtain an OWTS permit from the department of building and safety services is a violation of this chapter. The director may revoke a permit or approval issued pursuant to this chapter in case of any false statement, or misrepresentation of fact in the application or on the plans on which the permit or approval was based.
( Ord. No. 911 § 2, 2017 ; Ord. No. 936 § 2, 2018 )
Ask a question about Rancho Cucamonga law
Corpus searches the Rancho Cucamonga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
