§ 19.28.150 — Siting standards
Municipal Code, City of Rancho Cucamonga, California (Code 2026-09-02) · Rancho Cucamonga Municipal Code § 19.28.150
Corpus is an independent public-information project, not the official City of Rancho Cucamonga website. Stable reference: corpuslaw.us/code/170df02b-276f-4c3f-877a-ae7ae9180b1d
§ 19.28.150: Siting standards.
A. Setback requirements. The following table provides the minimum requirements for the installation of OWTS for either new or existing structures. Table 19.28.150.A Setback Requirements Minimum Setback Required From (feet) | Septic Tank | Disposal Field | Seepage Pit Non-Public Water Supply Well 1,8 | 1008 | 1002 | 1502 Public Water Supply Well1 | 100 | 1502 | 200 Buildings or Structures3 | 5 | 8 | 8 Property Line, including Street Right-of-Way Line | 5 | 5 | 8 Streams and Other Flowing Bodies Of Water9 | 100 | 100 | 150 Drainage Course | 50 | 50 | 50 Lakes, Ponds, and Other Surface Water Bodies10 | 200 | 200 | 200 Large Trees4 | 10 | - | 10 Seepage Pits, Outside Perimeter | 5 | 5 | 12 Disposal Field, on Center | 5 | 106 | 5 Onsite Domestic Water Lines (Building Service Line) | 5 | 5 | 5 Public Domestic Water Lines | 25 | 25 | 25 Distribution Box | n/a | 5 | 5 Ground Surface on Sloping Ground | n/a | 15 | 15 Groundwater5 | 5 | 57 | 10 Notes: 1. | Drainage piping will clear domestic water supply wells by not less than 50 feet. This distance will be permitted to be reduced to not less than 25 feet where the drainage piping is constructed of materials approved for use within a building. If the dispersal system does not exceed 10 feet in depth, then the horizontal sanitary setback will be 150 feet. If the dispersal system exceeds 10 feet in depth, then the horizontal sanitary setback will be 200 feet. If the dispersal system exceeds 20 feet in depth, then the horizontal sanitary setback will be 600 feet. 2. | For any system discharging 5,000 gallons per day (GPD), or more, the required setback will be increased to 200 feet. 3. | Includes porches and steps whether covered or uncovered, breezeways, roofed porte cocheres, roofed patios, carports, covered walls, covered driveway, and similar structures or appurtenances. 4. | Any tree with a trunk diameter of one foot or more within five feet of the system that will not be removed during construction. 5. | The highest known level to which groundwater is known to have occurred rather than the level at the time when testing occurred. 6. | Plus two feet for each additional foot or depth in excess of one foot below the bottom of the drain line. 7. | For any system utilizing alternate treatment system and sewage holding tank (Chapter 11), this minimum separation may be reduced to two feet with approval under the Advanced Protection Management Program (APMP) (refer to Chapter 12: Tier 3—Advanced Protection Management Program for Impaired Areas for more information regarding the APMP) and the Regional Water Quality Control Board (RWQCB). 8. | Unless regulatory or legitimate data requirements necessitate that monitoring wells be located closer. 9. | Where the edge of the water body is the natural or levied bank for creeks and rivers, or may be less where site conditions prevent mitigation of wastewater to the water body. 10. | Where the edge of the water body is the high water mark for lakes and reservoirs and the mean high tide line for tidally influenced water bodies. B. On sites with natural slopes of 25 percent or greater, the siting and design of the leaching system shall be performed in accordance with recommendations prepared by a licensed professional geotechnical engineer. C. Criteria specified in Table 19.28.150.A must be met within the area of the proposed system and within the 100 percent expansion area for the proposed system. Depth of earth cover required over the dispersal field is 12 inches. When the dispersal field cannot be installed 12 inches below the ground surface, and meet the above separation requirements, then a supplemental treatment system will be required. D. OWTS located near public water systems shall be subject to increased setback requirements, such as OWTS located with 1,200 feet of a surface water intake. E. Density and minimum lot size requirements. All new development requires a minimum lot size of one-half acre (21,780 square feet), average gross, per dwelling unit, including accessory structures, is required for all new developments, which do not have access to a public sewer as required under section 19.28.040 of this chapter. The public street area adjacent to the net lot area may count towards the minimum one-half acre gross lot size for OWTS. For new development for industrial or commercial properties, the wastewater flow for each one-half acre of land may not exceed that from a single dwelling unit. When determining compliance with this criterion, a flow rate of 300 gallons per day will be considered equivalent to a single-family dwelling unit. This flow rate shall be prorated for commercial or industrial developments with lots smaller than one-half acre, or the equivalent of 20 fixture units. F. Minimum lot size exemptions. 1. The minimum lot size requirements do not apply to existing properties with OWTS which were installed prior to the effective date of the ordinance codified in this chapter. 2. New development occurring upon single-family residences with existing septic systems that will accommodate additional wastewater flows, caused by additional installations such as rooms, bathrooms or accessory structures. A septic certification may be required to verify the septic tank and disposal field capacity to accept additional wastewater flows. 3. Tracts, parcels, and/or commercial/industrial developments which received land use approval from the City of Rancho Cucamonga prior to August 21, 2017 are exempt from the minimum lot size requirements and shall not be less than one-half acre per this chapter for the use of septic tank subsurface disposal systems. 4. New lots, which are smaller than one-half acre, may be formed by combining through a lot merger two or more existing lots which have received land use approval prior to the effective date of the LAMP. Individually, these lots would be eligible for an exemption from the minimum lot size requirement. Developments on combined lots may also qualify for an exemption provided that the total number of units proposed for the new parcel is equal to, or less than the total number of units proposed for the existing parcel and/or when an alternative treatment system is utilized. When requesting to use an alternative treatment system, each system will be reviewed on a case-by-case basis, and will require the approval of building and safety services and the Santa Ana Regional Water Quality Control Board.
( Ord. No. 911 § 2, 2017 ; Ord. No. 936 § 2, 2018 )
Ask a question about Rancho Cucamonga law
Corpus searches the Rancho Cucamonga sections it holds and shows the ones that match, with their citations. Free, no sign-in.
